Development Notes.pdf

PDF 12 KB Posted

Attached to
RECOVERY: BLUE RIVER ROCK CRUSHING & STOCKPILING
Solicitation number
AG-0489-S-10-0125
Issued by

About this file

Development Notes

View the file

Other files

File Type Posted
wage rates.pdf PDF
bid packet.pdf PDF
Vicinity Map.pdf PDF
complete solicitation.pdf PDF
Development Plan.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WILLAMETTE NATIONAL FOREST

DEVELOPMENT PLAN FOR BLUE RIVER ROCK SOURCE

McKenzie River Ranger District

T. 15 S., R 5 E., Section 10 NE SW

GENERAL DEVELOPMENT NOTES

Submit an Operating Plan to the Contracting Officer for approval, prior to any ground disturbing activities. Include bench configuration, access road location, and other operational details related to rock production in the Operating Plan.

Comply with applicable Federal, State and local regulations for the purchase, transportation, storage and use of explosive material, including (but not limited to) MSHA regulation 30 CFR Part 56.

Confine crushing and pit excavation operations within the Development Limits, unless otherwise approved by the Contracting Officer.

Develop and maintain equipment access to the quarry floor, all benches, and the top of the quarry.

All benches utilized or produced by this project shall have a minimum width of 20 feet. Finished faces shall have a maximum height of 30 feet, sloped at 1/4 to 1 (H:V) or flatter, and scaled of loose, overhanging blocks of rock.

Blasting shall be designed, loaded and shot in such a manner as to control and retain material within the area previously disturbed by past quarry operations, as well as to minimize noise disturbance.

Conform operations to Forest Service Industrial Fire Precaution Level work guidelines. Ensure all equipment is maintained with the required fire tools.

The centerline location of Road 15 may be adjusted to accommodate crushing equipment during operations. Submit a Traffic Control Plan for approval prior to rerouting traffic on Road 15.

Slope the quarry floor to drain at the completion of operations. Install water bars with maximum 100 foot spacing and skew of 30 degrees, on all access roads steeper than 5%.

Remove from Forest Service lands all operational debris including (but not limited to) garbage, rubber, metal, paper, or other objectionable material that is inconsistent with a forested setting.

Reduce all oversize material encountered during development and excavation, and utilize in aggregate. Up to 200 CY of oversize material may be stockpiled for future use, as approved by the

Contracting Officer.

The Forest Service has awarded a Timber Sale contract that will utilize aggregate from the existing stockpile on Road 1516005. Schedule activities to assure no delays or interference to the operations of the other contractor, if the projects occur simultaneously.

Attachment 3