AG-0489-S-10-0057_3-lakes-bridge_amend1.pdf
PDF 780 KB Posted
- Attached to
- RECOVERY 3 Lakes Bridge Replacement
- Solicitation number
- AG-0489-S-10-0057
About this file
Amendment One (Revisions to Section B Special Project Specifications Section F and Section J).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 7
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
One (1) 3 December 2009
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
US Forest Service EROC Northwest 16400 Champion Way Sandy, OR 97055
US Forest Service EROC Northwest 16400 Champion Way Sandy, OR 97055
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-0489-S-10-0057
9B. DATED (SEE ITEM 11)
11/27/2009
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
copies to the issuing office.
Revisions have been made to the following sections:
• Section B, Schedule of Items: Item 20424 End Haul: Change units from CYM to CY.
• Special Project Specification 156 Public Traffic
• Section F.2 Commencement, Prosecution, and Completion of Work.
• Section J – 3 Lakes Bridge Replacement Drawing (Sheet 3 of 13)
The closing date/time for receipt of bids remains at December 28, 2009 at 10:00 am
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
PS.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TONYA RYMER
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
12/3/2009 (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES
SCHEDULE OF ITEMS
(REVISED 12/3/2009)
B- 1 - SCHEDULE OF ITEMS
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY
UNIT
PRICE
TOTAL
PRICE
Base Bid *15101 Mobilization LS 1 $_____ $_______ 15707 Straw Bales Each 10 $_____ $_______ 15709 Sandbags Each 10 $_____ $_______ 15710 Sediment traps Each 10 $_____ $_______ *20404 Unclassified Borrow, compaction method B, finishing method B
CY
1,003 $_____ $_______
*20424 Haul CY 5,316 $_____ $_______
20429 End haul CY 50.0 $_____ $_______ *25101 Placed Riprap class 3-6, method A CY 494 $_____ $_______ *30801 Minor crushed aggregate CY
165 $_____ $_______
*55601 Bridge railing LS 1 $_____ $_______ *55601a Bridge approach railing LS 1 $_____ $_______ *57103 Prefabricated bridge superstructure-design, fabricate, deliver and install Foot
80 $_____ $_______
*57105 Prefabricated bridge substructure-design, fabricate, deliver and install
Each 1 $_____ $_______
*62501 Seeding, dry method(without mulch)
Acre 2.0 $_____ $_______
*64801 Stream simulation rock, bed class
CY
272 $_____ $_______
*64851 Rock weirs, FRS class 8 Each 2 $_____ $_______ 65101 Pit development Each
1 $_____ $_______
Contract Total $_______
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted. *Denotes Contract Quantities
Vendor Name: Phone
Signature: Fax Address: Email City, State, Zip: TIN# Duns#
156 - Public Traffic (Revised 12/3/09) 156.00_nat_us_04_06_2005
Delete Section 156 in its entirety and replace with the following:
Description
156.01 This work consists of controlling and protecting public traffic adjacent to and with the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Construction sign panels 633 Retroreflective sheeting 718.01 Temporary concrete barrier 618 Temporary plastic fence 710.11 Temporary traffic control devices 718.22
156.03 General. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed _NA__ minutes at any one time followed by an open period of no less than _N/A_ minutes.
Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved. Post construction signs and traffic control devices in conformance with MUTCD. All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services
Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1.
The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance and 5 days before road closure the contractor will advertise the closure in both Petersburg radio stations, KFSK, and KRSA.
Table 156-1 Temporary Road Closures
Road
Number From
Terminus To
Terminus Maximum
Consecutive Days of Closure
Minimum Consecutive Days Open
6235 19.0 19.5 10 None during 10 day period
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Do not measure Public Traffic for payment. Compensation is made as an indirect payment.
156.03_nat_us_02_24_2005
156.03 Accommodating Traffic During Work.
Delete the following from the last paragraph:
according to Subsection 106.07(b)
156.04_nat_us_02_24_2005
156.04 Maintaining Roadways During Work.
(a) Add the following:
Do not construct detours outside of the clearing limits or use alternate route detours without the approval of the CO.
156.08_nat_us_02_24_2005
156.08 Traffic and Safety Supervisor.
Delete this subsection in its entirety.
SECTION F--DELIVERIES OR PERFORMANCE
(REVISED 12/3/09)
F.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
F.2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 258 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
http://www.arnet.gov/far/�
| SCHEDULE OF ITEMS |
| revised-3 Lakes Bridge _specs.pdf |
| 156 - Public Traffic (Revised 12/3/09) |
| 156.03 Accommodating Traffic During Work. |
| 156.04 Maintaining Roadways During Work. |
| 156.08 Traffic and Safety Supervisor. |
| revised-3 Lakes Bridge _specs.pdf |
| 156 - Public Traffic (Revised 12/3/09) |
| 156.03 Accommodating Traffic During Work. |
| 156.04 Maintaining Roadways During Work. |
| 156.08 Traffic and Safety Supervisor. |
File details come from the government source that posted it. Updated .