AG-0489-S-10-0052_thorne-bay-rd-recon_amend1.pdf
PDF 36 KB Posted
- Attached to
- RECOVERY Thorne Bay Road Reconstruction
- Solicitation number
- AG-0489-S-10-0052
About this file
Amendment 1 (Revises Section C.1 Description of Work)
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
One (1) 9 December 2009
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA Forest Service EROC - Northwest 16400 Champion Way Sandy, OR 97055
USDA Forest Service EROC - Northwest 16400 Champion Way Sandy, OR 97055
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-0489-S-10-0052
RECOVERY Thorne Bay Road Reconstruction
9B. DATED (SEE ITEM 11)
12/07/2009
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
copies to the issuing office.
Section C.1 Description of Work Base Item 1 mileage has been revised from 17.03 to 20.20 miles. The revised Section C.1 is attached.
This solicitation is not extended and continues to close on January 6, 2010 at 2:00 pm PS.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Tonya Rymer, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
C.1 DESCRIPTION OF WORK (REVISED)
Description: This project consists of reconstruction of 20.2 miles of NFSR road including the producing and placing aggregate. All Roads require roadway reconditioning and reconstruction as liseted in the plan, surfacing turnouts 10 feet in width every 500 feet.
• Forest Road 3015000. Surfacing 6 inches deep by 14 feet wide, between MP 0.0 and MP 5.75.
• Forest Road 3013000. Surfacing 6 inches deep by 16 feet wide, between MP 0.0 and MP 1.07.
• Forest Road 3013150. Surfacing 6 inches deep by 16 feet wide, between MP 0.0 and MP 6.06.
• Forest Road 2050000. Surfacing 6 inches deep by 18 feet wide, between MP 0.0 and MP 7.28.
• Forest Road 2050200. Surfacing 6 inches deep by 18 feet wide, between MP 0.0 and MP 0.04.
• Base Item 1: Is for road reconstruction and the development, crushing, haul, placement, and compaction of 20.20 miles of aggregate surfacing 6 inches in depth (width varies between Roads). Scarification is required (FP03-204.09b).
• Option Item 1: Is for road reconstruction and the development, crushing, haul, placement, and compaction of 3.09 miles of aggregate surfacing 6 inches deep by 14 feet wide, plus turnouts 10 feet in width every 500 ft between MP 5.75 and 8.83 on Forest Road 3015000. Scarification is required (FP03-204.09b).
• Option Item 2: Is for the production and stockpiling of 15000 cubic yards of base aggregate, gradation D. The aggregate is to be stockpiled (5000cy) in each of the three pits used to develop rock for this contract and secured by keyed boulders and 3 Gates.
• Option Item 3: Is for road reconstruction and the development, crushing, haul, placement, and compaction of 3.20 miles of aggregate surfacing 6 inches deep by 14 feet wide, plus turnouts 10 feet in width every 500 ft between MP 2.86 and 6.06 on Forest Road 3013150. Scarification is required (FP03-204.09b).
• Ditching: Ditching will be listed in the Work Log and is not continuous throughout the project. The sections of ditch to be cleaned will be flagged by the Government.
Reshaping of culvert inlets and outlets will also be flagged.
• Additional Work: Work will also include, but not be limited to, scarification and shaping of roadbed, pit development and rehab.
The intent of this contract is for the complete production and spread of 20.20 miles of crushed aggregate, plus 3.09 miles of crushed aggregate (Option Item 1) and 15,000 cy of stockpiled aggregate described in this contract. Potential quarries are indicated in the drawings. It is the Contractor’s responsibility to ensure that the selected quarries are adequate as to quality and quanity of aggregate (FP03-105.02a). Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation; and will perform all work required to complete this project in accordance with the drawings, specifications, and provisions of the contract.
Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to, and included in, the payment for the items shown.
C.1 DESCRIPTION OF WORK (REVISED)
File details come from the government source that posted it. Updated .