UPDATED_Schedule_of_Items.pdf

PDF 120 KB Posted

Attached to
Lower Marco Creek Bridge Construction Federal contract opportunity
Solicitation number
AG-046W-S-16-0020
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Updated Schedule of Items

View the file

Other files for this federal contract opportunity

Other files attached to Lower Marco Creek Bridge Construction, newest first.
File Type Posted
Experience_Questionaire.docx DOCX document
Lower_Marco_Plan_Set_(5-11-2016).pdf PDF
Amendment__0001_AG-046W-S-16-0020.pdf PDF
Attachment_1_and_2_Lower_Marco_Creek_Specifications.pdf PDF
Attachment_6_r6-fs-6300-53.rtf RTF text file
Attachment_5_r6-fs-6300-52.rtf RTF text file
Solicitation_AG-046W-S-16-0020_Lower_Marco_Creek_Bridge.pdf PDF
Attachment_3_Lower_Marco_Plan_Set_(4-15-16).pdf PDF
Attachment_4_Wage_Determination_OR1.txt TXT text file
Attachment_7_r6-fs-6300-54.rtf RTF text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

Lower Marco Creek Bridge

Hood River Ranger District

Mt. Hood National Forest

Hood River County

B- 1 - SCHEDULE OF ITEMS

ITEM

NO. DESCRIPTION PAY UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101 Mobilization Lump Sum All $________ $________

15201 Construction survey and staking, method 1, tolerance A Lump Sum All $________ $________

15713 Soil erosion and pollution control Lump Sum All $________ $________

15755 Dewatering structure Each 1 $________ $________

20102 Clearing and grubbing Lump Sum All $________ $________

20305 Removal of structures and obstructions Lump Sum All $________ $________

20401 Roadway excavation, compaction method B *Cubic Yard 130 $________ $________

20418 Drainage excavation, type channel bank material *Cubic Yard 2093 $________ $________

20455 Embankment construction *Cubic Yard 120 $________ $________

20701 Earthwork geotextile, type IV-B *Square Yard 465 $________ $________

20801 Structure excavation *Cubic Yard 155 $________ $________

20803 Structural backfill *Cubic Yard 46 $________ $________

25101 Placed riprap, class 6 *Cubic Yard 312 $________ $________

32203 Aggregate base, grading D, compaction method B *Cubic Yard 121 $________ $________

40401 Minor hot asphalt concrete Ton 76 $________ $________

55109 Steel pipe for concrete filled pipe piles, furnished Foot 210 $________ $________

55156 Concrete filled steel pipe piles, drilled in Foot 135 $________ $________

55151 Furnish pile drilling equipment Lump Sum All $________ $________

55201 Structural concrete class A(AE) *Cubic Yard 63 $________ $________

55301 Precast prestressed concrete structural members, 21" x 55'-0" voided slab Each 4 $________ $________

55401 Reinforcing steel *Pounds 7948 $________ $________

55601 ODOT 2-tube side mount bridge railing Foot 110 $________ $________

56401 Elastomeric bearing device Each 16 $________ $________

57102 Prefabricated bridge superstructure, transport and install

(contractor furnished) Lump Sum All $________ $________

61702 Terminal section, type 2 flared, test level 2 Each 4 $________ $________

61752 Guardrail transition to 2-tube bridge rail Each 4 $________ $________

62529 Seeding and mulching, dry method Lump Sum All $________ $________

63501 Temporary traffic control Lump Sum All $________ $________

64804 Placed streambed simulation rock, bed class 12, method A *Cubic Yard 140 $________ $________

64854 Stream channel rocks, size 3 Each 100 $________ $________

TOTAL ITEMS COST

*Denotes Contract Quantities

B-2 - NOTE:

Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction

Contracts, shall not be in addition to the contract price. Include bond payments under 15101 Mobilization.

Payment will be made on actual work performed as described in FP-03 109.01. All units are measured as Actual

Quantity unless denoted by an asterisk (*). If denoted by an asterisk, the quantity is measured as a Contract

Quantity in accordance with FP-03.