UPDATED_Schedule_of_Items.pdf
PDF 120 KB Posted
- Attached to
- Lower Marco Creek Bridge Construction Federal contract opportunity
- Solicitation number
- AG-046W-S-16-0020
About this file
Updated Schedule of Items
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Experience_Questionaire.docx | DOCX document | |
| Lower_Marco_Plan_Set_(5-11-2016).pdf | ||
| Amendment__0001_AG-046W-S-16-0020.pdf | ||
| Attachment_1_and_2_Lower_Marco_Creek_Specifications.pdf | ||
| Attachment_6_r6-fs-6300-53.rtf | RTF text file | |
| Attachment_5_r6-fs-6300-52.rtf | RTF text file | |
| Solicitation_AG-046W-S-16-0020_Lower_Marco_Creek_Bridge.pdf | ||
| Attachment_3_Lower_Marco_Plan_Set_(4-15-16).pdf | ||
| Attachment_4_Wage_Determination_OR1.txt | TXT text file | |
| Attachment_7_r6-fs-6300-54.rtf | RTF text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I - SCHEDULE OF ITEMS
SECTION B – SERVICES AND PRICES
Lower Marco Creek Bridge
Hood River Ranger District
Mt. Hood National Forest
Hood River County
B- 1 - SCHEDULE OF ITEMS
ITEM
NO. DESCRIPTION PAY UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101 Mobilization Lump Sum All $________ $________
15201 Construction survey and staking, method 1, tolerance A Lump Sum All $________ $________
15713 Soil erosion and pollution control Lump Sum All $________ $________
15755 Dewatering structure Each 1 $________ $________
20102 Clearing and grubbing Lump Sum All $________ $________
20305 Removal of structures and obstructions Lump Sum All $________ $________
20401 Roadway excavation, compaction method B *Cubic Yard 130 $________ $________
20418 Drainage excavation, type channel bank material *Cubic Yard 2093 $________ $________
20455 Embankment construction *Cubic Yard 120 $________ $________
20701 Earthwork geotextile, type IV-B *Square Yard 465 $________ $________
20801 Structure excavation *Cubic Yard 155 $________ $________
20803 Structural backfill *Cubic Yard 46 $________ $________
25101 Placed riprap, class 6 *Cubic Yard 312 $________ $________
32203 Aggregate base, grading D, compaction method B *Cubic Yard 121 $________ $________
40401 Minor hot asphalt concrete Ton 76 $________ $________
55109 Steel pipe for concrete filled pipe piles, furnished Foot 210 $________ $________
55156 Concrete filled steel pipe piles, drilled in Foot 135 $________ $________
55151 Furnish pile drilling equipment Lump Sum All $________ $________
55201 Structural concrete class A(AE) *Cubic Yard 63 $________ $________
55301 Precast prestressed concrete structural members, 21" x 55'-0" voided slab Each 4 $________ $________
55401 Reinforcing steel *Pounds 7948 $________ $________
55601 ODOT 2-tube side mount bridge railing Foot 110 $________ $________
56401 Elastomeric bearing device Each 16 $________ $________
57102 Prefabricated bridge superstructure, transport and install
(contractor furnished) Lump Sum All $________ $________
61702 Terminal section, type 2 flared, test level 2 Each 4 $________ $________
61752 Guardrail transition to 2-tube bridge rail Each 4 $________ $________
62529 Seeding and mulching, dry method Lump Sum All $________ $________
63501 Temporary traffic control Lump Sum All $________ $________
64804 Placed streambed simulation rock, bed class 12, method A *Cubic Yard 140 $________ $________
64854 Stream channel rocks, size 3 Each 100 $________ $________
TOTAL ITEMS COST
*Denotes Contract Quantities
B-2 - NOTE:
Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction
Contracts, shall not be in addition to the contract price. Include bond payments under 15101 Mobilization.
Payment will be made on actual work performed as described in FP-03 109.01. All units are measured as Actual
Quantity unless denoted by an asterisk (*). If denoted by an asterisk, the quantity is measured as a Contract
Quantity in accordance with FP-03.