Attachment_1_and_2_Lower_Marco_Creek_Specifications.pdf
PDF 1 MB Posted
- Attached to
- Lower Marco Creek Bridge Construction Federal contract opportunity
- Solicitation number
- AG-046W-S-16-0020
About this file
Attachment 1 and 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Experience_Questionaire.docx | DOCX document | |
| Lower_Marco_Plan_Set_(5-11-2016).pdf | ||
| UPDATED_Schedule_of_Items.pdf | ||
| Amendment__0001_AG-046W-S-16-0020.pdf | ||
| Attachment_6_r6-fs-6300-53.rtf | RTF text file | |
| Attachment_5_r6-fs-6300-52.rtf | RTF text file | |
| Solicitation_AG-046W-S-16-0020_Lower_Marco_Creek_Bridge.pdf | ||
| Attachment_3_Lower_Marco_Plan_Set_(4-15-16).pdf | ||
| Attachment_4_Wage_Determination_OR1.txt | TXT text file | |
| Attachment_7_r6-fs-6300-54.rtf | RTF text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title Revised
Preface 3/15/2004
101 Terms, Format, and Definitions FP03
101.01 Meaning of Terms 1/22/2009
101.03 Abbreviations 6/16/2006
101.04 Definitions 3/29/2007
102 Bid, Award, and Execution of Contract FP03
102.00 Bid, Award, and Execution of Contract 2/16/2005
103 Scope of Work FP03
103.00 Deletions 2/16/2005
104 Control of Work FP03
104.00 Deletions 6/16/2006
104.06 Use of Roads by Contractor 2/17/2005
105 Control of Material FP03
105.02 Material Sources 1/18/2007
105.05 Use of Material Found in the Work 5/12/2004
106 Acceptance of Work FP03
106.01 Conformity with Contract Requirements 7/31/2007
106.07 Delete 5/11/2004
107 Legal Regulations and Responsibility to the Public FP03
107.05 Responsibility for Damage Claims 5/11/2004
107.06 Contractor's Responsibility for Work 6/16/2006
107.09 Legal Relationship of Parties 6/16/2006
107.10 Environmental Protection 6/16/2006
108 Prosecution and Progress FP03
108.00 108 Delete 2/16/2005
109 Measurement and Payment FP03
109.00 Deletions 2/17/2005
109.02 Measurement Terms and Definitions 6/16/2006
151 Mobilization FP03
152 Construction Survey and Staking FP03
152.00 Construction Survey and Staking 8/5/2005
153 Contractor Quality Control FP03
153.04 Records 12/24/2007
155 Schedules for Construction Contracts FP03
155.00 Delete 5/11/2004
156 Public Traffic FP03
FP-03 SPECIFICATIONS FOR LOWER MARCO CREEK BRIDGE
All specifications not included in the specifications listing, but referenced by listed specifications, are applicable. The supplemental specifications shown on the specification list are physically attached. Section 100 through 149 of the Standard
Specifications and all other Standard or supplemental specifications shown in the specification listing are applicable to this contract.
156.03 Accommodating Traffic During work 2/24/2005
156.04 Maintaining Roadways During Work 2/24/2005
156.08 Traffic and Safety Supervisor 2/24/2005
157 Soil Erosion Control FP03
157.01 Description 2/03/2009
157.02 Materials 2/03/2009
157.03 General 2/03/2009
157.03 General 2/24/2005
157.04 Controls and Limitations on Work 2/03/2009
157.13 Maintenance & Cleanup 2/03/2009
170.00 Develop Water Supply and Watering 3/26/2007
171.00 Weed and Disease Prevention 3/26/2007
201 Clearing and Grubbing FP03
201.00 Deletions 8/5/2009
201.01 Description 2/18/2005
201.06 Disposal 3/26/2007
203 Removal of Structures and Obstructions FP03
203.01 Description 2/25/2005
203.04 Removing Material 2/18/2005
203.05 Disposing of Material 3/26/2007
203.08 Payment 2/24/2005
204.00 Excavation and Embankment 3/26/2009
204.12 Ditches 5/05/2008
204.16 Measurement 5/05/2008
207 Earthwork Geotextiles FP03
208 Structure Excavation and Backfill for Selected Major Structures FP03
208.04 General 8/5/2009
209 Structure Excavation and Backfill FP03
209.07 Dewatering 7/12/2007
251 Riprap FP03
308 Minor Crushed Aggregate FP03
322.00 Minor Aggregate Courses 10/24/2007
404 Minor Hot Asphalt Concrete FP03
404.02 Composition of Mix (Job-Mix Formula) 6/9/2006
404.03 Surface Preparation 6/9/2007
404.04 Weather Limitation 3/2/2005
404.06 Placing 3/2/2005
404.06 Placing 3/23/2007
404.07 Compacting (a) 3/2/2005
404.09 Acceptance 3/2/2005
412 Asphalt Tack Coat FP03
412.07 Acceptance 7/3/2007
551.00 Drilled In Piles 2/26/2016
552 Structural Concrete FP03
552.02 Material 6/20/2007
553 Prestressed Concrete FP03
553.02 Material 6/20/2007
554 Reinforcing Steel FP03
554.03 Order Lists 6/20/2007
555 Steel Structures FP03
556 Bridge Railing FP03
556.01 Description 7/3/2007
562 Temporary Works FP03
564 Bearing Devices FP03
571.00 Prefabricated Bridges 03/15/2005
617 Guardrail FP03
617.02 Material 7/3/2007
625 Turf Establishment FP03
625.03 General 2/25/2005
625.05 Watering 3/30/2005
625.06 Fertilizing 9/17/2008
625.07 Seeding. (a) Dry Method 2/25/2005
625.08 Mulching. (a) Dry Method 1/29/2009
633 Permanent Traffic Control FP03
633.02 Material 3/3/2005
633.03 General 3/3/2005
633.05 Panels 3/3/2005
635 Temporary Traffic Control FP03
635.03 General 5/13/2004
648.00 Stream Simulation 3/26/2007
701 Cement FP03
701.01 Hydraulic Cement 3/31/2015
701.02 Masonry and Mortar Cement 8/5/2009
703 Aggregate FP03
703.05 Sub-base, Base, Surface Course, and Screened Aggregate 8/14/2009
705 Rock FP03
705.07 Streambed Simulation Rock 2/1/2012
705.08 Channel Rock 4/17/2008
709 Reinforcing Steel and Wire Rope FP03
709.01 Reinforcing Steel 7/3/2007
712 Joint Material FP03
712.01 Sealants, Fillers, Seals and Sleeves 3/2/2005
715 Piling FP03
717 Structural Metal FP03
717.01 Structural Steel 8/5/2009
718 Traffic Signing and Mark Material FP03
718.02 Reserved 3/2/2005
718.05 Aluminum Panels 8/5/2009
725 Miscellaneous Material FP03
Lower Marco Creek Bridge
Preface
Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of
National Forest System Roads.
101 - Terms, Format, and Definitions
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association
Mine Safety and Health Administration
National Institute of Standards and Technology
National Electrical Safety Code
West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
http://www.nist.gov/
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition
Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or
“design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96
Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the
Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36
CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - Bid, Award, and Execution of Contract
102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work
103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work
104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material
105.02_nat_us_01_18_2007
105.02 Material Sources.
105.02(a) Government-provided sources.
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work
106.01_nat_us_07_31_2007
106.01 Conformity with Contract Requirements.
Delete Subsection 106.01 and substitute the following:
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the
Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to
106.05 inclusive. The primary method of acceptance is specified in each Section of work.
However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
(1) Sampling method;
(2) Number of samples;
(3) Sample transport;
(4) Test procedures;
(5) Testing laboratories;
(6) Reporting;
(7) Estimated time and costs; and
(8) Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program.
Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol.
If the validity of the Government test results cannot be determined, the Contractor and
Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
Exact time and location of spill including a description of the area involved.
Containment procedures.
Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress
108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.00_nat_us_02_17_2005
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
152 - Construction Survey and Staking
152.00_nat_us_08_05_2005
Description
152.01(c) Material.
Use required stake dimensions and materials. Pre-paint the top 2 inches of all stakes and lath, or mark them with plastic flagging. Use designated colors for paint or flagging. Mark all stakes with a stake pencil that leaves a legible imprint, or with waterproof ink.
Do not use aerosol spray paints.
Use moisture-resistant paper for survey notes. Keep notes in books with covers that will protect the contents and retain the pages in numerical sequence.
Construction Requirements
152.02 General.
Delete the first two sentences.
Add the following:
When indicated on the plans, a preliminary survey line has been established on the ground. The project location line is established by offsets from this preliminary line.
Delete second sentence in second paragraph and replace with the following:
Reestablish missing reference, control lines, or stakes as necessary to control subsequent construction staking operations
152.03 Survey and Staking Requirements.
(b) Roadway cross-sections.
Replace the first two sentences with the following:
Take roadway cross-sections normal to centerline. When the centerline curve radius is less than or equal to 200 feet, take cross-sections at a maximum centerline spacing of 25 feet. When the centerline curve radius is greater that 200 feet take cross-sections at a maximum centerline spacing of 80 feet.
c) Slope Stakes & References:
Replace section with the following:
Slope stakes and references. When required, locate slope stakes on designated portions of the road. Locate the slope stake catch points and use them to establish clearing limits and slope stake references.
Mark slope stakes with the station, the amount of cut or fill, the horizontal distance to centerline, and the slope ratios.
Place slope reference stakes at least 10 feet outside the clearing limit and mark with the offset distance to the slope stake. Place sight stakes when required.
Prior to clearing and grubbing operations, move the slope stake outside the clearing limit to the slope reference stake. After clearing and grubbing and before excavation, reset the slope stakes in their original position.
Use the designated method to establish the slope stake catchpoint.
Method I—Computed Method. Use the template information shown in the plans or other
Government-provided data to calculate the actual location of the catchpoint. The slope stake “catchpoint distance” provided may be used as a trial location to initiate slope staking. Recatch slope stakes on any section that does not match the staking report within the tolerances established in Table 152-2.
Method II—Catchpoint Measurement Method. Determine the location of slope stake catchpoints by measuring the catchpoint distances shown in the plans or other
Government-provided data.
(d) Clearing and grubbing limits.
Add the following:
Establish clearing limits on each side of the location line by measuring the required horizontal or slope distances shown in the stake notes. Mark the clearing limits with flagging or tags on trees to be left standing, or on lath. Make markings intervisible, and no more than 90 feet apart.
After establishing clearing limits, move the location line stake outside the clearing limits for station identification purposes, and mark it with horizontal distance to location line
(e) Centerline reestablishment.
Replace with the following:
Reestablish centerline from instrument control points. The maximum spacing between centerline points is 25 feet when the centerline curve radius is less than or equal to 200 feet. When the centerline curve radius is greater than 200 feet, the maximum distance between centerline points is 80 feet.
(g) Culverts.
Replace subsection with the following:
Set culvert reference stakes at all culvert locations. Set a culvert reference stake on the centerline of the culvert 10 feet from each end or beyond the clearing limit, whichever is greater. Record the following on culvert reference stakes:
(1) Diameter, actual field measured length, and type of culvert.
(2) The vertical and horizontal distance from the reference stake to the invert at the ends of the culvert.
(3) Station of actual point where culvert intersects centerline.
When required, stake headwall for culverts by setting a hub with a guard stake on each side of the culvert on line with the face of the headwall. Perform this work after clearing is completed.
152.03 (l) Miscellaneous Survey and Staking.
(11) Cattleguards
(12) Drain Dips
(13) Erosion Control Measures
Replace Table 152-1 with the following two tables:
Table 152-1 Tolerances for reestablishing P-line, traverse, and elevations.
Precision
Class
Minimum
Position
Closure Angular Accuracy (±)
L-Line Tangent
Control Pointsa
Vertical Closureb
A
(Bridges) 1/10,000
2 sets, direct/reverse
10 second rejection limit
N/A
0.02 ft or
0.02ft/1000ftc
B 1/5,000
2 sets, direct/reverse
20 second rejection limit
0.1 ft
0.02 ft or
0.02ft/1000ftc
C 1/1,000 1 set, direct/reverse
1 minute rejection limit
0.2 ft 0.5ft/1000ftc
D 1/300
Foresight and backsight;
15 minute rejection limitc
0.4 ft 1.0ft/1000ftc
E 1/100
Foresight and backsight;
30 minute rejection limitc
0.8 ft 1.0ft/1000ftc
a. Accuracy of offset measurement.
b. Determine vertical closures at intervals not to exceed 2000 ft as measured along centerline.
c. Use greater value.
Table 152-2 Cross section and slope stake tolerances.
Item Tolerances
A B C D E
Allowable deviation of cross-section line projection from a true perpendicular to tangents, a true bisector of angle points, or a true radius of curves
(±)2o (±)3o (±)3o (±)5o (±)5o
Take cross-sections topography measurements so that variations in ground from a straight line connecting the cross-section points will not exceed
0.5 ft 1.0 ft 2.0 ft 2.0 ft 3.0 ft
Horizontal and vertical accuracy for cross-sections, in feet or percentage of horizontal distance measured from traverse line, whichever is greater.
0.1 ft or
0.4%
0.15 ft or 0.6%
0.2 ft or
1.0%
0.2 ft or
1.0%
0.3 ft or
1.0%
Horizontal and vertical accuracy for slope stake, slope stake references, and clearing limits. In feet or percentage of horizontal distance measured from centerline or reference stake, whichever is greater.
Slope reference stakes and slope stakes. 0.1 ft or
0.4%
0.15 ft or 0.6%
0.2 ft or
1.0%
0.2 ft or
1.0%
0.3 ft or
1.0%
Clearing limits 1.0 ft 1.0 ft 1.0 ft 1.5 ft 2.5 ft
153 - Contractor Quality Control
153.04_nat_us_10_24_2007
153.04 Records.
Delete all but the first sentence
155 - Schedules for Construction Contracts
155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety.
156 - Public Traffic
156.03_nat_us_02_24_2005
156.03 Accommodating Traffic During Work.
Delete the following from the last paragraph:
according to Subsection 106.07(b)
156.04_nat_us_02_24_2005
156.04 Maintaining Roadways During Work.
(a) Add the following:
Do not construct detours outside of the clearing limits or use alternate route detours without the approval of the CO.
156.08_nat_us_02_24_2005
156.08 Traffic and Safety Supervisor.
Delete this subsection in its entirety.
157 - Soil Erosion Control
157.01_0618_us_02_03_2009
157.01 Add the following:
This includes protection of all phases of work during the life of the contract including storm events.
Materials
157.02 Add the following:
Coarse Aggregate for Concrete...…………………………………703.02
Watertight Gaskets………………………………………………..712.03
157.03 General. Add the following:
21 days prior to the start of construction, submit a written plan that provides specific sediment control measures to minimize delivery of soil and turbidity into the stream during the construction period including a channel diversion and dewatering plan if dewatering is required.
Include the sequence of operations and information on equipment, materials and suppliers.
Measures given in the Plans and Supplemental Specifications are minimum requirements, and may be revised only with written approval by the CO.
The turbidity of the water 100-200 feet downstream shall not be visually greater than the turbidity of the water upstream of the project site.
When this turbidity requirement or other erosion control measures are not met, immediately take corrective action. Cease operations that are causing turbidity and pump or otherwise improve the diversion of the stream around the construction site according to this specification and the Plans until the turbidity requirement can be met. When the interpretation of this requirement is in question, measure turbidity using a turbidity meter as approved by the CO, and provide documentation that operations are in compliance with FAR 52.236-7 Permits and
Responsibilities, subsection 107.01 Laws to be Observed and subsection 107.10 Environmental
Protection, and subsection 107.11, including but not limited to, the requirements of the National
Marine Fisheries Service.
Do not begin work until the necessary controls for that particular phase of work have been implemented. Incorporate all erosion control features into the project at the earliest practicable time, as agreed by the CO.
Operate in a manner that will avoid harm to aquatic organisms whenever possible.
Notify the CO of the intention to dewater the stream, at least 10 days in advance. Do not re-route the stream until approved by the CO. The CO will not approve dewatering until a fisheries biologist and other Government personnel are present and prepared to rescue aquatic organisms.
Dewater the stream slowly and incrementally in order to facilitate the fish rescue. The rescue operation will generally take several hours.
Do not release water through the newly constructed simulated streambed until approved by the
CO. After approval, release water slowly and incrementally over a period of at least one hour, or as approved by the CO. During this time, treat any water that does not meet the requirements of the turbidity standard stated in this specification.
157.04 Controls and Limitations on Work. Add the following:
Prior to construction, Contracting Officer will delineate critical riparian vegetation areas, wetlands, and other sensitive sites to prevent ground disturbance. Minimize disturbance to existing vegetation along stream.
Where necessary, danger tree removal may be required. Fell danger trees within riparian areas.
Where possible, fell trees towards the stream. Dispose of trees as directed by the Contracting
Officer.
Confine work within the construction limits marked by the Contracting Officer. Use existing roadways or travel paths whenever reasonable. Minimize the number of new access paths.
Dispose of waste material at approved sites.
When erosion control materials are to be left on site after the project has been completed, construct erosion controls of organic and bio-degradable materials whenever possible.
157.04(b) Add the following:
For the work immediately adjacent to the stream, use sediment control barriers between the work and the stream. Place sediment barriers prior to construction around sites where significant levels of erosion may enter the stream directly or through road ditches.
Provide straw bales and silt fence for sediment control measures for each channel crossing being constructed concurrently. Use only as needed for sediment control or when specified by the
Contracting Officer.
Provide waterproof membrane products to cover all stockpiled material adjacent to a live stream that is subject to erosion or water saturation. Cover stockpiles at the end of each work day and all day during the threat of precipitation or when specified by the Contracting Officer.
157.04(d) Delete the subsection and replace with the following:
Apply temporary turf establishment, mulch and stabilization measures on disturbed areas within three days of the last disturbance. Short-term stabilization measures may include the use of non-native sterile seed mix when native seeds are not available; weed-free certified straw, jute matting, and other similar techniques. Maintain short-term stabilization measures until permanent erosion control measures are effective.
157.04(f) Add the following:
When required by the Contracting Officer, loosen compacted areas, such as access roads, stream crossings, staging, and stockpile areas.
157.09 Diversions. Add the Following:
Construct stream diversion, related appurtenances and measures as follows:
(a) In Stream Work.
(1) Isolate construction area and coordinate with Contracting Officer for aquatic species removal by the Government. Coordinate aquatic species removal a minimum of 10 working days prior to beginning isolation of construction areas.
(2) Cease project operations under high flow conditions that inundate the project area, except for efforts to avoid or minimize resource damage.
(3) When approved, minimize time in which heavy equipment is in stream channels, riparian areas, and wetlands. Operate heavy equipment in streams only when
Contracting Officer determines that such actions are the only reasonable alternative for implementation, or would result in less sediment in the stream channel or damage (short- or long-term) to the overall aquatic and riparian ecosystem relative to other alternatives.
(4) Clean and repair all equipment used in the in-stream work prior to entering the project area. Remove external oil and grease, along with dirt and mud, prior to construction. Inspect equipment daily for leaks or accumulations of grease, and repair any identified problems prior to entering streams or areas that drain directly to streams or wetlands.
(5) Fuel and service equipment used for in stream or riparian work in an approved staging area outside of riparian zone. When not in use, store vehicles in the staging area.
(b) Stream Bypass Dam and Pipe. Construct a dam of material handling bags, and bypass pipe as shown on the Plans or as approved by the CO. The mining of material from the streambed or floodplain to construct diversions is not permitted. If diversion allows for downstream aquatic species passage, (i.e., is not screened), place diversion outlet in a location to promote safe reentry of aquatic species into the stream channel, preferably into pool habitat with cover.
(1) Primary Bypass Dam. Construct the material handling bag dam in a dry condition by first pumping the stream around the dam. Place temporary cofferdams as needed. Remove rock and other irregularities from the streambed to form smooth bedding for the bypass dam. Place the dam so that water does not seep from the downstream side of the dam; if seepage occurs, improve the dam by adding bags, improving or adding seals, or other means to minimize seepage from the dam.
When it is impossible to eliminate seepage, construct a sump and pump clear water to the upstream side of the dam.
(2) Bypass Dam Impermeable Membrane. Place an impermeable membrane within or on the upstream side of the dam and entrenched in the streambed as shown on the
Plans or approved by the CO. When approved by the CO, a small amount of granular bentonite may be used along the edges of the membrane to minimize seepage between the membrane and the streambed. Cut a hole in the membrane to fit the bypass pipe and seal the membrane to the bypass pipe or the bypass pipe collar using gaskets, adhesive strips or other approved methods.
(3) Bypass pipe. Place bypass pipe as shown on the Plans or approved by the CO.
Place the upstream invert of the pipe at the lowest point in the stream channel as practical. Install joints and elbows as shown on the Plans and as needed to accommodate the site layout. Use watertight seals meeting the requirements of
Subsection 712.03. Do not place backfill until the pipe joints have been approved by the CO. Allow water to pass through pipe only after a downstream splash apron has been prepared in a manner that will protect the stream from scour and turbidity, and protect fish from harm. Construct the bypass in a manner that avoids injury to aquatic organisms.
(4) Material handling bags. Use only clean sand or coarse concrete aggregate in the bags. Loosely fill and tamp the bags in place to minimize seepage between, under, and around the bags.
(5) Bypass Pipe Collar. Install and maintain a leak-proof pipe collar as shown on the
Plans or approved by the CO.
(6) Sediment Retention Pond. Provide a pond immediately downstream of the construction area capable of collecting and holding all seepage, drainage, and sediment not captured in stream diversion. Provide sufficient storing capacity to enable a sump pump to transfer the water, sediment and turbidity to a suitable treatment facility or area. Construct a downstream cofferdam to create a sediment retention pond when none is available immediately downstream of the project, when it is too small to use or to prevent water from entering the work area.
(c) Pumps. Install pumps as required to re-route stream around construction site and dewater foundations. When failure of a pump would result in movement of sediment or turbidity beyond the work area, provide a back-up pump that is readily available. When adjacent stream crossing projects are constructed concurrently, provide a minimum of one extra pump on site for the largest discharge site. Use the pumps for installing and removing the gravity bypass pipes and dams, at other times to facilitate construction operations, and during storms to supplement the gravity bypass. Pumps must have fish screens if used in streams where aquatic species are present and be operated in accordance with National
Marine Fisheries Service (NMFS) aquatic species screen criteria. Equip the pump with approved screens, appropriate suction and discharge hoses, fittings and flow regulation equipment as needed. Insure that the pumps are clean, free of leaks and that the oil used as lubricant in the pump seal systems is food grade mineral oil. Install and operate pumps in a manner that will avoid impingement of small fish against the intake screens.
(1) Pump intakes. Use one of the following methods of screening on all draft hoses:
i. Perforated Plate; screen openings shall not exceed 3/32 or 0.0938-inches
ii. Profile Bar Screen; the narrowest dimension in the screen openings shall not exceed 0.0689-inches in the narrowest direction.
iii. Woven Wire Screen; screen openings shall not exceed 3/32 or 0.0938-inches the narrow direction.
Check intakes frequently and clean as needed with wire brushing, flushing, or any other acceptable method.
(2) Sump Pumps. Supply pumps capable of dewatering the structure foundation and sediment retention pond. Insure that pumps are clean and free of leaks. Remove sediment and turbidity in the Sump Pump discharge water prior to re-entering the stream.
(d) Sump Water Discharge. Discharge sump water as shown on the Plan or as approved by the
CO. Apply one or more methods to remove sediment from sediment-laden water. Apply additional methods as needed to eliminate increase in downstream turbidity. Use the following methods as needed:
(1) Natural Vegetation/Soil Dispersal and Filtration. Discharge sump water onto areas of ground most advantageous for dispersal and filtration of sediment, e.g. flat heavily vegetated soil. When single point discharge does not function adequately, discharge water into a perforated pipe or series of pipes laid approximately level so that the brown water disperses over a wide area.
(2) Silt Bag Filtration. Discharge sump water into one or more silt bags. Silt bags are constructed of Mirafi 180N (or approved equal) with sewn seam strengths of 90% efficiency according to ASTM D4632. Construct bag to hold and filter sump water. Place silt bag(s) on level ground having layer of straw one foot thick minimum.
(3) Settling Basin. Discharge sump water into one or more basins. The basins may be pre-manufactured tanks, folding tanks, geotextile or membranes placed over a sandbag or weed-free straw berm, or other similar basins designed to separate sediment from the water.
(4) Suspended Sediment Coagulation Agent. When other methods do not function adequately, add an approved coagulation agent to water prior to discharging the water onto natural vegetation, silt bag, or settling basin. Use a flocculation agent such as Chitisan-based Storm-Klear Gel-Floc, or approved equal. Use suspended sediment coagulation agent according to manufacturer’s recommendations.
(e) Stream Re-Watering. Monitor downstream during rewatering to prevent stranding of aquatic organisms below the construction site. Ensure that concrete is sufficiently cured or dried before coming into contact with stream flow.
157.13 Maintenance & Cleanup. Add the following:
When removing sandbags, spread sand away from the waterway; if coarse concrete aggregate meeting the requirements of Subsection 703.02 is used in the sandbags, the gravel may be distributed evenly across the waterway.
Remove geotextile and other non-biodegradable materials used in dewatering and sediment control operations from Government property, unless otherwise approved by the CO.
157.03_nat_us_02_24_2005
157.03 General
Delete the entire subsection and replace with the following:
Prior to the start of construction, submit a written plan that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction.
Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control. An alternate erosion control plan with all necessary permits may be submitted 30 days before intended use.
Incorporate all permanent erosion control features into the project at the earliest practicable time, as outlined in the approved plan.
When erosion control measures are not functioning as intended, immediately take corrective action.
170 - Develop Water Supply and Watering
170.00_0618_us_03_26_2007
Description
170.01 This work consists of developing an acceptable water supply, furnishing, hauling, and applying water.
Materials
170.02 Conform to the following subsection.
Water 725.01.
170.03 Development of Supply & Access. Develop water supplies and access to the water supplies as required. Use designated water sources or other approved water sources. Before using non-designated water sources, obtain all necessary permissions, water rights, and permits.
170.04 Equipment.
(a) Water tanks. Provide mobile watering equipment with watertight tanks of known capacity.
Provide for positive control of water application from the driver’s position.
(b) Juvenile fish protection. All draft hoses being used to withdraw water from any live flowing stream or pond will utilize one of the following methods of screening.
(1) Perforated plate: Screen opening shall not exceed 3/32 or 0.0938-inches.
(2) Profile bar screen: The narrowest dimension in the screen openings shall not exceed
0.0689-inches in the narrowest direction.
(3) Woven wire screen: Screen openings shall not exceed 3/32 or 0.0938-inches in the narrow direction.
All methods shall be cleaned frequently with either wire brushing, flushing or other acceptable method.
170.05 Application. Apply water uniformly without ponding or washing.
170.06 Acceptance. Developing water supplies and watering will be evaluated under
Subsections 106.02 and 106.04.
Measurement and Payment
170.07 See Subsection 109.05.
Do not measure develop water supply and watering for payment.
171 - Weed and Disease Prevention
171.01_0618_us_03_26_2007
171.01 This work consists of washing and treating construction equipment to remove seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest
System lands.
Material
171.02 Conform to the following Subsection:
Water 725.01
171.03 General . Notify the CO in writing at least 15 days before moving any construction equipment onto National Forest System lands. Construction equipment does not include cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas outside of National Forest System lands.
Perform all work at a location designated on the plans or other locations approved in writing.
Provide the CO with an opportunity to monitor the washing and inspection.
171.04 Equipment. Use a high pressure washing system.
For work on National Forest System lands, use a washing system that traps all wash water and either stores it for removal from National Forest System lands or recycles the water for continued use. If the equipment recycles the water, provide adequate filters for seed removal. Dispose of the filter material and removed seeds in an approved manner. Do not mix soaps, detergents, or other chemicals with the wash water.
For work at a commercial washing facility, use an approved facility.
171.05 Washing. Wash the sides, tops, and undercarriages of all construction equipment.
Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment.
171.06 Inspection. Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment. All subsequent move-in of equipment to the project area shall be treated in the same manner as the intial move-in and are the responsibility of the contractor. Rewash the construction equipment as necessary or as directed.
171.07 Acceptance. Weed prevention will be evaluated under Subsection 106.02.
Measurement
171.08 Do not measure weed prevention for payment.
Payment
171.09 Include all costs associated with the Section 171-Weed Prevention in the unit price for
Section 151-Mobilization.
201 - Clearing and Grubbing
201.00_nat_us_08_05_2009
201.00 Deletions:
Delete Tree wound dressing material reference.
201.03 General.
Delete the last sentence.
201.04 Clearing.
Delete the last sentence of (d).
201.01_nat_us_02_18_2005
201.01 Description
Replace with the following
This work consists of clearing and grubbing within clearing limits and other designated areas.
201.06_0618_us_03_26_2007
201.06 Disposal
Delete the first sentence of this subsection.
203 - Removal of Structures and Obstructions
203.01_nat_us_02_25_2005
203.01 Description.
Delete and replace with the following:
This work consists of disposing of construction slash and debris, salvaging, removing, and disposing of buildings, fences, structures, pavements, culverts, utilities, curbs, sidewalks, and other obstructions.
203.04_nat_us_02_18_2005
203.04 Removing Material.
Replace the fourth and fifth paragraphs with the following:
Where part of an existing culvert is removed, remove the entire culvert upstream from the removal. The remaining downstream culvert may be left in place if no portion of the culvert is within 12 inches of the subgrade, embankment slope, or new culvert or structure; and the culvert ends are sealed with concrete.
Remove structures and obstructions in the roadbed to 12 inches below subgrade elevation.
Remove structures and obstructions outside the roadbed to 12 inches below finished ground or to the natural stream bottom.
203.05_0618_us_03_26_2007
203.05 Disposing of Material.
Add the following:
(e) Windrowing Construction Slash. Place construction slash outside the roadway in neat, compacted windrows approximately parallel to and along the toeline of embankment slopes. Do not permit the top of the windrows to extend above subgrade. Use construction equipment to matt down all material in a windrow to form a compact and uniform pile. Construct breaks of at least 15 feet at least every 200 feet in a windrow. Do not place windrows against trees. Obtain approval for pioneer roads. A pioneer road may be constructed to provide an area for placement of windrows, provided the excavated material is kept within the clearing limits and does not adversely affect the road construction.
(f(1)) Scattering method outside clearing limits. Scatter construction slash outside the clearing limits without damaging trees. Limb all logs. Place logs and stumps away from trees, positioned so they will not roll, and are not on top of one another. Limb and scatter other construction slash to reduce slash concentrations.
(f(2)): Scattering method inside clearing limits. Scatter pieces of wood less than 3 inches in diameter and 3 feet in length within the clearing limits. Do not place construction slash in lakes, meadows, streams, or streambeds. Immediately remove construction slash that interferes with drainage structures.
(g) Chipping or Grinding. Use an approved chipping machine to grind slash and stumps greater than 3 inches in diameter and longer than 3 feet. Deposit chips or ground woody material on embankment slopes or outside the roadway to a loose depth less than 6 inches. Minor amounts of chips or ground woody material may be permitted within the roadway if they are thoroughly mixed with soil and do not form a layer.
(h) Debris Mat. Use tree limbs, tops, cull logs, split stumps, wood chunks, and other debris to form a mat upon which construction equipment is operated. Place stumps upside down and blend stumps into the mat.
(i) Decking Firewood Material. Remove brush from decks. Limb and deck logs that do not meet Utilization Standards according to Subsection 201.04 as directed by the CO. Cut logs to lengths less than 30 feet. Ensure that logs stacks are stable and free of brush and soil.
(j) Removal to designated locations. Remove construction slash to designated locations.
(k) Piling. Pile construction slash in designated areas. Place and construct piles so that if the piles are burned, the burning will not damage remaining trees. Keep piles free of dirt from stumps. Cut unmerchantable logs into lengths of less than 20 feet.
(l) Placing Slash on Embankment Slopes. Place construction slash on completed embankment slopes to reduce soil erosion. Place construction slash as flat as practicable on the completed slope. Do not place slash closer than 2 feet below subgrade. Priority for use of available slash is for: (1) through fills; (2) insides of curves; and (3) ditch relief outlets.
(m) Hydrological Sensitive Placement. Where required use this method in combination with other designated methods to dispose of material to reduce erosion and to aid in re-vegetation:
1. Place windrow segments on contours, wrap in type I geotextile.
2. Place logs as log erosion barriers on contours. Place logs so that 80% of their length is on the ground surface.
3. Scatter slash on bare or disturbed areas within or outside the clearing limits as directed.
4. Scatter chips or ground woody material on bare or disturbed areas within or outside the clearing limits as directed.
Place stumps in swales or on sites to form planting pockets. Place windrow segments on contours, wrap in type I geotextile.
203.08_nat_us_02_24_2005
203.08 Payment
Add the following:
Disposal of construction slash will be compensated under the designated pay item in Section
201.
204 - Excavation and Embankment
204.00_nat_us_03_26_2009
Replace Section 204 in its entirety with the following:
204.01 This work consists of excavating material and constructing embankments. This includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material.
204.02 Definitions.
(a) Excavation. Excavation consists of the following:
(1) Roadway excavation. All material excavated from within the right-of-way or easement areas, except subexcavation covered in (2) below and structure excavation covered in Sections 208 and 209. Roadway excavation includes all material encountered regardless of its nature or characteristics.
(2) Subexcavation. Material excavated from below subgrade elevation in cut sections or from below the original groundline in embankment sections. Subexcavation does not include the work required by Subsections 204.05, 204.06(b), and 204.06(c).
(3) Borrow excavation. Material used for embankment construction that is obtained from outside the roadway prism. Borrow excavation includes unclassified borrow, select borrow, and select topping.
(b) Embankment construction. Embankment construction consists of placing and compacting roadway or borrow excavation. This work includes:
(1) Preparing foundation for embankment;
(2) Constructing roadway embankments;
(3) Benching for side-hill embankments;
(4) Constructing dikes, ramps, mounds, and berms; and
(5) Backfilling subexcavated areas, holes, pits, and other depressions.
(c) Conserved topsoil. Excavated material conserved from the roadway excavation and embankment foundation areas that is suitable for growth of grass, cover crops, or native vegetation.
(d) Waste. Excess and unsuitable roadway excavation and subexcavation that cannot be used.
204.03 Conform to the following Subsections:
Backfill material 704.03
Select borrow 704.07
Select topping 704.08
Topping 704.05
Unclassified borrow 704.06
204.04…
This is the start of the file's text. The full file is on GovTribe.