Attachment 6 Additional Fire Precautionary Measure 1 Tank Truck (R6-FS-6300-53)

Text of this file

R6-FS-6300-53 (5/89)

USDA FOREST SERVICE

PACIFIC NORTHWEST REGION

FIRE PROTECTION AND SUPPRESSION

Additional Fire Precautionary Measure 1 - Tank Truck

11.

The Contractor shall provide a tank truck or trailer, containing not less than 300 gallons of water, during yarding, loading, land clearing, right-of-way clearing and mechanical treatment of slash. A tank truck or trailer will not be required if powersaw falling and bucking is the only operation. Such tank truck or trailer shall be maintained in a serviceable condition and located within 10 minutes, round trip, from each project area during fire period and closed seasonFire Period and Closed Season.

The tank truck or trailer shall be equipped with a pump capable of discharging 20 gallons of water per minute, using a 1/4 inch nozzle tip, through a 50 foot length of rubber line hose. In addition, 500 feet of serviceable fabric jacket rubber lined hose of not less than 1 inch outside diameter, fitted with a nozzle capable of discharging a straight stream of 1/4 inch diameter and a spray pattern shall be immediately available for use. The tank, pump and at least 250 feet of hose and nozzle shall be connected and ready for use at all times.

If a trailer is used, it shall be equipped with a hitch to facilitate prompt movement. A serviceable tow vehicle shall be immediately available for attachment to the trailer and must meet the time requirements stated above. Such truck or trailer shall be equipped to operate for a minimum of 8 hours. Tank truck or trailer shall be available from the start of work to the end of the Fire Watch / Fire Security service.

Other files for this federal contract opportunity

Other files attached to Lower Marco Creek Bridge Construction, newest first.
File Type Posted
Lower_Marco_Plan_Set_(5-11-2016).pdf PDF
UPDATED_Schedule_of_Items.pdf PDF
Amendment__0001_AG-046W-S-16-0020.pdf PDF
Experience_Questionaire.docx DOCX document
Attachment_1_and_2_Lower_Marco_Creek_Specifications.pdf PDF
Attachment_7_r6-fs-6300-54.rtf RTF text file
Attachment_5_r6-fs-6300-52.rtf RTF text file
Solicitation_AG-046W-S-16-0020_Lower_Marco_Creek_Bridge.pdf PDF
Attachment_3_Lower_Marco_Plan_Set_(4-15-16).pdf PDF
Attachment_4_Wage_Determination_OR1.txt TXT text file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .