S150049Attachments.pdf

PDF 2 MB Posted

Attached to
Silver Mule BMP Road Reconstruction
Solicitation number
AG-03R6-S-15-0049
Issued by

About this file

Silver Mule BMP Road Reconstruction Attachments

View the file

Other files

File Type Posted
S150049-1CompleteSolicitation.pdf PDF
Silver_Mule_Bmp's_signed_Drawings.msg MSG file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-03R6-S-15-0049

Silver Mule BMP Road Reconstruction/Flathead NF

Attachments, Page 1 of 86

ATTACHMENTS

Davis-Bacon Act: If this is a contract in excess of $2,000, the Davis Bacon Act requires the Contractor to pay certain minimum wages and benefits to employees working under this contract. These required minimum wages are stated in the attached Wage Decision.

The following attachments are a part of this solicitation and any resulting contract.

J- 1 Wage Rate Decision No. MT150080, dated 01/09/2015, 11 pages.

J-2 Standard Specifications (55 pages)

The following Standard Specifications are physically included in this solicitation:

Section 101 Abbrevations, Acronyms, & Terms 4 pages

Section 102 Definitions 6 pages

Section 103 Intent of Contract 1 page

Section 104 Maintenance for Traffic 2 page

Section 105 Control of Materials 2 pages

Section 106 Measurement & Payment 4 pages

Section 161 Certification for Quality & Quantity 1 page

Section 201 Clearing & Grubbing 2 pages

Section 202 Removal of Structures & Obstructions 1 page

Section 203 Excavation, Embankment, & Haul 7 pages

Section 204 Soil erosion & Water Pollution Control 2 pages

Section 206A Structural Excavation for Minor Structures 2 pages

Section 251 Riprap 1 page

Section 304 Aggregate Base or Surface Course 2 pages

Section 306 Reconditioning Existing Road 2 pages

Section 601 Mobilization 1 page

Section 603 Metal Pipe 3 pages

Section 611 Development of Pits & Quarries 1 pages

Section 625 Seeding & Mulching 3 pages

Section 637 Equipment Rental 2 pages

Section 640 Road Closure Devices 2 pages

Section 707 Metal Pipe 1 page

Section 713 Roadside Improvement Material 2 pages

Attachments, Page 2 of 86

J-3 Drawings (30 pages – attached in a seperate document)

The following drawings are a part of this solicitation and any resulting contract:

* Title Sheet & Vicinity Map Sheet 1

* Project Area Map Sheet 2

* Summary of Estimated Quantities Sheet 3

* Culvert List/Outlet Ditch/Drain Dip Typ.s Sheet 4

* General Notes/Culvert Installation/Sediment Basin Typ.s Sheet 5

* Brushing/Reconditioning/CB/DB Typ.s Sheet 6

* Rd. #38 Reconstruction Road Logs Sheets 7 - 14

* Rd. #2836 & #2551D Reconstruction Road Log Sheet 15

* Rd. #2851 Reconstruction Road Log Sheets 16 -18

* Rd. #5359 Reconstruction Road Log Sheets 19 - 20

* Rd. #9856 & #10102 Reconstruction Road Logs Sheets 21 - 26

* Rd. #10101 & #11434 Reconstruction Road Log Sheet 27

* Rd. #10119 Reconstruction Road Log Sheet 28

* Standard Farm Gate Sheets 29

* RD. #10120 Culvert Replacement and Typical Sheets 30

J- 4 Exhibits

Food Storage Special Order LC_10_D1_01, 7 pages

General Decision Number: MT150080 01/09/2015 MT80

Superseded General Decision Number: MT20140080

State: Montana

Construction Type: Highway

Counties: Montana Statewide.

HIGHWAY CONSTRUCTION PROJECTS

Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the

EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The

EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/02/2015

1 01/09/2015

* SUMT2014-001 02/19/2014

Rates Fringes

CARPENTER

Carpenter/Piledriverman.....$ 25.21 10.82

Millwright..................$ 27.78 10.82

Zone 1: 0 to 25 miles - Free

Zone 2: 25 to 50 miles - Base Pay +$3.00

Zone 3: Over 50 miles - Base Pay +$4.80

The Carpenter zone hourly rate applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the County Courthouse of the following cities to the center of the job:

Billings, Bozeman, Butte, Great Falls, Helena, Missoula, Kalispell

The agency shall calculate the mileage and include it in the

Attachments, Page 4 of 86 special provisions of the bid documents and awarded contract

CEMENT MASON/CONCRETE FINISHER...$ 23.87 9.80

Zone 1: 0 to 25 miles - Free

Zone 2: 25 to 50 miles - Base + $2.50

Zone 3: Over 50 miles -Base + $3.00

The Cement Mason/Concrete Finisher zone hourly rate applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the

County Courthouse of the following cities to the center of the job:

Billings, Bozeman, Butte, Great Falls, Helena, Missoula, Kalispell

ELECTRICIAN (LINE

CONSTRUCTION)

Equipment Operator..........$ 30.12 12.71

Groundman...................$ 24.30 11.99

Lineman.....................$ 40.63 13.78

TRAVEL PAY:

$30.00 day - From the County Courthouse of the following cities: Billings, Bozeman, Butte, Great Falls, Helena, Kalispell and Missoula

$60.00 day - All other areas

ELECTRICIAN

Area 1

Beaverhead, Deer Lodge, Granite, Jefferson, Madison, Silver Bow and

Powell Counties............$ 27.60 12.98

Area 2

Attachments, Page 5 of 86

Big Horn, Carbon, Carter, Custer, Dawson, Fallon, Garfield, Golden Valley, Musselshell, Powder

River, Prairie, Rosebud, Stillwater, Treasure, Wibaux and Yellowstone

Counties...................$ 30.73 12.54

Area 3

Blaine, Cascade, Chouteau, Daniels, Fergus, Glacier, Hill, Judith Basin, Liberty, McCone, Petroleum, Pondera, Phillips, Richland, Roosevelt, Sheridan, Teton, Toole, Valley and Wheatland

Counties...................$ 30.73 12.54

Area 4

Broadwater, Lewis and

Clark and Meagher Counties.$ 29.06 11.36

Area 5

Flathead, Lake, Lincoln, Mineral, Missoula, Ravalli and Sanders

Counties...................$ 27.02 12.59

Area 6

Gallatin, Park and Sweet

Grass Counties.............$ 27.68 11.84

0 to 10 miles - Free

10-50 miles - Federal mileage both ways/day

Over 50 miles - $75.00 per day

The Electrician zone hourly rate applicable to each project

Billings, Bozeman, Butte, Great Falls, Kalispell, Missoula

Attachments, Page 6 of 86

IRONWORKER

Flathead, Glacier, Lake, Lincoln, Mineral, Missoula, Ravalli and

Sanders County..............$ 25.90 19.98

Remaining Counties..........$ 26.00 19.08

0 to 45 miles - Free

45-85 miles - $45.00 per day

Over 85 miles - $75.00 per day

The Ironworker zone hourly rate applicable to each project

Billings, Bozeman, Butte, Great Falls, Helena, Kalispell, Missoula

LABORER

Group 1.....................$ 18.90 8.05

Group 2.....................$ 21.97 8.05

Group 3.....................$ 22.19 8.05

Group 4.....................$ 23.18 8.05

GROUP 1: Flag Person

GROUP 2: All General Labor work; Burning Bar; Bucket Man;

Carpenter Tender; Caisson Worker; Cement Mason Tender; Cement

Handler (dry); Chuck Tender; Choker Setter; Concrete Worker;

Curb Machine-Lay Down; Crusher and Batch Plant Worker; Fence

Erector; Form Setter; Form Stripper; Heater Tender;

Landscaper; Pipe Wrapper; Pot Tender; Powderman Tender; Rail and Truck Loaders and Unloaders; Riprapper; Sealants for

Concrete and other materials; Sign Erection, Guard Rail and

Jersey Rail;

Stake Jumper; Spike Driver; Signalman; Tail Hoseman; Tool

Checker and Houseman; Traffic Control Worker

Attachments, Page 7 of 86

GROUP 3: Concrete Vibrator; Dumpman (Grademan); Equipment

Handler; Geotextile and Liners; High-Pressure Nozzleman;

Jackhammer (Pavement Breaker); Laser

Equipment; Non-riding Rollers; Pipelayer; Posthole Digger

(power); Power Driven Wheelbarrow; Rigger; Sandblaster; Sod-

Cutter-power; Tampers

GROUP 4: Asphalt Raker; Cutting Torch; Grade Setter; High-

Scaler; Power Saws (Faller & Concrete); Powderman ($1.00 per hour above Group 4 rate); Rock & Core Drill; Track or Truck

Mounted Wagon Drill; Welder including Air Arc

LABORERS ZONE PAY:

The hourly wage rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the County Court House of the following cities only to the center of the job:

BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL,

MISSOULA

ZONE 1: 0 to 25 miles - Free

ZONE 2: 25 to 50 miles - Base Pay +$2.50

ZONE 3: Over 50 miles - Base Pay +$3.00

PAINTER (Pavement

Marking/Milling and related work. Includes operating marking and all other equipment and all work involved in application of pavement markings including

Attachments, Page 8 of 86 epoxies, paints, tape, buttons, thermo-plastics and any other products applied for traffic marking purposes and for directing and regulating traffic and cutting rumble strips)...........$ 27.00 9.30

POWER EQUIPMENT OPERATOR:

Group 1.....................$ 24.02 9.90

Group 2.....................$ 26.05 9.90

Group 3.....................$ 26.91 9.90

Group 4.....................$ 27.60 9.90

Group 5.....................$ 28.94 9.90

Group 6.....................$ 29.63 9.90

Group 7.....................$ 31.73 9.90

GROUP 1: Air Compressor; Auto Fine Graders; Belt Finishing

Machine; Boring Machine (small); Cement Silo; Crane, A-Frame

Truck Crane; Crusher Conveyor; DW-10, 15, and 20 Tractor

Roller; Farm Tractor; Forklift; Form Grader; Front End Loader

Under 1 CU Yard; Heavy Duty Drills; Herman Nelson Heater;

Mulching Machine; Oiler, All Except Cranes & Shovels; Pumpman

GROUP 2: Air Doctor; Backhoe/Excavator/Shovel to and including 3 CU Yard; Bit Grinder; Bituminous Paving Travel

Plant; Boring Machine Large; Broom, Self-Propelled; Concrete

Travel Batcher; Concrete Float & Spreader; Concrete Bucket

Dispatcher;

Concrete Finish Machine; Concrete Conveyor; Distributor;

Dozer; Rubber-Tired, Push & Side Boom; Elevating

Grader/Gradall; Field Equipment Serviceman; Front End Loader 1

CU Yard to including 5 CU Yard; Grade Setter; Heavy Duty

Drills, All Types;

Hoist/Tugger, All; Hydralift & Similar; Industrial Locomotive;

Motor Patrol, Except Finish; Mountain Skidder; Oiler - Cranes

& Shovels; Pavement Breaker, EMSCO; Power Saw, Self-Propelled;

Pugmill; Pumpcrete/Grout Machine; Punch Truck; Roller, Other

Than Asphalt; Roller, Sheepsfoot, Self-Propelled; Roller, 25

Tons and Over; Ross Carrier; Rotomill Under 6 Ft; Trenching

Machine; Washing/Screening Plant

GROUP 3: Asphalt Paving Machine; Asphalt Screed;

Backhoe/Excavator/Shovel Over 3 CU Yard; Cableway Highline;

Concrete Batch Plant; Concrete Curing Machine; Concrete Pump;

Attachments, Page 9 of 86

Cranes; Creter; Cranes, Electric Overhead; Cranes 24 Tons and

Under; Curb Machine/Slip Form Paver; Finish Dozer; Front End

Loader Over 5 CU Yard; Mechanic/Welder; Pioneer Dozer; Roller

Asphalt (Breakdown & Finish); Rotomill, Over 6 FT; Scraper, Single, Twin or Pulling Belly Dump; Yo-Yo Cat

GROUP 4: Asphalt/Hot Plant Operator, Cranes, 25 Tons to 44

Tons; Crusher Operator; Finish Motor Patrol; Finish Scraper

GROUP 5: Cranes, 45 Tons To Including 74 Tons

GROUP 6: Cranes, 75 Tons To Including 149 Tons; Crane, Whirley (All)

GROUP 7: Cranes, 150 Tons To Including 250 Tons (Add $ 1.00

For Every 100 Tons Over 250 Tons; Crane, Tower (All)

POWER EQUIPMENT OPERATOR ZONE PAY:

Attachments, Page 10 of 86

TRUCK DRIVER

Group 1.....................$ 20.39 9.16

Group 2.....................$ 26.06 9.16

GROUP 1: Pilot Car

GROUP 2: Combination Truck and Concrete Mixer and Transit

Mixer; Dry Batch Trucks; Distributor Driver; Dumpman; Dump

Trucks and Similar Equipment; Dumpster; Flat Trucks; Lumber

Carriers; Lowboys; Pickup; Powder Truck Driver; Power Boom;

Serviceman; Service Truck/Fuel Truck/ Tireperson; Truck

Mechanic; Trucks With Power Equipment; Warehouseman, Partsman, Cardex and Warehouse Expeditor; Water Trucks

TRUCK DRIVER ZONE PAY:

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

Attachments, Page 11 of 86

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Attachments, Page 12 of 86

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Attachments, Page 13 of 86

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Attachments, Page 14 of 86

FOREST SERVICE

SPECIFICATIONS

For

SILVER MULE BMPS AND ROAD

RECONSTRUCTION

March 2015

Attachments, Page 15 of 86

Silver Mule Project Specifications for Construction of Roads

Table of Contents

Section 101—Abbreviations, Acronyms, & Terms

Section 102—Definitions

Section 103—Intent of Contract

Section 104—Maintenance for Traffic

Section 105—Control of Materials

Section 106—Measurement & Payment

Section 161—Certification for Quality & Quantity

Section 201— Brushing, Clearing and Grubbing of Existing Roads

Section 202—Removal of Structures & Obstructions

Section 203—Excavation, Embankment, & Haul

Section 204—Soil Erosion & Water Pollution Control

Section 206A—Structural Excavation for Minor Structures

Section 251—Riprap

Section 304—Aggregate Base or Surface Course

Section 306—Reconditioning Existing Road

Section 601—Mobilization

Section 603—Metal Pipe

Section 611—Development of Pits & Quarries

Attachments, Page 16 of 86

Section 625—Seeding & Mulching

Section 637—Equipment Rental

Section 640—Road Closure Devices

Section 705—Rock

Section 707—Metal Pipe

Section 713—Roadside Improvement Material

(March 2015)

Attachments, Page 17 of 86

Section 101—Abbreviations, Acronyms, & Terms

101.01 Terms, Organizations, & Standards

These specifications are generally written in the imperative mood. In sentences using the imperative mood, the subject, “the Contractor,” is implied. Also implied in this language is “shall,” “shall be,” or similar words and phrases. In material specifications, the subject may also be the supplier, fabricator, or manufacturer supplying material, products, or equipment for use on the project.

Wherever “directed,” “required,” “prescribed,” or similar words are used, the “direction,” “requirement,” or “order” of the Contracting Officer (CO) is intended. Similarly, wherever “approved,” “acceptable,” “suitable,” “satisfactory,” or similar words are used, they mean “approved by,” “acceptable to,” or “satisfactory to” the CO.

The word “will” generally pertains to decisions or actions of the CO.

Whenever in these specifications, or in other contract documents, the following terms (or pronouns in place of them) are used, the intent and meaning shall be interpreted as follows: reference to a specific standard, test, testing method, or specification shall mean the latest published edition or amendment that is in effect at the solicitation issue date for Public Works Contracts or the sale advertisement date for Timber Sale Contracts.

These specifications are divided into the following divisions:

1. Division 100 consists of general specifications for which no direct payment is made. These requirements are applicable to all contracts.

2. Division 150 consists of engineering requirements that are applicable to some contracts. Work under this division is paid for directly when there is a PAY ITEM IN THE SCHEDULE OF ITEMS.

When there is no PAY ITEM IN THE SCHEDULE OF ITEMS, no direct payment is made.

3. Divisions 200–600 consist of construction contract requirements for specific items of work.

Work under these divisions is paid for directly or indirectly according to Section 106 and the section for ordering the work when there is a PAY ITEM IN THE SCHEDULE OF ITEMS.

4. Division 700 contains the material requirements for Divisions 200–600. No direct payment is made under Division 700. Payment for material is included as part of the work required in

Divisions 200–600.

(a) Acronyms. The following acronyms are used in these specifications:

AA Aluminum Association

AASHTO American Association of State Highway and Transportation Officials

ACI American Concrete Institute

ADA Americans With Disabilities Act

AGC Associated General Contractors of America

AI Asphalt Institute

AISC American Institute of Steel Construction

Attachments, Page 18 of 86

AITC American Institute of Timber Construction

ALSC American Lumber Standards Committee

ANSI American National Standards Institute

APA American Plywood Association

ARTBA American Road and Transportation Builders Association

ASTM American Society for Testing and Material

AWPA American Wood Preservers Association

AWS American Welding Society

AWWA American Water Works Association

CFR Code of Federal Regulations

CRSI Concrete Reinforcing Steel Institute

DEMA Diesel Engine Manufacturers Association

DOT U.S. Department of Transportation

FAR Federal Acquisition Regulation

FHWA Federal Highway Administration

FLH Federal Lands Highway (Federal Highway Administration)

FSS Federal Specifications and Standards

ISSA International Slurry Surfacing Association

MIL Military Specification(s)

MSHA Mine Safety and Health Administration

MUTCD Manual on Uniform Traffic Control Devices

NBS National Bureau of Standards

OSHA Occupational Safety and Health Administration

PCI Prestressed Concrete Institute

PTI Post-Tensioning Institute

SI International System of Units

SSPC Steel Structures Painting Council

WWPI Western Wood Preservation Institute

(b) System of International Units (SI) Symbols.

(c) SI Prefix Symbols.

(d) Slope Notation (horizontal : vertical). Express the slope as the ratio of a number of units horizontal to one unit vertical.

101.02 Abbreviations & Symbols

ABS Acrylonitrile-butadiene-styrene

ACA Ammoniacal copper arsenate

ACZA Ammoniacal copper zinc arsenate

Agg Aggregate

Al Aluminum

AOS Apparent opening size

AQ Actual quantities

Attachments, Page 19 of 86

AQL Acceptable Quality Level

BMP Best Management Practice

CAPWAP Case pile wave analysis program

CCA Chromated copper arsenate

CMP Corrugated metal pipe

CMPA Corrugated metal pipe arch

CO Contracting Officer

CPF Composite pay factor

CSP Corrugated steel pipe

CSPA Corrugated steel pipe arch

CTB Cement-treated base

CY Cubic Yard

Cubic CY MI Cubic Yard Mile

DAR Durability Absorption Ratio

Dia Diameter

DQ Designed quantities

DTI Direct tension indicator

Dwgs Drawings

EA Each

FM Fineness modulus

Ft Foot

GAL Gallon

GFM Government-furnished materials

Gr Grade

Ht Height ha Hectare

HDO High-density overlay

HDPE High-density polyethylene hr Hour

Hor Horizontal

HSLA High-strength low-alloy

In Inch kg Kilogram kL Kiloliter kL km Kiloliter kilometer km Kilometer

L Length l Liter

Lbs pounds

LF Linear Foot

Attachments, Page 20 of 86

LS Lump Sum

LSL Lower specification limit m Meter m2 Square meter m3 Cubic meter m3 km Cubic meter kilometer

Matl Material max. Maximum

Mbf Thousand board feet

Mi Mile

MFBM One thousand feet board measure

M Gals One thousand gallons

M Gals Mi One thousand gallons mile min. Minimum

Misc Miscellaneous mm Millimeter

MSF One thousand square feet

N/C Numerically controlled

PG Performance-graded

PI Plasticity index ppm Parts per million

PS Product Standard (issued by the U.S. Department of Commerce)

PVC Polyvinylchloride

Sec Section

SF Square Feet

SQ Staked quantities

STA Station

STA YD Station Yard

SY Square Yard t Ton (1,000 kg) t km Ton kilometer

T Temperature

T&L Tops and limbs

TFE Tetraflouroethylene

Th Thickness

TM Ton mile

TV Target value

USL Upper specification limit

Vert Vertical

VMA Voids in Mineral Aggregate

Attachments, Page 21 of 86

VOC Volatile organic compound

Yd Yard

W Width

W/ With

W/O Without

WW Woven wire

WWF Welded wire fabric

" Inches

' Feet

Attachments, Page 22 of 86

Section 102—Definitions

Wherever the following terms, or pronouns in place of them, are used in these specifications or in other contract documents, the intent and meaning are as follows:

Adjustment in Contract Price. “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Arch. A culvert section, usually formed of bolted structural plates, that is an arc of a circle (usually one-half or less); that is, a bottomless culvert.

Base Course. The layer or layers of specified or selected material of designed thickness placed on a subbase or subgrade to support a surface course. (See figure 102-1.)

Bearings. The portion of a beam, girder, or truss that transmits the bridge superstructure load to the substructure.

Berm. Curb or dike constructed to control roadway runoff water. (See figure 102-1.)

Best Management Practice. A series of water quality protection practices and procedures approved or certified by the State water quality agency under the provisions of sections 319 and 402 of the Clean Water Act, as amended.

Bridge. A structure, including supports, erected over a depression or an obstruction, such as water, a road, a trail, or a railway, and having a floor for carrying traffic or other moving loads.

Bridge Length. The overall length measured along the centerline of road to the back of abutment backwalls, if present; otherwise, end to end of the bridge floor, but in no case less than the total clear opening of the structure.

Bridge Traveled Way Width. The clear width measured at right angles to the longitudinal centerline of the bridge between the bottom of curbs or, if curbs are not used, between the inner faces of parapet or railing.

Certificate of Compliance. A signed statement by a person with legal authority to bind a company or supplier to its product. The certificate states that the material or assemblies furnished fully comply with the requirements of the contract.

Change. “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Clearing Limits. The limits of clearing as designated on the ground or on the drawings. (See figure 102-1.)

Cofferdam. A cofferdam is an enclosed single or double wall braced structure with walls sheeted with timber, concrete, or steel, and extending well below the bottom of excavation, when practical. Earthen or rockfill dikes, dams, or embankments are not considered cribs or cofferdams for this purpose.

Attachments, Page 23 of 86

Conduit. A natural or artificial channel for carrying fluids, such as water pipe, canal, or aqueduct.

Construction Slash. All vegetative material not meeting Utilization Standards, such as tops and limbs, timber, brush, and grubbed stumps associated with construction or reconstruction of a facility.

Contracting Officer (CO). The person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the CO acting within the limits of their authority as delegated by the CO. Authorized representatives include the Forest Service Representative, Engineering Representative, Contracting Officer’s Representative, and Inspector.

Contractor. The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract and acting directly or through agents, employees, or subcontractors. As used in specifications and drawings for specified roads (Timber Sale Contracts), “Contractor” is “purchaser.”

Controlled Felling. Directing the placement of trees in felling by using wedges, jacks, cable tension, or distribution of holding wood, or any combinations of these, to ensure that trees are dropped into previously cleared areas, or clear of any objects that are to remain.

Culvert. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually constructed entirely below the elevation of the traveled way.

Curve Widening. Additional width added to curves to allow for vehicle offtracking.

Cushion Material. Native or imported material generally placed over rocky sections of unsurfaced roads to provide a usable and maintainable traveled way.

Defect. A failure to meet a requirement with respect to a single quality characteristic.

Drawings. The documents, including plan and profile sheets, plans, cross sections, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials showing details for construction of a facility.

Embankment. A structure of soil, aggregate, or rock material placed on the prepared ground surface and constructed to subgrade.

Equipment. All machinery and equipment, together with the necessary supplies for upkeep and maintenance, as well as tools and apparatus necessary for the proper construction and acceptable completion of the work.

Excess Excavation. Material from the roadway in excess of that needed for construction of designed roadways.

Falsework. Any temporary construction work used to support the permanent structure until it becomes self-supporting. Falsework includes steel or timber beams, girders, columns, piles, foundations, and any proprietary equipment including modular shoring frames, post shores, and adjustable horizontal shoring.

Forest Service. The United States of America, acting through the Forest Service, U.S. Department of

Agriculture.

Attachments, Page 24 of 86

Government Land. National Forest System lands, and other lands controlled or administered by the Forest Service or other Federal agencies.

Inspector. The Government-authorized representative designated in writing by the Contracting Officer, Contracting Officer’s Representative, or Engineering Representative responsible for detailed inspection.

Invert. The lowest point of the internal cross section of culvert or pipe arch.

Job-Mix Formula. The percentage of each material in a mixture intended for a particular use.

Laboratory. A testing laboratory of the Government, or any other testing laboratory approved by the Contracting Officer.

Live Stream. A defined streambed with flowing water.

Lot. An isolated quantity of material from a single source; a measured amount of construction assumed to be produced by the same process.

Materials. Any substance specified for use in the construction of the project and its appurtenances.

Maximum Density. The highest density that can be obtained for a specific material using the stated test procedure.

Measurement. Determining and expressing the quantities of work or materials.

Multibeam Girder. A precast, prestressed concrete member where the concrete deck is precast as an integral part of the member.

Neat Line. A line defining the proposed or specified limits of an excavation or structure.

Nominal Dimensions or Weights. The numerical values shown on the drawings or in the specifications as measurements of material to be used in the construction.

Nominal Maximum Particle Size. The largest sieve size listed in the applicable specification upon which any material is permitted to be retained.

Overbreak. Material beyond the neat line of an excavation that is removed in the process of excavation, usually by blasting.

Pass. A pass shall consist of one complete coverage of the surface.

Pavement Structure. Subbase, base, or surface course, or combination thereof, placed on a subgrade to support the traffic load and distribute it to the roadbed.

Pioneer Road. Temporary construction access built along the route of the project.

Pipe. A culvert that is circular (round) in cross section.

Pipe Arch. A pipe that has been factory-deformed from a circular shape such that the width (or span) is larger than the vertical dimension (or rise).

Profile Grade. The trace of a vertical plane, as shown on the drawings, intersecting the top surface at the centerline of the proposed facility construction.

Attachments, Page 25 of 86

Project Specifications. The specifications that detail the conditions and requirements specific to the individual project, including additions and revisions to Standard Specifications.

Purchaser. The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Random Sampling. A sample of material chosen such that each increment of a population of material has an equal probability of being selected.

Reasonably Close Conformity. Compliance with reasonable and customary manufacturing and construction tolerances, performing all work and furnishing all materials in “reasonably close conformity” with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground.

Right-of-Way. A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) land, appurtenances thereto, or interest therein, usually in a strip, acquired for public or private passageway. (See figure 102-1.)

Road Order. An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Road Template. The shape and cross-sectional dimensions of the roadway to be constructed, as defined by the construction staking notes and the characteristics of the typical sections.

Roadbed. The graded portion of a road between the intersection of subgrade and side slopes, excluding that portion of the ditch below subgrade. (See figure 102-1.)

Roadside. A general term denoting the area adjoining the outer edge of the roadway. (See figure 102-1.)

Roadway. The portion of the road within the limits of excavation and embankment, including slope rounding. (See figure 102-1.)

Schedule of Items. A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.

Second Samples. A sample taken when the initial sample indicates that the material is defective.

Shoulder. The portion of the roadway contiguous to the traveled way for accommodation of stopped vehicles, emergency use, and lateral support of pavement structure. (See figure 102-1.)

Sidewalk. The portion of the roadway constructed primarily for pedestrian use.

Specifications. A description of the technical requirements for a material, product, or service that includes criteria for determining whether these requirements are met.

Spring Line. The point of contact between arch and footing.

Standard Specifications. Specifications approved for general application and repetitive use.

Attachments, Page 26 of 86

Station. (1) A measure of distance used for highways and railroads equal to 1 feet. (2) A precise location along a survey line.

Subbase. The layers of specified or selected material of designed thickness placed on a subgrade to support a base course.

Subgrade Treatment. Modification of roadbed material by stabilization.

Subgrade. The prepared surface, including widening for curves, turnouts, and other areas upon which a subbase, base, or surface course is constructed. For roads without base course or surface course, that portion of roadbed prepared as the finished wearing surface. (See figure 102-1.)

Substructure (Bridge). All of that part of the structure below the bearings of simple and continuous spans, skewbacks of arches, and tops of footings of rigid frames, together with the backwalls, wingwalls, and wing protection railings.

Superstructure (Bridge). The entire structure, except the substructure.

Surface Course. The top layer of a pavement structure, sometimes called the wearing course, usually designed to resist skidding, traffic abrasion, and the disintegrating effects of climate. (See figure 102- 1.)

Tackifier. Binder for vegetative mulch.

Target Value. Values that are established according to contract, and from which allowable variations are measured.

Timber Sale Contract. A written contract for the removal of national forest timber.

Tops and Limbs. All woody material including bushes, vines, and portions of trees smaller than the dimensions for timber shown in Subsection 201.03.

Traveled Way. The portion of the roadway for the movement of vehicles, exclusive of shoulders and auxiliary lanes. (See figure 102-1.)

Turnout. A short auxiliary lane on a one-lane road provided for the passage of meeting vehicles.

Unit of Measurement. The unit and fractions of units DESIGNATED IN THE SCHEDULE OF ITEMS.

Unsuitable Material. The material excavated during roadway construction that is not usable in embankment and must be disposed of, or that can be used only in certain locations or for limited purposes.

Utilization Standards. The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Attachments, Page 27 of 86

Figure 102-1.—Illustration of road structure terms.

Attachments, Page 28 of 86

Section 103—Intent of Contract

The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, furnish all labor, materials, equipment, tools, transportation, and supplies, and perform all work required to complete the project in reasonably close conformity with drawings and specifications, and in accordance with provisions of the contract.

Attachments, Page 29 of 86

Section 104—Maintenance for Traffic

104.01 Roads To Be Constructed

Unless otherwise SHOWN ON THE DRAWINGS or described in the PROJECT SPECIFICATIONS, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic.

Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a plan for the satisfactory handling of traffic has been approved.

Plan Requirements

Item 1) Road 38 MP 51.592 Culvert replacement work shall be completed by August 1, 2015.

Contractor shall notify the District Office at least 14 days prior to replacing this culvert and can close the road to traffic no more than 6 hours without further notice.

Item 2) Road 2851 work shall be completed by August 1, 2015. If traffic must be detained more than 30 min. notify the District 48 hrs. in advance.

Item 3) Road 9856/10102 is open seasonally to MP 1.67 from June 1st through Labor Day. Any construction outside of this time frame must be documented for our Administrative Access Log.

Contractor shall notify District one week before construction on this road. If it is determined that traffic may need to be detained for short periods of time Contractor shall notify the District 48 hours in advance. Stock hauling schedules for the FS can be shared to minimize conflict to Contractor and FS Packers/Stock. On scheduled days the District requests the Contractor to not delay stock trucks.

Item 4) For all other roads in this contract the information below applies.

Specific requirements for temporary closures, detours, part-width construction, and access to adjacent or intersecting facilities will be SHOWN ON THE DRAWINGS or described in the PROJECT SPECIFICATIONS. Post construction signs and traffic control devices in conformance with the “Manual on Uniform Traffic Control Devices” (MUTCD). Do not proceed with work on the project until all required signs are in place and approved.

Before shutting down any operations, take all necessary precautions to prevent damage to the project, such as temporary detours, approaches, crossings, or intersections; and provide for normal drainage and minimization of erosion. Leave all travelways in a condition suitable for traffic.

The Government may permit use of portions of the project during periods when operations have shut down All maintenance attributable to permitted use during periods of work suspension will be provided by the Government, except for maintenance needed through the fault or negligence of the Contractor. The Contractor shall be responsible for any maintenance not attributable to use, or that is necessary during suspensions through the fault or negligence of the Contractor.

Attachments, Page 30 of 86

When SHOWN ON THE DRAWINGS or described in the PROJECT SPECIFICATIONS, road segments may be closed to all traffic during the period(s) when construction is in progress. If any of the listed roads are to be closed during construction operations, give at least 14 days advance notice.

Unless otherwise provided, when construction activity is in progress and total closure has not been provided for herein, delays may not exceed 30 minutes, in order to reasonably accommodate traffic.

104.02 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations SHOWN ON THE

DRAWINGS, designated in the Road Order, or described in the PROJECT SPECIFICATIONS, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

Attachments, Page 31 of 86

Section 105—Control of Materials

105.01 Handling Materials

Transport and handle all materials to preserve their quality and fitness for the work. Stockpile, load, and transport aggregates in a manner that will preserve specified gradation and avoid contamination.

Do not intermingle stockpiles of aggregate with different gradations. Stockpile crushed or screened aggregate in accordance with Section 305.

105.02 Weighing Devices

105.03 Sampling & Testing of Aggregate

105.04 Certification & Sampling of Asphalt Materials

105.05 Rights in & Use of Materials Found or Produced on the Work

(a) With the written approval of the CO, suitable stone, gravel, sand, or other material found in the excavation can be used on the project. Payment will be made both for the excavation of such materials at the corresponding contract unit price and for the pay items for which the excavated material is used.

Replace, without additional compensation, sufficient suitable materials to complete the portion of the work that was originally contemplated to be constructed with such material.

(b) Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

105.06 Material Sources

(a) Designated Sources. Sources of local materials designated in the PROJECT SPECIFICATIONS or SHOWN ON THE DRAWINGS are guaranteed by the Government for the quality and quantity of material in the source. Determine the equipment and work required to produce the specified product. Utilize all suitable material in the source. The designation of a source includes the Contractor’s right to use areas

SHOWN ON THE DRAWINGS for the purposes designated (that is, plant sites, stockpiles, and haul roads).

Unless otherwise indicated or approved, no additional operating area shall be allowed. In this case, operate only in the confines of the area(s) designated.

The weight/volume relationship used for determining designed quantities (DQ) of material in designated sources subject to weight measurement is SHOWN ON THE DRAWINGS.

Should the designated source contain insufficient suitable material due to causes beyond the Contractor’s control, the Government will provide another source, with an adjustment in contract price, in accordance with applicable contract provisions.

Attachments, Page 32 of 86

Designated sources will be available for the Contractor’s use during the periods SHOWN ON THE DRAWINGS. Use at any other time will require an agreement with the party scheduled for that period, with the CO’s approval.

(b) Contractor-Furnished Sources. When the material sources are not designated as provided above, or when designated sources are not used, furnish material that produces an end product equivalent in performance to that originally designated. An adjustment in contract price shall be made where the weight/ volume relationship differences between designated source material and Contractor-furnished source material result in a financial disadvantage to the Government. When SHOWN ON THE DRAWINGS, complete any pit development specified for a designated source, even when material is not obtained from the source.

Test for quality in conformance with applicable requirements, to establish the equivalency of the end product. Furnish test results and a Certificate of Compliance.

Attachments, Page 33 of 86

Section 106—Measurement & Payment

106.01 Measurement & Payment

Compensation provided for in the contract is full payment for performing all contract work in a complete and acceptable manner. All risk, loss, damage, or expense arising out of the nature or prosecution of the work is included in the compensation provided by the contract.

Work required by the contract will not be paid for directly unless a PAY ITEM for the work is

DESIGNATED IN THE SCHEDULE OF ITEMS.

Work referenced for measurement under another section will not be paid for directly unless a PAY ITEM for the work is DESIGNATED IN THE SCHEDULE OF ITEMS for the referenced section.

Work not paid for directly is considered to be included under the other contract PAY ITEMS.

Unless otherwise shown, work measured and paid for under one PAY ITEM will not be paid for under any other PAY ITEM.

The quantity to be paid for is the quantity DESIGNATED IN THE SCHEDULE OF ITEMS. No payment will be made for work performed in excess of that staked, ordered, or otherwise authorized.

When more than one class, size, or thickness is specified in the SCHEDULE OF ITEMS for any PAY ITEM, suffixes will be added to the item number to differentiate between the items.

All costs associated with the cleaning of construction equipment shall be considered subsidiary to other items in this contract and the Contractor will not be paid an additional amount for this work.

106.02 Determination of Quantities

The following measurements and calculations are used to determine contract quantities.

For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified.

Measurements for seeding, mulching, geotextiles, netting, erosion control blankets, and sodding shall be along slope lines.

The average end area method shall be used to compute volumes of excavation or embankment.

However, if in the judgment of the CO the average end area method is impractical, measurement shall be made by volume in hauling vehicles, or by other three-dimensional methods.

Structures shall be measured according to neat lines SHOWN ON THE DRAWINGS, or as altered by the CO in writing to fit field conditions.

For items that have linear measurements, such as pipe culverts, fencing, guardrails, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.

Pipe and pipe arch culverts shall be measured along center of invert, and arches shall be measured at spring line.

Attachments, Page 34 of 86

For aggregates weighed for payment, the tonnage weight shall not be adjusted for moisture content, unless otherwise provided in PROJECT SPECIFICATIONS.

For standard manufactured items—such as fence, wire, plates, rolled shapes, and pipe conduits— identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer’s tolerances shall be accepted.

106.03 Units of Measurement

Payment will be by units defined and determined according to measure. Unless otherwise specified, the meanings of the following terms are as follows:

(a) Cubic Yard in Place (yd ). Measure solid volumes by the average end area method as follows:

(1) Measure cross sections of the original ground and use with design or staked templates, or take other comparable measurements to determine the end areas. Do not measure work outside of the established lines or slopes.

(2) If any portion of the work is acceptable, but is not completed to the established lines and slopes, remeasure cross sections or comparable measurements of that portion of the work. Deduct any quantity outside the designated or staked limits. Use these measurements to calculate new end areas.

(3) Compute the quantity using the average end areas multiplied by the horizontal distance along a centerline or reference line between the end areas. Deduct any quantity outside the designed or staked limits.

Where it is impractical to measure material by the average end area method, other methods involving three-dimensional measurements may be used.

Measure liquid volumes in accordance with Subsection 106.03(h).

(b) Cubic Yard in the Hauling Vehicle. Measure the cubic yard volume in the hauling vehicle using three-dimensional measurements at the point of delivery. Use vehicles bearing a legible identification mark with the body shaped so the actual contents may be readily and accurately determined. Before use, mutually agree in writing upon the volume of material to be hauled by each vehicle. Vehicles carrying less than the agreed volume may be rejected or accepted at the reduced volume.

Level selected loads. If leveling reveals that the vehicle was hauling less than the approved volume, reduce the quantity of all material received since the last leveled load by the same ratio as the ratio of the current leveled load volume to the agreed volume. Payment will not be made for material in excess of the agreed volume.

Material measured in the hauling vehicle may be weighed and converted to cubic yard s for payment purposes if the conversion factors are mutually agreed to in writing.

Compute measurement using measurements of material in the hauling vehicles at the point of delivery.

Load vehicles to at least their water-level capacity.