S130049Attachments.pdf
PDF 6 MB Posted
- Attached to
- West Zone Roadsidee Brushing
- Solicitation number
- AG-03R6-S-13-0049
About this file
Attachments
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S130049CompleteSolicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-03R6-S-13-0049
Machine Roadside Clearing and Brushing/Lolo NF Attachments, Page 1 of 24
ATTACHMENTS
The following attachments are a part of this solicitation and any resulting contract.
Wage Determination No. 2005-2317, (Rev. 12), Dated 06/13/2012; 9 pages
Quality Assurance Plan, 4 pages
Exhibit A – Typical Clearing Details, 1 page
Food/Wildlife Attractant Storage Special Order F11-005-Lolo-Forest, 5 pages
Invoice Procedures for Western Montana Acquisition Zone, 4 pages
Attachments, Page 2 of 24
Wage Determination No. 2005-2317, (Rev. 12), Dated 06/13/2012
Attachments, Page 3 of 24
Attachments, Page 4 of 24
Attachments, Page 5 of 24
Attachments, Page 6 of 24
Attachments, Page 7 of 24
Attachments, Page 8 of 24
Attachments, Page 9 of 24
Attachments, Page 10 of 24
Attachments, Page 11 of 24
Quality Assurance Plan
Contractor Performance Checklist Road Brushing (West Zone)
Tasks and
Critical Subtasks
Quality Standards
Acceptable Quality Level
Method of Inspection
Penalties Incentives
Clearing and Brushing
• Brush road using the horizontal and vertical dimension shown on the Typical Drawing in the Exhibits.
• This includes all turnouts and additional lane width.
• All trees and brush 6 inches or less shall be cut and completely severed with no stumps higher than 9 inches above the ground or any obstruction such as rocks.
• Tree diameter shall be measured 12 inches above the ground.
• Trees and brush protruding into the Clearing Limits shall be trimmed as near to flush as practicable.
• Windfalls shall be cut where they enter the Clearing Limit.
• Accepted industry quality workmanship.
• The quality standards shall be met consistently.
• Visual verification.
• Random samples.
• Contractor may be required to rework, at their expense, the unacceptable section.
• Government may withhold compensation for that section.
• Contractor may receive poor performance rating.
• Contractor would receive a superior performance rating.
Attachments, Page 12 of 24
Quality Assurance Plan, (Continued)
Tasks and Critical
Subtasks
Quality Standards
Acceptable Quality Level
Method of Inspection
Penalties Incentives
Slash Disposal
• Slash shall be scattered outside the Clearing Limit without damaging trees.
• Slash shall be defined as any cut material, with the exception of windfalls.
• Trees 2 inches and larger in diameter shall be lopped and scattered.
• A length greater than 36 inches with a diameter less than 2 inches.
• A length greater than 24 inches with a diameter greater than 2 inches.
• No material shall be deposited in stream, drainage ways, and CMP inlets.
• The depth shall not be greater than 18 inches above the ground.
• All cut material shall be disposed of outside the Clearing Limits.
• Accepted industry quality workmanship.
• The quality standards shall be met consistently.
• Visual verification.
• Random samples.
• Will inspect completed sections of road within 2 working days following Contractor’s notification of completed work.
• Contractor may be required to rework, at their expense, the unacceptable portions of work.
• Contractor may receive poor performance rating.
• Contract may be terminated with repeated deficiencies.
• Contractor would receive a superior
Attachments, Page 13 of 24
Quality Assurance Plan, (Continued)
Tasks and Critical
Subtasks
Quality Standards
Acceptable Quality Level
Method of Inspection
Penalties Incentives
Traffic Control
• The Contractor shall exercise caution when operating, to prevent undue conflicts with public user of the roads.
• A “slow moving” emblem shall be attached to brush equipment.
• Work site shall be posted with warning signs.
• Shall meet the requirements of 2001 Manual of Uniform Traffic Control Devices.
• Each sign shall have two 12”x12” flags on both ends of section being worked.
• Signs shall be moved as needed and shall not precede the machinery by more than 1 mile.
• Accepted industry quality workmanship.
• Insuring for public safety.
• Visual verification if signs are in place and moved with the equipment.
• Random sample.
• Stop Work Order may be issued until signing is correct for operation.
• Contractor may receive poor performance rating.
• Contract may be terminated with repeated deficiencies.
• Contractor would receive a superior
Attachments, Page 14 of 24
Quality Assurance Plan, (Continued)
Tasks and Critical
Subtasks
Quality Standards
Acceptable Quality Level
Method of Inspection
Penalties Incentives
Existing Facilities
• Existing facilities such as signs, cattleguards, culverts, riprap, protecting culverts, etc.
• No damage. • No damage. • Visual verification.
• Random samples.
• Contractor may receive poor performance rating.
• Contract may be terminated with repeated deficiencies.
• Repair damage at Contractor’s expense.
• Contractor would receive a superior
Attachments, Page 15 of 24
Exhibit A – Typical Clearing Details
Attachments, Page 16 of 24
Food/Wildlife Attractant Storage Special Order F11-005-Lolo-Forest
Attachments, Page 17 of 24
Attachments, Page 18 of 24
Attachments, Page 19 of 24
Attachments, Page 20 of 24
Attachments, Page 21 of 24
Invoice Procedures for Western Montana Acquisition Zone
Attachments, Page 22 of 24
Attachments, Page 23 of 24
Attachments, Page 24 of 24
File details come from the government source that posted it. Updated .