01_MEF_Stew_II_Appendix_A.pdf

PDF 43 KB Posted

Attached to
RECOVERY - MEF Stewardship II Federal contract opportunity
Solicitation number
AG-03R6-S-09-0143
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

02 - Appendix A

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY - MEF Stewardship II, newest first.
File Type Posted
MEF_II_contractmap.pdf PDF
2400_17_03_3_10301_.txt TXT text file
02_MEF_Stew_II_Appendix_B.1_scaled.pdf PDF
03_MEF_Stew_II_Appendix_C.1.pdf PDF
s090143_Solicitation.pdf PDF
wage_determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. AG-03R6-S-09-0143 Bitterroot National Forest

MEF Stewardship II

APPENDIX A

INTERGRATED STEWARDSHIP CONTRACT

COMMERCIAL SERVICES

Unless otherwise agreed to in writing by the Contracting Officer, the Contractor shall treat service work with the following requirements:

1. Service Work Specifications. All Units are considered commercial timber units for the purposes of this contract and proposed treatments involving the removal of Timber requires adhearence to Appendix B.

Unit Identification. All Units are identified on the ground, boundaries are painted in orange.

Riparian areas exist within units. Those areas painted, measured and their acreages removed from treatment items.

Locked Gates. In cases where the units are behind locked gates, the Contractor shall close and lock gates after entering or existing each gate and will be subject to all other restrictions of administrative use. The Contractor shall be permitted to drive from the locked gate to the unit with only the minimum number of vehicles necessary for efficient transportation of the crew.

Treatment Specification Table. The Contractor shall provide services in compliance with the Treatment Specification Table included herein.

Treatment Specification Table

Item Number Treatment Description

0001A

Timber Delivery of Logs in Deck, Pile Landings, Scarify and Erosion Control Seeding

Timber Delivery. Contractor is subject to timber removal specifications in Appendix B.

Pile landing slash pursuant to K-G.7.

Scarify landing, temporary access roads into landings pursuant to K-G.6.3.3#, in addition, Rehabilitation of helicopter landings shall involve recontouring previously excavated and graded materials back across the landing site to re-establish natural contour.

Following recontouring, slash adjacent to the landing will be scattered across the recontoured surface to achieve approximately 50% ground cover. The slash should consist of a mix of fine woody material (needles & small branches) and course woody debris (material > 3 inches in diameter).

Erosion Control seeding and fertilizer pursuant to K-G.6.0.1#..

3 Landings: Timber Delivery of Logs in Deck, Bertie Lord Creek, Jennings Camp Creek, and Shirley Mtn.

2 Landings: Pile Landing slash: Bertie Lord Creek, Jennings Camp Creek.

1 Landing: Scarify landing and Erosion Control Seeding, Bertie Lord Creek.

0001B

Yarding and Timber Delivery of Logs felled

Yarding, Timber Delivery. Contractor is subject to timber removal specifications in Appendix B.

MEF Units 126A (approximately 60 acres).

0001C

Timber Removal Activities:

Felling, Bucking, Helicopter Yarding, and Timber Delivery

Felling, Bucking, Yarding, Timber Delivery and Road Maintenance. Contractor is subject to timber removal specifications in Appendix B.

MEF Units 3, 21, 38, 126B (approximately 35 acres), 203, 238, 47.

0001D Road Maintenance

Road Maintenance requirements in Appendix C.

MEF Stewardship II

Item Number Treatment Description

0001E

Leave Tree Protection

Cut all lodgepole pine less than 6” DBH and all other trees less than 7 within 20’ +/- 5’ of all live trees > 18” DBH. Stump heights shall be no more than 6 inches on the uphill side. Lop, Buck & Scatter activity and natural fuels 10 feet away from tree boles. Buck to lengths less than 3 feet. Lop and Scatter to less than 24” in depth (natural fuels are considered any material on the ground that is greater than 3” DBH and 3’ in length.

Cut material shall not lean against an uncut tree, stump, log, and/or obstacle. It shall be secure and not able to roll down hill.

MEF Units 203 (59 acres), 38 (101 acres), 238 (43 acres) 45 (81 acres), 47 (155 acres).

0001F

Light Slashing Slash all lodgepole pine less than 6” DBH and all other trees less than 7” DBH except ponderosa pine to a, 20’ x 20’ spacing. In all units, the spacing shall be varied by 25% to select the best leave trees based on the characteristics of desirable trees (straight stem, greater than 40% live crown, free of insect or disease, or dominant or co-dominant crown class). Stump heights will be no more than 6 inches on the uphill side. Lop, Buck & Scatter activity fuels to lengths less than 3 feet. Lop and Scatter to less than 24” in depth.

Units MEF 45 (81 acres).

0002A

Optional Timber Removal Activities:

Felling, Bucking, Helicopter Yarding, and Timber Delivery

Felling, Bucking, Yarding & Timber Delivery. Contractor is subject to timber removal specifications in Appendix B and Road Maintenance requirements in Appendix C. Units are listed in order of priority.

MEF Units 6A, 6B, 1.

0002B Optional Road Maintenance

Road Maintenance requirements in Appendix C.

MEF Stewardship II

Item Number Treatment Description

0002C

Optional Leave Tree Protection

Cut all lodgepole pine less than 6” DBH and all other trees less than 7 within 20’ +/- 5’ of all live trees > 18” DBH. Stump heights shall be no more than 6 inches on the uphill side. Lop, Buck & Scatter activity and natural fuels 10 feet away from tree boles. Buck to lengths less than 3 feet. Lop and Scatter to less than 24” in depth (natural fuels are considered any material on the ground that is greater than 3” DBH and 3’ in length.

Cut material shall not lean against an uncut tree, stump, log, and/or obstacle. It shall be secure and not able to roll down hill.

MEF Units 6A (136 acres), 6B (7 acres).

0002D

Optional Light Slashing

Slash all lodgepole pine less than 6” DBH and all other trees less than 7” DBH, except ponderosa pine, to a, 20’ x 20’ spacing. In all units, the spacing may be varied by 25% to select the best leave trees based on the characteristics of desirable trees (straight stem, greater than 40% live crown, free of insect or disease, or dominant or co-dominant crown class). Stump heights shall be no more than 6 inches on the uphill side. Lop, Buck & Scatter activity fuels to lengths less than 3 feet. Lop and Scatter to less than 24” in depth.

Cut material shall not lean against an uncut tree, stump, log, and/or obstacle. It shall be secure and not able to roll down hill.

MEF Units 126A & B (95 acres), 3 (50 acres), 21 (31 acres), 238 (43 acres).

0002E

Optional Moderate Slashing

Slash all lodgepole pine less than 6” DBH and all other trees less than 7” DBH except ponderosa pine to a, 20’ x 20’ spacing. In all units, the spacing shall be varied by 25% to select the best leave trees based on the characteristics of desirable trees (straight stem, greater than 40% live crown, free of insect or disease, or dominant or co-dominant crown class). Stump heights will be no more than 6 inches on the uphill side. Lop, Buck & Scatter activity fuels to lengths less than 3 feet. Lop and Scatter to less than 24” in depth.

MEF Units 6A (136 acres), 6B (7 acres).

MEF Stewardship II

Item Number Treatment Description

0002F

Optional Hand Fireline

Construction

Clear fireline of all brush and woody debris for a minimum of 4 feet. On the external edge of the fireline, a continuous line of not less than 18” in width shall be scraped to mineral soil using handtools. Cup-trenching, roughly 8” deep is required on all under-slung line.

The minimum overall width of the fireline plus the mineral soil line is 5.5’. Unless otherwise agreed in writing the material from the fireline shall be scattered within the cutting area and not windrowed or otherwise concentrated adjacent to the fuelbreak. Do not mix slash with side cast material.

On slopes greater than ten percent, construct waterbars according to the following waterbar spacing guide:

Fireline Percent Slope Maximum Spacing Feet 10-15 200 15-25 100 25+ 50

Optional Units MEF Units 38 (4000’), 203 (5000’), 238 (4000’), 47 (10500’), 6A (6600’), 6B (3000’)

2. QUALITY ASSURANCE SURVEILLANCE PLAN / PERFORMANCE REQUIREMENTS

SUMMARY

The following describes the major items in the contract with the incentives and deductions for the work described. Items below are included here as requirements.

Work Statement

Performance Standard

Government Method of Assessment

Incentive/Deduction

Timber Removal Activities

Meets 100% Timber Felling, & Bucking requirements as specified in Appendix B.

COR or inspector will conduct periodic monitoring and visual inspection

If Contractor fails to meet the standard, the Government may invoke the remedies outlined in FAR 52.212- 4(a) and (d), which includes, but is not limited to reperformance of nonconforming services at no increase in contract price, and/or termination for cause.

The Contractor’s quality will be reflected in the performance assessment either positive or negative.

Helicopter Yarding

Meets 100% Helicopter Yarding treatment and safety meet requirements in Appendix B.

COR or inspector will conduct periodic monitoring and visual inspection

If Contractor fails to meet the standard, the Government may invoke the remedies outlined in FAR 52.212- 4(a) and (d), which includes, but is not limited to reperformance of nonconforming services at no increase in contract price, and/or termination for cause.

The Contractor’s quality will be reflected in the performance assessment either positive or negative.

Timber Delivery

All material meeting the utilization standards in Appendix B shall be removed from Forest Service Lands.

COR or inspector will conduct periodic monitoring and visual inspection

If Contractor fails to meet the standard, the Government may invoke the remedies outlined in FAR 52.212- 4(a) and (d), which includes, but is not limited to reperformance of nonconforming services at no increase in contract price, and/or termination for cause.

The Contractor’s quality will be reflected in the performance assessment either positive or negative.

Slashing

Quality meets or exceeds 90% of performance standard based on specifications within Appendix A. The Contractors Quality Control Inspection System will be used to determine level of performance.

COR or inspector will conduct periodic monitoring and visual inspection

If Contractor fails to meet the standard, the Government may invoke the remedies outlined in FAR 52.212- 4(a) and (d), which includes, but is not limited to reperformance of nonconforming services at no increase in contract price, and/or termination for cause.

The Contractor’s quality will be reflected in the performance assessment either positive or negative.

Fireline Construction

Quality meets or exceeds 90% of performance standard based on specifications within Appendix A. The Contractors Quality Control Inspection System will be used to determine level of performance.

COR or inspector will conduct periodic monitoring and visual inspection

If Contractor fails to meet the standard, the Government may invoke the remedies outlined in FAR 52.212- 4(a) and (d), which includes, but is not limited to reperformance of nonconforming services at no increase in contract price, and/or termination for cause.

The Contractor’s quality will be reflected in the performance assessment either positive or negative.

Leave Tree Protection

Quality meets or exceeds 90% of performance standard based on specifications within Appendix A. The Contractors Quality Control Inspection System will be used to determine level of performance.

COR or inspector will conduct periodic monitoring and visual inspection

If Contractor fails to meet the standard, the Government may invoke the remedies outlined in FAR 52.212- 4(a) and (d), which includes, but is not limited to reperformance of nonconforming services at no increase in contract price, and/or termination for cause.

The Contractor’s quality will be reflected in the performance assessment either positive or negative.

Pile Landings, De-compaction and Erosion Control Seeding

Meets 100% Slash Treatment for Piling, and Scarification and Erosion control Seeding as specified in Appendix B.

CO or COR will review and approve quality control inspection system.

If the Contractor fails to meet standards, work may be suspended or put in Default for failure to take corrective action immediately.

If Contractor fails to meet the standard, the Government may invoke the remedies outlined in FAR 52.212- 4(a) and (d), which includes, but is not limited to reperformance of nonconforming services at no increase in contract price, and/or termination for cause.

The Contractor’s quality will be

MEF Stewardship II Road Maintenance

Meets 100% of Road Maintenance as specified in Appendix C.

CO or COR will review and approve quality control inspection system.

If the Contractor fails to meet standards, work may be suspended or put in Default for failure to take corrective action immediately.

If Contractor fails to meet the standard, the Government may invoke the remedies outlined in FAR 52.212- 4(a) and (d), which includes, but is not limited to reperformance of nonconforming services at no increase in contract price, and/or termination for cause.

The Contractor’s quality will be reflected in the performance assessment either positive or negative.

Contractor’s Quality Control Inspection System

Prior to commencing work Contractor provides Forest Service with an acceptable quality control inspection system.

CO or COR will review and approve quality control inspection system.

If the Contractor fails to meet standards, work may be suspended or put in Default for failure to take corrective action immediately.

If Contractor fails to meet the standard, the Government may invoke the remedies outlined in FAR 52.212- 4(a) and (d), which includes, but is not limited to reperformance of nonconforming services at no increase in contract price, and/or termination for cause.

The Contractor’s quality will be

MEF Stewardship II Contractor’s Quality Control

Contractor’s inspections are +/-5% of Government’s quality assurance monitoring.

Inspection is completed as promised in the Contractors Quality Control Inspection System. Inspection forms are complete and accurate.

COR or Inspectors will review Contractors Quality Control data sheets and revisit a sample of the inspection locations.

If Contractor fails to meet the standard, the Government may invoke the remedies outlined in FAR 52.212- 4(a) and (d), which includes, but is not limited to re-performance of nonconforming services at no increase in contract price, and/or termination for cause The Contractor’s quality will be reflected in the performance assessment either positive or negative.

If the Government’s results are objectionable to the Contractor, the Contractor may request a re-examination in writing, within 5 calendar days after receipt of the Government’s quality assurance results.

The request shall include documentation that supports that the probability of an error exists. The Government’s re-examination will consist of a 2-percent sample utilizing the same inspection method as the original examination, but new plots will be selected with different plot centers than the plots previously inspected by the Government. If the results of the re-examination are within 5-percent of the Contractor’s submitted quality control results, the Contractor’s results will be considered acceptable and used for pay.

If results of the re-examination exceed 5-percent of the Contractor’s submitted quality control results, the Government’s re-examination will be used for the basis of pay and the Contractor will be assessed the costs incurred by the Government that are directly related to the performance of such service.

If the Contractor fails to meet the standards, work may be suspended or the Contractor in Default for failure to immediately take corrective action.

That failure will be reflected adversely in the performance assessment.

MEF Stewardship II Work Plan and Schedule for Items 001A, 001B, 001C, 001D, 001E, 001F, 002A, 002B, 002C, 002D, 002E, 002F

Prior to the commencing work, Contractor provides Forest Service with an acceptable Work Plan and Schedule for Items. 001A, 001B, 001C, 001D, 001E, 001F, 002A, 002B, 002C, 002D, 002E, 002F

CO or COR will review and approve Work Plan and Schedule.

If Contractor fails to meet the standard, the Government may invoke the remedies outlined in FAR 52.212- 4(a) and (d), which includes, but is not limited to re-performance of nonconforming services at no increase in contract price, and/or termination for cause The Contractor’s quality will be