AG-03K0-S-15-0007_Construction_Plans.pdf

PDF 4 MB Posted

Attached to
LEWIS & CLARK NATIONAL FOREST - Dry Pole ATV Trail Construction
Solicitation number
AG-03K0-S-15-0007
Issued by

About this file

Project construction plans

View the file

Other files

File Type Posted
AG-03K0-S-15-0007_SF-18.pdf PDF
AG-03K0-S-15-0007.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION PLANS FOR

DRY POLE ATV TRAIL CONSTRUCTION

DESCRIPTION SHEET NO.

TITLE SHEET AND INDEX I

PROJECTAREAMAP 2

PROJECT NOTES AND ESTIMATE OF QUANTITIES 3

SURVEY LOG1 4

SURVEY LOG2 5

SURVEYLOG3 6.

SURVEY LOG4 7

CONSTRUCTION LOG 8

CLEARING LIMITS/TYPICAL TRAIL CROSS SECTIONS 9

TRAILBED AND SLOPE FINISH/ROLLING DIP 10

DITCH/CLIMBING TURN 11

TURNPIKE, TYPE Il/EXISTING TRAIL RESTORATION 12

CULVERT WITHOUT HEADWALLS/OBLITERATION 13

CATTLE GUARD CROSSING 14

CATTLE GUARD CROSSING H-BRACE 15

DATE

certrlj Pp lrdaCal ttvrry c1 thr desrr, arttl ecomnYnd approval fur coristruckon

DATE

hdvn ,nIpWnd is pro ccl and cnl fy that S tIn and 3’ resoc P 1 anerrert

DATE .

TIns cr;ect 5 trerrrtr.sacy to fttp truest -arid gria arid 5 Te’r-h5 sltTconed for .

I Icz z

U.S. DEPARTMENT OF AGRICULTURE - FOREST SERVICE - REGION ONE

LEWIS & CLARK NATIONAL FOREST JUDITH RANGER DISTRICT

1.

INDEX

II

R c

HiGHWAY S41

-. TA .

\CCuNTYROADSOHFOR,

- OREI BOUNDARY

I.IEMORIAL WAY ROAD 4S7

fRA/AIE IAND BOUNI)ARY

DRY POLE ATV TPc PriOtEC AREA

SUBMITTED

VICINITY_MAP

In

- DATE

1IIL ElGINEER I ceorty that fY15 Trcfnct trdS bee.n desr5Cd with sorto ersjhreerrog pvaritrre, and ibnirt rffn rewrrw and

I

REVIEWED . . -

F ORE S T El

APPROVED

A’61 - EP

APPROVED

ESTSUPESOR

LOCATION MAP

NOT TO SCALE

U.S. DEPARTMENT OF AGRICULTURE - FOREST SERVICE - REGION ONE

LEWIS & CLARK NATIONAL FOREST JUDITH RANGER DISTRICT

INDEX

DESCRIPTION SHEET NO.

TITLE SHEET AND INDEX

SURVEY LOG 1

CONSTRUCTION PLANS FOR

DRY POLE ATV TRAIL CONSTRUCTION

VICINITY MAP

NOT TO SCALE

SUBMITTED

APPROVED

REVIEWED

APPROVED

DATE

DATE

DATE

DATE

CIVIL ENGINEER

DISTRICT RANGER

FOREST ENGINEER

FOREST SUPERVISOR

I certify that this project has been designed with sound engineering practices and submit it for review and approval.

I have reviewed this project and certify that it meets the land and resource management requirements.

I certify the technical adequacy of this design and recommend approval for construction.

This project is necessary to the forest program needs and goals and is hereby approved for construction.

SURVEY LOG 2

SURVEY LOG 3

SURVEY LOG 4

CONSTRUCTION LOG

CLEARING LIMITS/TYPICAL TRAIL CROSS SECTIONS

TRAILBED AND SLOPE FINISH/ROLLING DIP

DITCH/CLIMBING TURN

PROJECT NOTES AND ESTIMATE OF QUANTITIES

HIGHWAY 541

COUNTY ROAD SOUTH FORK

DRY POLE ATV TRAIL

PROJECT AREA

TURNPIKE, TYPE II/EXISTING TRAIL RESTORATION

CULVERT WITHOUT HEADWALLS/OBLITERATION

CATTLE GUARD CROSSING

CATTLE GUARD CROSSING H-BRACE

FOREST BOUNDARYPRIVATE LAND BOUNDARY

MEMORIAL WAY ROAD 487

UTICA

STANFORD

PROJECT AREA MAP

WINDHAM

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

DRYPOLE.DWG

6/2015

6/2015

6/2015

J. NOLAND

J. NOLAND

S. VANSICKLE

MAP

AREA

TRAIL CONSTRUCTION

DRY POLE ATV

GREAT FALLS, MT

LEWIS & CLARK NATIONAL FOREST

R. STOVALL 6/2015

STATION 0+00

STATION 134+74

ROAD 487

TO UTICA

PROJECT ACCESS

STATION 77+91

STATION 88+81

STATION 92+16

STATION 106+46

STATION 114+11

STATION 129+30

GENERAL NOTES

1. MATERIALS AND CONSTRUCTION FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MAINTENANCE OF TRAILS AND THE SPECIAL PROJECT SPECIFICATIONS

2. ESTIMATE OF QUANTITIES ARE FOR CONTRACTOR CONVENIENCE ONLY, CONTRACTOR SHALL BE RESPONSIBLE TO

VERIFY ALL QUANTITIES, VOLUMES AND LENGTHS.

ESTIMATE OF QUANTITIES

NOTE - ESTIMATE OF QUANTITIES ARE FOR CONTRACTOR CONVENIENCE ONLY, CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY ALL QUANTITIES, VOLUMES AND LENGTHS.

SPECIFICATION NOTES

904 THE EXISTING TRAIL MUST REMAIN OPEN DURING THE ENTIRE DURATION OF THE PROJECT. ALSO, THE CURRENT

LEWIS AND CLARK TRAVEL PLAN MAP IS APPLICABLE TO THE CONTRACTOR.

907 THE EQUIPMENT USED ON THE PROJECT MUST BE WEED SEED FREE BEFORE ENTERING FOREST SERVICE LANDS.

908 THE FOREST SERVICE WILL PROVIDE CONSTRUCTION STAKING IN THE VICINITY OF CLIMBING TURNS,TURNPIKE, CULVERTS, AND ROLLING DIPS.

912 ROLLING DIPS SHALL BE CONSTRUCTED AT LOCATIONS STAKED BY THE CO. ROLLING DIPS LEADOUT DITCHES SHALL BE CONSTRUCTED AT APPROXIMATE LOCATIONS SHOWN ON THE CONSTRUCTION LOG. THE EXACT LOCATION OF THE ROLLING DIPS AND LEADOUT DITCHES SHALL BE STAKED BY THE CO. THE LOCATION FOR THE ROLLING DIPS AND LEADOUT DITCHES WILL BE MARKED AFTER THE TRAIL TEMPLATE HAS BEEN PIONEERED. THE

CONSTRUCTION OF LEADOUT DITCHES IS INCIDENTAL TO PAY ITEM 912(06).

ITEM DESCRIPTION METHOD OF MEASURE PAY UNIT MEASURE

911 (02) Clearing & Grubbing DQ Linear Feet 7791

912 (01) Excavation DQ Linear Feet 7791

912 (06) Rolling Dip AQ Each 30

913(01) Turnpike-Retainer Treated Post AQ Linear Feet 50

915 (01) Trail Restoration DQ Linear Feet 1318

921(01) 18” Corrugated, Type Rigid Polyethylene Pipe-0.05 Inch Thickness AQ Linear Feet 14

951 (01) Mobilization LSQ Lump Sum 1

937(01) Cattle Guard Installation LSQ Lump Sum 1

954 (09) Trail Obliteration DQ MILE 0.06

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

DRYPOLE.DWG

6/2015

6/2015

6/2015

J. NOLAND

J. NOLAND

S. VANSICKLE

ESTIMATE OF QUANTITIES

PROJECT NOTES &

TRAIL CONSTRUCTION

DRY POLE ATV

GREAT FALLS, MT

LEWIS & CLARK NATIONAL FOREST

R. STOVALL 6/2015

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

DRYPOLE.DWG

6/2015

6/2015

6/2015

J. NOLAND

J. NOLAND

S. VANSICKLE

LOG 1

SURVEY

TRAIL CONSTRUCTION

DRY POLE ATV

GREAT FALLS, MT

LEWIS & CLARK NATIONAL FOREST

R. STOVALL 6/2015

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

1 0 153.3 26.914 27 8 BEGINNING OF TRAIL 464 OPPOSITE OF FORD

2 27 162.9 19.612 20 20

3 47 165.2 28.883 29 9

4 76 161.5 54.931 55 5

5 131 153 37.907 38 7 ENTERING TIMBER

6 169 173.5 27.932 28 7

7 197 184.4 23.8 24 13 HEAVY TIMBER

8 221 183 32.895 33 8

9 254 175.8 28.929 29 7

10 283 187.3 27.932 28 7

11 311 201 44.73 45 -11

12 356 204 49.644 50 -12

13 406 201.9 69.913 70 -5 LEAVING TREES

14 476 188.4 73.967 74 3

15 550 188.2 48.912 49 6 ENTERING TREES

16 599 182.8 60.035 61 18

17 660 191.2 25.937 26 -7 LEAVING TREES

18 686 184.6 22.26 23 -26

19 709 183.9 34.993 35 2

20 744 184.3 34.385 35 19 ENTERING TREES

21 779 221.2 42.787 43 10

22 822 219.9 17.986 18 -4

23 840 216.4 31.772 32 -12

24 872 215.2 26.661 27 16 BOTTOM DRAINAGE

25 899 232.6 30.986 31 3

26 930 222.5 40.949 41 5

27 971 218.3 37.399 38 18

28 1009 235.6 30.779 31 -12

29 1040 237.9 36.477 37 -17

30 1077 199.3 69.997 70 -1

31 1147 202.8 54.901 55 6 POSSIBLE WET IN SPRING TIME; HUB CL TRAIL

32 1202 185.1 46.811 47 9 LEAVING TREES

33 1249 195.6 63.987 64 -2

34 1313 183.4 81.934 82 -4

35 1395 175.3 52.905 53 -6 ENTERING TREES

36 1448 180.7 53.146 54 18

37 1502 190.5 70.982 72 17

38 1574 181.3 135.677 137 14 POSSIBLE GRADE REVERSAL

39 1711 174.1 57.516 58 13

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

40 1769 164.3 53.932 55 20

41 1824 175.3 67.783 68 8 FENCE LINE

42 1892 162.3 49.7 50 11 ROLLING DIP

43 1942 177.7 40.797 41 10 HEAVY DOWNFALL

44 1983 201.5 24.969 25 5

45 2008 148.4 19.901 20 10

46 2028 103.6 18.79 19 15

47 2047 66.1 13.644 14 23

48 2061 39.2 12.696 13 22

49 2074 53.5 11.695 12 23

50 2086 84.3 15.407 16 28

51 2102 130.4 21.652 22 18

52 2124 182.6 10.934 11 -11

53 2135 157 59.64 60 11 GRADE REVERSAL

54 2195 162.5 58.165 59 17

55 2254 191.4 15.961 16 -7

56 2270 178.9 42.981 43 3 GRADE REVERSAL

57 2313 166.3 58.856 59 7

58 2372 175.9 28.908 29 -8

59 2401 183 37.463 38 -17 ENTERING MEADOW

60 2439 158.6 47.156 48 -19

61 2487 125.9 49.7 50 -11

62 2537 108 49.99 50 2 GRADE REVERSAL

63 2587 143.3 93.958 94 -3

64 2681 128.4 23.941 24 -7

65 2705 172.7 50.959 51 4 CENTER OF DRAINAGE; GRADE REVERSAL

66 2756 174.5 46.998 47 1

67 2803 220.3 37.811 38 10 LEAVING MEADOW

68 2841 265.2 18.865 19 -12

69 2860 223.3 82.307 83 13 GRADE REVERSAL

70 2943 201.2 60.851 61 7 ENTERING MEADOW

71 3004 221 16.969 17 -6

72 3021 149.4 93.925 94 4 GRADE REVERSAL

73 3115 167.6 110.911 111 -4

74 3226 152.1 146.641 147 7 GRADE REVERSAL

75 3373 148.9 78.901 79 5

76 3452 203.6 21.973 22 -5

77 3474 160.5 116.419 117 10 GRADE REVERSAL

78 3591 156.7 92.626 93 9

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

79 3684 188.8 12.99 13 -4

80 3697 184.8 10.973 11 7 GRADE REVERSAL; CENTER OF DRAINAGE

81 3708 170.7 65.987 66 2 LEAVING MEADOW

82 3774 155.7 90.959 91 3

83 3865 195.4 40.998 41 -1 SKID ROAD

84 3906 189.6 11.884 12 -14

85 3918 180.1 33.672 34 14 GRADE REVERSAL; CENTER OF DRAINAGE

86 3952 159.6 39.839 40 9

87 3992 208.6 34.956 35 -5

88 4027 212.1 55.601 56 12 BOTTOM OF DRAINAGE

89 4083 229.5 43.991 44 2

90 4127 228.6 35.855 36 9

91 4163 213.5 18.556 19 22

92 4182 150.1 33.402 34 19

93 4216 134.5 34.662 35 14

94 4251 151.7 38.167 39 21

95 4290 197.8 25.988 26 3

96 4316 214.3 54.901 55 6

97 4371 163.3 25.783 26 13

98 4397 120.1 48.591 49 13

99 4446 160.5 37.523 38 16

100 4484 194.1 40.754 41 11

101 4525 232.4 63.997 64 1

102 4589 256.6 24.969 25 -5

103 4614 201.1 19.951 20 7 GRADE REVERSAL

104 4634 151.1 24.646 25 17

105 4659 131.8 65.53 66 12

106 4725 178.3 57.767 58 9

107 4783 195 53 53 0

108 4836 198.5 33.939 34 -6

109 4870 182.3 34.915 35 -7

110 4905 223.9 88.466 89 -11

111 4994 204.6 29.976 30 4 GRADE REVERSAL

112 5024 228.5 58.646 59 -11

113 5083 187.8 53.549 54 13 GRADE REVERSAL

114 5137 170.7 69.416 70 13

115 5207 164.5 74.628 75 10

116 5282 160.3 75.864 76 -6

117 5358 140.4 52.737 53 10 GRADE REVERSAL

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

118 5411 165.4 53.957 54 -4

119 5465 139.2 87.785 88 7 GRADE REVERSAL

120 5553 166.6 60.89 61 -6

121 5614 143.8 83.795 84 7 GRADE REVERSAL

122 5698 181.3 47.762 48 -10

123 5746 192 62.303 63 -15

124 5809 190.6 67.343 68 14 BOTTOM OF DRAINAGE; GRADE REVERSAL

125 5877 209.1 71.871 72 6

126 5949 254.6 44.857 45 -8

127 5994 233.5 58.894 59 6 GRADE REVERSAL

128 6053 227.8 58.508 59 13

129 6112 200.2 48.458 49 15

130 6161 203.7 54.997 55 1

131 6216 138.1 114.634 115 8

132 6331 145.5 123.845 124 5

133 6455 133.5 105.662 106 8

134 6561 140.9 99.756 100 7

135 6661 129.2 31.96 32 -5

136 6693 155.9 37.772 38 11 CENTER OF DRAINAGE; GRADE REVERSAL

137 6731 178.5 123.697 124 -7

138 6855 194.3 63.544 64 -12

139 6919 157.9 22.959 23 6 CENTER OF DRAINAGE; GRADE REVERSAL

140 6942 220.1 90.352 91 -12

141 7033 219.3 122.263 123 -11

142 7156 163.7 28.964 29 5 GRADE REVERSAL

143 7185 186 71.771 72 -8

144 7257 200.8 47.321 48 -17

145 7305 148.7 82.934 83 -4

146 7388 174.1 104.252 105 -12

147 7493 239.4 69.58 70 -11

148 7563 330 56.974 57 3 GRADE REVERSAL

149 7620 290.6 55.722 56 -10

150 7676 220.8 69.226 70 -15

151 7746 175.9 44.998 45 1 GRADE REVERSAL

152 7791 END OF NEW TRAIL CONSTRUCTION-TRAIL PROJECT CONTINUES

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

DRYPOLE.DWG

6/2015

6/2015

6/2015

J. NOLAND

J. NOLAND

S. VANSICKLE

LOG 2

SURVEY

TRAIL CONSTRUCTION

DRY POLE ATV

GREAT FALLS, MT

LEWIS & CLARK NATIONAL FOREST

R. STOVALL 6/2015

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

40 1769 164.3 53.932 55 20

41 1824 175.3 67.783 68 8 FENCE LINE

42 1892 162.3 49.7 50 11 ROLLING DIP

43 1942 177.7 40.797 41 10 HEAVY DOWNFALL

44 1983 201.5 24.969 25 5

45 2008 148.4 19.901 20 10

46 2028 103.6 18.79 19 15

47 2047 66.1 13.644 14 23

48 2061 39.2 12.696 13 22

49 2074 53.5 11.695 12 23

50 2086 84.3 15.407 16 28

51 2102 130.4 21.652 22 18

52 2124 182.6 10.934 11 -11

53 2135 157 59.64 60 11 GRADE REVERSAL

54 2195 162.5 58.165 59 17

55 2254 191.4 15.961 16 -7

56 2270 178.9 42.981 43 3 GRADE REVERSAL

57 2313 166.3 58.856 59 7

58 2372 175.9 28.908 29 -8

59 2401 183 37.463 38 -17 ENTERING MEADOW

60 2439 158.6 47.156 48 -19

61 2487 125.9 49.7 50 -11

62 2537 108 49.99 50 2 GRADE REVERSAL

63 2587 143.3 93.958 94 -3

64 2681 128.4 23.941 24 -7

65 2705 172.7 50.959 51 4 CENTER OF DRAINAGE; GRADE REVERSAL

66 2756 174.5 46.998 47 1

67 2803 220.3 37.811 38 10 LEAVING MEADOW

68 2841 265.2 18.865 19 -12

69 2860 223.3 82.307 83 13 GRADE REVERSAL

70 2943 201.2 60.851 61 7 ENTERING MEADOW

71 3004 221 16.969 17 -6

72 3021 149.4 93.925 94 4 GRADE REVERSAL

73 3115 167.6 110.911 111 -4

74 3226 152.1 146.641 147 7 GRADE REVERSAL

75 3373 148.9 78.901 79 5

76 3452 203.6 21.973 22 -5

77 3474 160.5 116.419 117 10 GRADE REVERSAL

78 3591 156.7 92.626 93 9

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

79 3684 188.8 12.99 13 -4

80 3697 184.8 10.973 11 7 GRADE REVERSAL; CENTER OF DRAINAGE

81 3708 170.7 65.987 66 2 LEAVING MEADOW

82 3774 155.7 90.959 91 3

83 3865 195.4 40.998 41 -1 SKID ROAD

84 3906 189.6 11.884 12 -14

85 3918 180.1 33.672 34 14 GRADE REVERSAL; CENTER OF DRAINAGE

86 3952 159.6 39.839 40 9

87 3992 208.6 34.956 35 -5

88 4027 212.1 55.601 56 12 BOTTOM OF DRAINAGE

89 4083 229.5 43.991 44 2

90 4127 228.6 35.855 36 9

91 4163 213.5 18.556 19 22

92 4182 150.1 33.402 34 19

93 4216 134.5 34.662 35 14

94 4251 151.7 38.167 39 21

95 4290 197.8 25.988 26 3

96 4316 214.3 54.901 55 6

97 4371 163.3 25.783 26 13

98 4397 120.1 48.591 49 13

99 4446 160.5 37.523 38 16

100 4484 194.1 40.754 41 11

101 4525 232.4 63.997 64 1

102 4589 256.6 24.969 25 -5

103 4614 201.1 19.951 20 7 GRADE REVERSAL

104 4634 151.1 24.646 25 17

105 4659 131.8 65.53 66 12

106 4725 178.3 57.767 58 9

107 4783 195 53 53 0

108 4836 198.5 33.939 34 -6

109 4870 182.3 34.915 35 -7

110 4905 223.9 88.466 89 -11

111 4994 204.6 29.976 30 4 GRADE REVERSAL

112 5024 228.5 58.646 59 -11

113 5083 187.8 53.549 54 13 GRADE REVERSAL

114 5137 170.7 69.416 70 13

115 5207 164.5 74.628 75 10

116 5282 160.3 75.864 76 -6

117 5358 140.4 52.737 53 10 GRADE REVERSAL

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

118 5411 165.4 53.957 54 -4

119 5465 139.2 87.785 88 7 GRADE REVERSAL

120 5553 166.6 60.89 61 -6

121 5614 143.8 83.795 84 7 GRADE REVERSAL

122 5698 181.3 47.762 48 -10

123 5746 192 62.303 63 -15

124 5809 190.6 67.343 68 14 BOTTOM OF DRAINAGE; GRADE REVERSAL

125 5877 209.1 71.871 72 6

126 5949 254.6 44.857 45 -8

127 5994 233.5 58.894 59 6 GRADE REVERSAL

128 6053 227.8 58.508 59 13

129 6112 200.2 48.458 49 15

130 6161 203.7 54.997 55 1

131 6216 138.1 114.634 115 8

132 6331 145.5 123.845 124 5

133 6455 133.5 105.662 106 8

134 6561 140.9 99.756 100 7

135 6661 129.2 31.96 32 -5

136 6693 155.9 37.772 38 11 CENTER OF DRAINAGE; GRADE REVERSAL

137 6731 178.5 123.697 124 -7

138 6855 194.3 63.544 64 -12

139 6919 157.9 22.959 23 6 CENTER OF DRAINAGE; GRADE REVERSAL

140 6942 220.1 90.352 91 -12

141 7033 219.3 122.263 123 -11

142 7156 163.7 28.964 29 5 GRADE REVERSAL

143 7185 186 71.771 72 -8

144 7257 200.8 47.321 48 -17

145 7305 148.7 82.934 83 -4

146 7388 174.1 104.252 105 -12

147 7493 239.4 69.58 70 -11

148 7563 330 56.974 57 3 GRADE REVERSAL

149 7620 290.6 55.722 56 -10

150 7676 220.8 69.226 70 -15

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

DRYPOLE.DWG

6/2015

6/2015

6/2015

J. NOLAND

J. NOLAND

S. VANSICKLE

LOG 3

SURVEY

TRAIL CONSTRUCTION

DRY POLE ATV

GREAT FALLS, MT

LEWIS & CLARK NATIONAL FOREST

R. STOVALL 6/2015

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

79 3684 188.8 12.99 13 -4

80 3697 184.8 10.973 11 7 GRADE REVERSAL; CENTER OF DRAINAGE

81 3708 170.7 65.987 66 2 LEAVING MEADOW

82 3774 155.7 90.959 91 3

83 3865 195.4 40.998 41 -1 SKID ROAD

84 3906 189.6 11.884 12 -14

85 3918 180.1 33.672 34 14 GRADE REVERSAL; CENTER OF DRAINAGE

86 3952 159.6 39.839 40 9

87 3992 208.6 34.956 35 -5

88 4027 212.1 55.601 56 12 BOTTOM OF DRAINAGE

89 4083 229.5 43.991 44 2

90 4127 228.6 35.855 36 9

91 4163 213.5 18.556 19 22

92 4182 150.1 33.402 34 19

93 4216 134.5 34.662 35 14

94 4251 151.7 38.167 39 21

95 4290 197.8 25.988 26 3

96 4316 214.3 54.901 55 6

97 4371 163.3 25.783 26 13

98 4397 120.1 48.591 49 13

99 4446 160.5 37.523 38 16

100 4484 194.1 40.754 41 11

101 4525 232.4 63.997 64 1

102 4589 256.6 24.969 25 -5

103 4614 201.1 19.951 20 7 GRADE REVERSAL

104 4634 151.1 24.646 25 17

105 4659 131.8 65.53 66 12

106 4725 178.3 57.767 58 9

107 4783 195 53 53 0

108 4836 198.5 33.939 34 -6

109 4870 182.3 34.915 35 -7

110 4905 223.9 88.466 89 -11

111 4994 204.6 29.976 30 4 GRADE REVERSAL

112 5024 228.5 58.646 59 -11

113 5083 187.8 53.549 54 13 GRADE REVERSAL

114 5137 170.7 69.416 70 13

115 5207 164.5 74.628 75 10

116 5282 160.3 75.864 76 -6

117 5358 140.4 52.737 53 10 GRADE REVERSAL

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

118 5411 165.4 53.957 54 -4

119 5465 139.2 87.785 88 7 GRADE REVERSAL

120 5553 166.6 60.89 61 -6

121 5614 143.8 83.795 84 7 GRADE REVERSAL

122 5698 181.3 47.762 48 -10

123 5746 192 62.303 63 -15

124 5809 190.6 67.343 68 14 BOTTOM OF DRAINAGE; GRADE REVERSAL

125 5877 209.1 71.871 72 6

126 5949 254.6 44.857 45 -8

127 5994 233.5 58.894 59 6 GRADE REVERSAL

128 6053 227.8 58.508 59 13

129 6112 200.2 48.458 49 15

130 6161 203.7 54.997 55 1

131 6216 138.1 114.634 115 8

132 6331 145.5 123.845 124 5

133 6455 133.5 105.662 106 8

134 6561 140.9 99.756 100 7

135 6661 129.2 31.96 32 -5

136 6693 155.9 37.772 38 11 CENTER OF DRAINAGE; GRADE REVERSAL

137 6731 178.5 123.697 124 -7

138 6855 194.3 63.544 64 -12

139 6919 157.9 22.959 23 6 CENTER OF DRAINAGE; GRADE REVERSAL

140 6942 220.1 90.352 91 -12

141 7033 219.3 122.263 123 -11

142 7156 163.7 28.964 29 5 GRADE REVERSAL

143 7185 186 71.771 72 -8

144 7257 200.8 47.321 48 -17

145 7305 148.7 82.934 83 -4

146 7388 174.1 104.252 105 -12

147 7493 239.4 69.58 70 -11

148 7563 330 56.974 57 3 GRADE REVERSAL

149 7620 290.6 55.722 56 -10

150 7676 220.8 69.226 70 -15

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

DRYPOLE.DWG

6/2015

6/2015

6/2015

J. NOLAND

J. NOLAND

S. VANSICKLE

LOG 4

SURVEY

TRAIL CONSTRUCTION

DRY POLE ATV

GREAT FALLS, MT

LEWIS & CLARK NATIONAL FOREST

R. STOVALL 6/2015

INDEX NUMBER FIELD REFERENCE STATION (FEET) MAGNETIC AZMITH AHEAD (DEGREES) HORIZONTAL DISTANCE AHEAD (FEET) SLOPE DISTANCE AHEAD (FEET) GRADE AHEAD (%) SURVEYOR CALLS

118 5411 165.4 53.957 54 -4

119 5465 139.2 87.785 88 7 GRADE REVERSAL

120 5553 166.6 60.89 61 -6

121 5614 143.8 83.795 84 7 GRADE REVERSAL

122 5698 181.3 47.762 48 -10

123 5746 192 62.303 63 -15

124 5809 190.6 67.343 68 14 BOTTOM OF DRAINAGE; GRADE REVERSAL

125 5877 209.1 71.871 72 6

126 5949 254.6 44.857 45 -8

127 5994 233.5 58.894 59 6 GRADE REVERSAL

128 6053 227.8 58.508 59 13

129 6112 200.2 48.458 49 15

130 6161 203.7 54.997 55 1

131 6216 138.1 114.634 115 8

132 6331 145.5 123.845 124 5

133 6455 133.5 105.662 106 8

134 6561 140.9 99.756 100 7

135 6661 129.2 31.96 32 -5

136 6693 155.9 37.772 38 11 CENTER OF DRAINAGE; GRADE REVERSAL

137 6731 178.5 123.697 124 -7

138 6855 194.3 63.544 64 -12

139 6919 157.9 22.959 23 6 CENTER OF DRAINAGE; GRADE REVERSAL

140 6942 220.1 90.352 91 -12

141 7033 219.3 122.263 123 -11

142 7156 163.7 28.964 29 5 GRADE REVERSAL

143 7185 186 71.771 72 -8

144 7257 200.8 47.321 48 -17

145 7305 148.7 82.934 83 -4

146 7388 174.1 104.252 105 -12

147 7493 239.4 69.58 70 -11

148 7563 330 56.974 57 3 GRADE REVERSAL

149 7620 290.6 55.722 56 -10

150 7676 220.8 69.226 70 -15

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

DRYPOLE.DWG

6/2015

6/2015

6/2015

J. NOLAND

J. NOLAND

S. VANSICKLE

LOG

CONSTRUCTION

TRAIL CONSTRUCTION

DRY POLE ATV

GREAT FALLS, MT

LEWIS & CLARK NATIONAL FOREST

R. STOVALL 6/2015

INDEX NUMBER FIELD REFERENCE STATION (FEET) WORK DESCRIPTION

1 0 BEGIN TRAIL CONSTRUCTION

38 1574 CONSTRUCT ROLLING DIP

39 1711 CONSTRUCT ROLLING DIP

41 1824 PLACE CATTLE GUARD CROSSING

42 1892 CONSTRUCT ROLLING DIP

44 1983 BEGIN CONSTRUCTION CLIMBING TURN, PC

48 2061 END CONSTRUCTION CLIMBING TURN PT, CONSTRUCT ROLLING DIP

49 2074 BEGIN CONSTRUCTION CLIMBING TURN PC

52 2124 END CONSTRUCTION CLIMBING TURN PT

60 2439 CONSTRUCT ROLLING DIP

67 2803 CONSTRUCT ROLLING DIP

70 2943 CONSTRUCT ROLLING DIP

75 3373 CONSTRUCT ROLLING DIP

78 3591 CONSTRUCT ROLLING DIP

90 4127 CONSTRUCT ROLLING DIP

93 4216 CONSTRUCT ROLLING DIP

96 4316 CONSTRUCT ROLLING DIP

98 4397 CONSTRUCT ROLLING DIP

100 4484 CONSTRUCT ROLLING DIP

115 5207 CONSTRUCT ROLLING DIP

132 6331 CONSTRUCT ROLLING DIP

134 6561 CONSTRUCT ROLLING DIP

141 7033 CONSTRUCT ROLLING DIP

145 7305 CONSTRUCT ROLLING DIP

152 7791 END NEW TRAIL CONSTRUCTION-PROJECTS CONTIUES

NA 7794 CONSTRUCT ROLLING DIP

NA 7999 CONSTRUCT ROLLING DIP

NA 8124 CONSTRUCT ROLLING DIP

NA 8294 CONSTRUCT ROLLING DIP

NA 8563 CONSTRUCT ROLLING DIP

NA 8659 CONSTRUCT ROLLING DIP

NA 8804 CONSTRUCT ROLLING DIP

NA 8881 BEGIN TRAIL OBLITERATION ON RIGHT

NA 8939 CONSTRUCT ROLLING DIP

NA 9216 END TRAIL OBLITERATION ON RIGHT

NA 10419 CONSTRUCT ROLLING DIP

NA 10646 BEGIN TRAIL RESTORATION

NA 10678 CONSTRUCT TURNPIKE, PLACE CULVERT

NA 10696 CONSTRUCT ROLLING DIP

NA 10814 CONSTRUCT ROLLING DIP

INDEX NUMBER FIELD REFERENCE STATION (FEET) WORK DESCRIPTION

NA 10905 CONSTRUCT ROLLING DIP

NA 10980 CONSTRUCT ROLLING DIP

NA 11067 CONSTRUCT ROLLING DIP

NA 11107 CONSTRUCT ROLLING DIP

NA 11160 CONSTRUCT ROLLING DIP

NA 11224 CONSTRUCT ROLLING DIP

NA 11300 CONSTRUCT ROLLING DIP AND OUTLET DITCH

NA 11393 CONSTRUCT ROLLING DIP AND OUTLET DITCH

NA 11411 END TRAIL RESTORATION

NA 11473 CONSTRUCT ROLLING DIP AND OUTLET DITCH

NA 11569 CONSTRUCT ROLLING DIP

NA 12217 CONSTRUCT ROLLING DIP

NA 12930 BEGIN TRAIL RESTORATION

NA 12964 CONSTRUCT ROLLING DIP

NA 13079 CONSTRUCT ROLLING DIP

NA 13146 CONSTRUCT ROLLING DIP

NA 13205 CONSTRUCT ROLLING DIP

NA 13280 CONSTRUCT ROLLING DIP

NA 13324 CONSTRUCT ROLLING DIP AND OUTLET DITCH

NA 13382 CONSTRUCT ROLLING DIP

NA 13404 CONSTRUCT ROLLING DIP

NA 13444 CONSTRUCT ROLLING DIP

NA 13474 END TRAIL RESTORATION, END OF PROJECT, INTERSECTION WITH

EXISTING TRAIL

NOT TO SCALE

Downhill

CLEARING LIMITS

*All heights measured on uphill side of stumps.

Side slope less than or=to 10%

Side slope less than or=to 10%

Stump Height Requirements* (ft)

Stumps outside the

Stump Position clearing limits

Uphill

Cut All Logs

5 FT

Side slope over 10%

Side slope over 10%

Cut

L

C

Side Slope

Clearing Limits (ft.)

Uphill

Cut

Height Downhill

5 FT

Cut

Uphill Downhill

Clearing Limit

Trailway

Trailbed

V e r t i c a l

Downhill

C l e a r i n g

L i m i t

C

L

Clearing Limit

Uphill

4' 4' 10'

5'

Trim branches flush with trunk rather than remove tree.

Stumps between the trailway and clearing limits.

3"

5"

3"

5"

3"

5"

3"

5"

Trail

Width

5' 5' 10'

8'

NOT TO SCALE

TYPICAL TRAIL CROSS SECTIONS

L

C

NOTE:

Fill slope

Fill slope

Above 50%

Sideslope

30% to 50%

Sideslope

Slope rounding in commom material

10% to 30%

Sideslope

Slope rounding in commom material

0% to 10%

Sideslope

Amount of bench varies with % of sideslope. Outslope trailbed 5%

Trailbed

3/4 Bench

Full Bench

Balanced

Section

Slope rounding in commom material

THE SPECIFIED STANDARD

TRAIL WIDTH IS 5 FEET,

EXCEPT FOR SWITCHBACK

AND CULVERT SEGMENTS OF

TRAIL WHICH HAVE A

SPECIFIED WIDTH AS SHOWN

ON THE INCLUDED CROSS

SECTIONS. A TOLERANCE OF

PLUS 0.5 FEET IS APPLICABLE

FOR ALL SPECIFIED TRAIL

WIDTHS. TRANSITION

DISTANCE TO CHANGING

WIDTHS SHALL BE 50 FEET.

CLEARING LIMITS 911-1 TYPICAL TRAIL CROSS SECTIONS 912-1

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE

BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

DRYPOLE.DWG

6/2015

6/2015

6/2015

J. NOLAND

J. NOLAND

S. VANSICKLE

TYPICAL TRAIL CROSS SECTIONS

CLEARING LIMITS

TRAIL CONSTRUCTION

DRY POLE ATV

GREAT FALLS, MT

TRAILBED AND SLOPE FINISH

Slope Finish

Trailbed Finish

Backslope Ratio

Rock 1H:4V

Common 1.5H:1V

Fill Slope Ratio

Remove roots over 1 inch in diameter that protrude from the backslope.

Remove or reduce embedded rock that protrudes more than 2 inches above the trailbed.

Remove loose rock on the trailbed surface over 1 inch in the smallest dimension.

NOT TO SCALE

Rock 1.2H:1V

Common 1.5H:1V diameter that protrude from the

Remove roots over 1 inch in

SEE DRAWING 912-1 FOR TRAIL WIDTH

Trailbed trailbed.

Backslope ratios will vary.

Backslope ratios shall be as stated below, except where show differently in the section views.

TRAILBED AND SLOPE FINISH 912-2 ROLLING DIP 912-5

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE

BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

DRYPOLE.DWG

6/2015

6/2015

6/2015

J. NOLAND

J. NOLAND

S. VANSICKLE

ROLLING DIP

TRAILBED AND SLOPE FINISH

TRAIL CONSTRUCTION

DRY POLE ATV

GREAT FALLS, MT

Leadout Ditch

Depth as needed to drain. 10" min.

12"

Leadout Ditch

Ground Line

A

A

RADIUS

POINT

M

I

N

I

M

U

M

R

A

D

I

U

S

D

O

W

N

G

R

A

D

E

U

P

G

R

A

D

E

SEE WORK LIST SHEET

FOR CROSS DRAIN TYPE AND LOCATION

CUT SLOPE

FILL SLOPE

FILL SLOPE

CUT SLOPE

BACKSLOPE,

REFER TO TRAIL

EXCAVATION

DETAILS

EXISTING GROUND

FILL

SLOPE3%

IN

S

LO

P

E

3%

IN

SLO

PE

PLAN VIEW

SECTION A-A

DITCH 912-7 CLIMBING TURN 912-9

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE

BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

DRYPOLE.DWG

6/2015

6/2015

6/2015

J. NOLAND

J. NOLAND

S. VANSICKLE

CLIMBING TURN

DITCH

TRAIL CONSTRUCTION

DRY POLE ATV

GREAT FALLS, MT

Install rebar 6" from each log end and then at 4' intervals, located outside the trail tread and driven to refusal then cut off flush with top of log.

Notch and butt, 8' min.

length, all retainers together, secure with spike.

Side ditch, construct on upslope side only as staked by the COR.

Embankment and

Rock Source:

A rock source shall be designated within 0.5 miles of the turnpike.

An embankment source shall be designated within 300 feet of the turnpike.

Culvert shall be installed in the turnpike section. See drawing

921 for details.

EXISTING TRAIL RESTORATION 915-1TURNPIKE-TYPE II 913-2

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

DRYPOLE.DWG

6/2015

6/2015

6/2015

J. NOLAND

J. NOLAND

S. VANSICKLE

EXISTING TRAIL RESTORATION

TURNPIKE- TYPE II

TRAIL CONSTRUCTION

DRY POLE ATV

GREAT FALLS, MT

Original ground

Pull material from upper cut area or from downhill side of trail bench.

Provide uniform finished slope.

Compacted suitable material from designated borrow source.

Original ground

Place Sod Mats And Available Slash

On Recontoured Sections

Trailway width varies

NOTE: ALL TRAILBED

SHALL BE SCARIFIED TO

A MINIMUM DEPTH OF 12

INCHES.

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

DRYPOLE.DWG

6/2015

6/2015

6/2015

J. NOLAND

J. NOLAND

S. VANSICKLE

OBLITERATION

CULVERT WITHOUT HEADWALLS

TRAIL CONSTRUCTION

DRY POLE ATV

GREAT FALLS, MT

LEWIS & CLARK NATIONAL FOREST

R. STOVALL 6/2015

CULVERT WITHOUT HEADWALLS 921-1

OBLITERATION 954-1

12" X 12" PRESSURE TREATED TIMBER

FINISHED GRADE

EXISTING

GROUND

GOVERNMENT FURNISHED CATTLE GUARD

5% MAX APPROACH GRADE

2" Ø X 14" STAINLESS STEEL BOLT

WITH WASHERS, LOCK WASHER, AND NUT

TOTAL: 20

2" Ø ALL-THREAD, STAINLESS STEEL

WITH WASHERS, LOCK WASHERS, AND NUTS

TOTAL: 6

PROFILE VIEW - CATTLE GUARD CROSSING

NO SCALE

NOTES:

THE CATTLE GUARD CROSSING STRUCTURE WILL BE

GOVERNMENT FURNISHED: ALL OTHER MATERIALS INCLUDING

THE CONNECTION HARDWARE, TIMBER, AND OTHER

NECESSARY INCIDENTALS SHALL BE PROVIDED BY THE

CONTRACTOR.

ALL EARTHWORK IS INCIDENTAL TO THE PLACEMENT OF THE

CATTLE GUARD CROSSING. ALL EARTHWORK SHALL BE DONE IN

ACCORDANCE WITH SECTION 912.

THE CATTLE GUARD CROSSING SHALL BE PLACED ON A LEVEL

GRADE. THE SUBGRADE SHALL BE APPROVED BY THE COR PRIOR

TO CATTLE GUARD CROSSING PLACEMENT.

ALL HOLES MAY BE FIELD DRILLED. THE HOLE SHALL BE FIELD

TREATED AS SPECIFIED BY THE TIMBER MANUFACTURER WITH

AN APPROVED AWPA TREATMENT.

PLAN VIEW - CATTLE GUARD CROSSING

NO SCALE

COMPACT BACKFILL

ACCORDING TO SECTION 912

7 FT

9 FT

18"

H-BRACE-SEE H-BRACE

DETAIL SHEET

H-BRACE-SEE H-BRACE

DETAIL SHEET

BACKFILL AROUND 12" X 12" FOOTERS LEVEL

WITH THE TOP OF THE FOOTER A DISTANCE OF 1 FT

AND THEN A 11

2:1 SLOPE TO EXISTING GROUND1 FT

5% MAX APPROACH GRADE

TRAIL WIDTH

CATTLE GUARD CROSSING 937-1

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

DRYPOLE.DWG

6/2015

6/2015

6/2015

J. NOLAND

J. NOLAND

S. VANSICKLECATTLE GUARD CROSSING

TRAIL CONSTRUCTION

DRY POLE ATV

GREAT FALLS, MT

H-BRACE DETAIL-CROSS SECTION VIEW

NOTES:

POSTS SET IN GROUND SHALL BE BUTT TREATED BY SOAKING OR PRESSURE TREATMENT

ACCORDING TO AWPA STANDARDS.

CATTLE GUARD CROSSING LOCATION SHALL BE STAKED ON THE GROUND PRIOR TO

CONSTRUCTION.

SIGN MATERIAL SHALL BE PLASTIC OR WOOD.

ALL POSTS AND NECESSARY HARDWARE SHALL BE PROVIDED BY THE CONTRACTOR.

CONNECT TO EXISTING FENCE ON BOTH SIDES OF GATE. CONSTRUCT GATE AND BRACE PANELS

USING SAME TYPE WIRE AND NUMBER OF STRANDS AS EXISTING FENCE.

THIS WORK IS INCIDENTAL TO PAY ITEM 137(01).

NO SCALE

8'INSTALL TWO 8" POSTS

4" ROUND WOODEN BRACE, TOE-NAIL TOP AND BOTTOM

TYPE 2 OBJECT MARKER ON EACH GATEPOST, ON EACH SIDE OF POST

2-9 GA. STRANDS TWISTED

GALV. STEEL WIRE FOR GUY GROUND LINE

8" POST

42"

6"

12"

TYPE 2 OBJECT MARKER

6" X 12" REFLECTIVE YELLOW

CONSTRUCT CATTLE GUARD CROSSING IN

EXISTING FENCE. WIRE PLACEMENT

HEIGHT AND SPACING SHALL CONFORM TO

EXISTING FENCE CONDITIONS.

8'

5 FT

18"

BACKFILL AROUND 12" X 12" FOOTERS LEVEL

WITH THE TOP OF THE FOOTER A DISTANCE OF 1 FT

AND THEN A 11

2:1 SLOPE TO EXISTING GROUND

H-BRACE DETAIL-PLAN VIEW

NO SCALE

4" ROUND WOODEN BRACE, TOE-NAIL TOP AND BOTTOM

8" POST8' 5 FT

CONSTRUCT CATTLE GUARD CROSSING IN EXISTING FENCE

SEE CATTLE GUARD CROSSING SHEET FOR MORE DETAILS

SIGN DETAILS

NO SCALE

18"

CATTLE

GUARD

WARNING SIGN, BLACK ON YELLOW

TYPE 3 RETROREFLECTIVE

MEETING MUTCD STANDARDS

NOTES:

SUPPLY SIGN, HARDWARE, AND METAL U POSTS FOR INSTALLATION

INSTALL AT LOCATIONS STAKED BY COR

PROVIDE AND INSTALL TWO CATTLE GUARD WARNING SIGNS AND 4 TYPE 2 OBJECT

MARKERS

CATTLE GUARD CROSSING H-BRACE 937-2

SHEET OF

FILENAME:

DRAWN:

DESIGNED:

CHECKED:

DATE:

DATE:

DATE:

REVISIONDATE BY

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REVIEWED: DATE:

DRYPOLE.DWG

6/2015

6/2015

6/2015

J. NOLAND

J. NOLAND

S. VANSICKLE

H-BRACE

CATTLE GUARD CROSSING

TRAIL CONSTRUCTION

DRY POLE ATV

GREAT FALLS, MT

DryPoleDrawings
HNF0616150607

File details come from the government source that posted it. Updated .