AG-0398-S-11-0011.pdf

PDF 863 KB Posted

Attached to
GALLATIN NATIONAL FOREST - Red Cliff Campground Reconstruction
Solicitation number
AG-0398-S-11-0011
Issued by

About this file

AG-0398-S-11-0011 - Full Solicitation - Red Cliff CG Reconstr.

View the file

Other files

File Type Posted
Site Visit Attendance and Notes.pdf PDF
Amendment 1 AG-0398-S-11-0011 - 8-11-11.pdf PDF
ATTACH 5 Sheets2-10.pdf PDF
ATTACH 4 Sheets0-1.pdf PDF
ATTACH 3 Signed Cover Red Cliff.pdf PDF
SF1442 - solic offer award form.pdf PDF
ATTACH 7 Sheets19-35.pdf PDF
ATTACH 6 Sheets11-18.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOL#AG-0398-S-11-0011

Bozeman Ranger District – Gallatin National Forest

Red Cliff Campground Reconstruction

Part I - The Schedule SECTION B - Supplies or Services and Prices/Costs Schedule of Items

TOTAL BASE CONTRACT BID PRICE

TOTAL ADDITIVE 1 BID PRICE

TOTAL ADDITIVE 2 BID PRICE

TOTAL ADDITIVE 3 BID PRICE

TOTAL BASE ADDITIVE 4 BID PRICE

SECTION C - Description/Specifications/Statement of Work Preface 101 - Terms, Format, and Definitions

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid, Award, and Execution of Contract 103 - Scope of Work 104 - Control of Work

104.06 Use of Roads by Contractor

105 - Control of Material

105.02 Material Sources

105.02(a) Government Provided Sources 105.02(a) Government Provided Sources

106 - Acceptance of Work

106.01 Conformity with Contract Requirements

106.07 Delete

107 - Legal Relations and Responsibility To the Public

107.02 Protection and Restoration of Property and Landscape

107.05 Responsibility for Damage Claims

107.08 Sanitation, Health, and Safety

107.09 Legal Relationship of the Parties

107.10 Environmental Protection

107.11 Protection of Forests, Parks, and Public Lands:

108 - Prosecution and Progress 108 Delete

109 - Measurement and Payment 109 Deletions

109.02 Measurement Terms and Definitions

151 – Mobilization

151.01 Description

152 - Contractor Survey and Staking

152.02 General

153 - Contractor Quality Control

153.02 Contractor Quality Control Plan

153.04 Records

155 - Schedules for Construction Contracts 155 Delete

156 - Public Traffic

156.03 Accommodating Traffic During Work

156.04 Maintaining Roadways During Work

156.08 Traffic and Safety Supervisor

156.10

157.03 General

170 - Develop Water Supply and Watering

201 - Clearing and Grubbing

201.01 Description

201.02 Material:

201.06 Disposal

204 - Excavation and Embankment Table 204-2 Construction tolerances

209 - Structure Excavation and Backfill

209.11 Compacting

Table 209-1 Sampling and Testing Requirements

301 - Untreated Aggregate Courses

301.01 Work

301.02 Material

301.03 General

301.04 Mixing and Spreading

301.05 Compacting

301.06 Surface Tolerance

301.08(b) Plasticity Index

301.08 Acceptance

301.09 Measurement

Table 301-1 Field Density Requirements

703 – Aggregate

703.05 Subbase, Base, & Surface Course Aggregate

703.10(e) Flakiness Index 703.10 Table 703-2 Correction

452.211-72 Statement of Work/Specifications. (FEB 1988) 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988) SECTION D - Packaging and Marking SECTION E - Inspection and Acceptance SECTION F - Deliveries or Performance SECTION G - Contract Administration Data

GOVERNMENT-FURNISHED PROPERTY

SECTION H - Special Contract Requirements

PART II--CONTRACT CLAUSES

SECTION I - Contract Clauses

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J - List of Documents, Exhibits, and Other Attachments

PART IV--REPRESENTATIONS AND INSTRUCTIONS

SECTION K - Reps, Certifications, & Other Statements of Offerors or Respondents SECTION L - Instructions, Conditions, and Notices to Offerors or Respondents SECTION M - Evaluation Factors for Award

Part I - The Schedule

SECTION B - Supplies or Services and Prices/Costs Schedule of Items

RED CLIFF CAMPGROUND RECONSTRUCTION

B- 1 - BID SCHEDULE

BASE CONTRACT

ITEM

NO.

DESCRIPTION

METHOD

OF

MEASURE

PAY

UNIT**

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

151(01) Base Contract Mobilization LSQ LS 1

152(01) Construction Survey and Staking LSQ LS 1

201(02) Roadway Clearing & Grubbing LSQ LS 1

204(01) North Loop Road and Spurs Roadway Excavation CQ CY 826

204(02) North Loop Road and Spurs Roadway Excavation (Borrow) CQ CY 548

204(03) North Loop Road and Spurs Roadway Embankment (compaction method B, finishing method A, tolerance A)

CQ CY 1304

204(04) Roadway Topsoil conservation, strip 6” depth & stockpile CQ CY 200

204(05) Entrance Area Road Work Roadway Embankment (compaction method B, finishing method A, tolerance A)

CQ CY 70

303(01) Roadway Reconditioning, North Loop CQ ACRE 0.1

622(01) Base Contract Rental Equipment, Backhoe/Loader, 70 hp AQ HR 8

623(01) Base Contract General Labor AQ HR 32

624(01) Placing Conserved Topsoil, North Loop, 3-inch minimum thickness CQ CY 200

625(01) Seeding – Hydraulic Method, North Loop CQ ACRE 1

02110A(01) Base Contract Demolition, Disposal, Salvage, Stockpile, and Reinstallation LSQ LS 1

DESCRIPTION

METHOD

OF

MEASURE

PAY

UNIT**

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

02713(01) Install 1-1/2-in. PE Water Line, 24 in.

bury AQ LF 2200

02713(02) Campground Water Hydrant & Valve Box AQ EA 2

02713(03) Host Site Hydrant & Valve Box AQ EA 2

02713(04) RV Fill Hydrant & Valve Box AQ EA 1

02713(05) Air/Vacuum Valve Box AQ EA 1

02716(01) Boulders, North Loop AQ EA 14

02743(01) Concrete Sewage Holding Tank (1,500 gallon), complete AQ EA 2

02870(01) Timber Stairway Steps, including gravel, North Loop AQ EA (Step) 46

02870(03) Treated Timber Steps, including gravel, North Loop AQ LF 200

02870(05) Living Space, including gravel, North Loop AQ EA 26

02870(06) New Picnic Table, North Loop AQ EA 26

02870(07) New Fire Ring, North Loop AQ EA 26

02870(10) Bear Box Pad & Gravel Landing, North Loop AQ EA 3

02870(12) Standard Tent Pad, including gravel, North Loop AQ EA 24

02870(13) ADA Tent Pad, including gravel, North Loop AQ EA 2

02870(14) Gravel Path, North Loop AQ LF 50

02870(15) Concrete Vault Toilet Installation, including gravel toilet access path AQ EA 5

02870(16) Double Vault Toilet Concrete Slab AQ EA 1

02870(17) Unit Marker, all campsites AQ EA 63

DESCRIPTION

METHOD

OF

MEASURE

PAY

UNIT**

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

02870(18) New Tire Stop, North Loop AQ EA 26

13122(01) Precast Concrete Utility Building, complete LSQ Lump

Sum 1

13122(02) Precast Concrete Vault Single Toilet AQ EA 4

13122(03) Precast Concrete Vault Double Toilet AQ EA 1

15146(01) Mechanical Work LSQ Lump

16440(01) Electrical Work LSQ Lump

TOTAL BASE CONTRACT BID PRICE $

ADDITIVE 1

DESCRIPTION

METHOD

OF

MEASURE*

PAY

UNIT**

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

151(02) Additive 1 Mobilization LSQ LS 1

301(01) North Loop Surface Course Aggregate, grading D, compaction method A

CQ CY 560

301(02) Entrance Area Road Work Surface Course Aggregate, grading D, compaction method A

CQ CY 15

TOTAL ADDITIVE 1 BID PRICE $

ADDITIVE 2

DESCRIPTION METHOD OF

MEASURE*

PAY

UNIT**

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

151(03) Additive 2 Mobilization LSQ LS 1

02110B(01) Additive 2 Demolition, Disposal, Salvage, Stockpile, and Reinstallation

LSQ LS 1

02870(20) Information Center, including gravel LSQ LS 1

02870(21) Bulletin Board, remove and reinstall existing LSQ LS 1

02870(22) Signs LSQ LS 1

TOTAL ADDITIVE 2 BID PRICE $

ADDITIVE 3

NO.

DESCRIPTION

METHOD

OF

MEASURE*

PAY

UNIT**

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

151(04) Additive 3 Mobilization LSQ LS 1

204(06)

Central Area & South Loop Spur and Campsite Modification Roadway Embankment (compaction method B, finishing method A, tolerance A)

CQ CY 200

204(07) Central Area & South Loop Roadway Excavation (Borrow from North Loop) CQ CY 200

301(02)

Central Area & South Loop Spur and Campsite Modification Surface Course Aggregate, grading D, compaction method A

CQ CY 50

622(02) Additive 3 Rental Equipment, Backhoe/Loader, 70 hp AQ HR 40

623(02) Additive 3 General Labor AQ HR 40

02110C(01) Additive 3 Demolition, Disposal, Salvage, Stockpile, and Reinstallation LSQ LS 1

02716(02) Boulders, Central Area and South Loop AQ EA 6

02870(02) Timber Stairway Steps, including gravel, Central Area and South Loop AQ EA

(Step) 40

02870(04) Treated Timber Steps, including gravel, Central Area and South Loop AQ LF 24

02870(08) New Fire Ring with Pad, including gravel, Central Area and South Loop AQ EA 35

02870(11) Bear Box Pad & Gravel Landing, Central Area and South Loop AQ EA 3

02870(19) New Tire Stop, Central Area and South Loop AQ EA 17

02870(23) Campsite Gravel, installed where directed by the C.O., Central Area and South Loop

AQ CY 20

TOTAL ADDITIVE 3 BID PRICE $

ADDITIVE 4

NO.

DESCRIPTION

METHOD

OF

MEASURE*

PAY

UNIT**

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

151(05) Additive 4 Mobilization LSQ LS 1

02110D(01) Additive 4 Demolition, Disposal, Salvage, Stockpile, and Reinstallation

LSQ LS 1

02870(09) New Fire Ring with Pad, including gravel, Picnic Area AQ EA 4

TOTAL BASE ADDITIVE 4 BID PRICE $

TOTAL BID PRICE ALL BASE ITEMS: $______________

TOTAL BID ALL ADDITIVE ITEMS: $______________

TOTAL BASE BID + ADDITIVE ITEM 1: $______________

TOTAL BASE BID + ADDITIVE ITEM 1 & 2: $______________

TOTAL BASE BID + ADDITIVE ITEM 1, 2 & 3: $______________

TOTAL BID PRICE ALL BASE + ALL ADDITIVE ITEMS: $______________

NOTE 1: Order of priority for additive items = Additive 1 is 1st, Additive 2 is 2nd, Additive 3 is 3rd, Additive 4 is 4th.

Please see section I for provision #452.236-70 ADDITIVE OR DEDUCTIVE ITEMS.

NOTE 2: Abbreviations used in Bid Schedule

* LSQ = Lump Sum Quantity ** LS = Lump Sum

* CQ = Contract Quantity ** CY = Cubic Yard

* AQ = Actual Quantity ** SY = Square Yard

** SF = Square Foot ** LF = Linear Foot

SPECIAL NOTES:

a. The bidder must bid on all items. Round to the nearest cent.

b. In the event of an error in extending the bid prices, unit prices will govern unless otherwise determined by the Contracting Officer in accordance with applicable regulations.

c. Offers for quantities less than those listed in the numbered items may be rejected.

d. Payment for bond premiums in accordance with Clause 52.232-5. Payments under Fixed-Price

Construction Contracts shall not be in addition to the contract price but can be included under Mobilization.

e. The pay items in the BID SCHEDULE may have suffixes that do not appear on the pay items in the specifications. They pertain only to sizes, classes, and/or types indicated in the item "Descriptions,” and are used by the Government for computer tabulation of bid schedules.

SECTION C - Description/Specifications/Statement of Work

C-1 - PROJECT DESCRIPTION AND LOCATION

(a) - Scope of Contract. This project involves renovating the Red Cliff Campground and associated picnic site on the Bozeman Ranger District, Gallatin National Forest. Work includes road realignments and surfacing, reconfiguration of camp spurs, campsite rehabilitation with new and salvaged furniture, installation of a new water system, well development, concrete pumphouse installation and plumbing, concrete vault toilet installation, and other miscellaneous demolition and construction work. Work includes furnishing all labor, materials, equipment, supervision, transportation, and incidentals necessary to perform work as shown and specified herein.

(b) - Project Location. Red Cliff Campground is located on the east side of Highway 191 approximately 6 miles south of Big Sky, Montana.

(c) – Prebid Tour. There will be a pre-bid tour meeting at the Red Cliff picnic area on July 28, 2011 at 10:00 AM. Potential bidders are encouraged to participate in the pre-bid tour or to visit the project site on their own. Red Cliff Campground is located approximately 48 miles south of Bozeman, MT on US 191. Parties with questions may contact Dale White, telephone (406) 587-6752.

C-2 - GENERAL SPECIFICATIONS

(a) - Existing Utilities. Within the campground and picnic site, known underground utilities include water, electrical, and telephone lines. It is unknown what other underground utilities may be located within the Highway 191 corridor.

It is solely the responsibility of the Contractor to locate and avoid damage to existing utilities.

The Contractor shall contact Montana One Call at (800) 424-5555 and pay any fees required for locating and marking utility-owned and government-owned underground electrical lines, telephone lines, plastic water lines with tracer conductors, and fiber optic lines, and any other underground utilities in the construction area a minimum of 2 business days prior to any excavation, trenching, or other ground disturbing activity at the site.

NOTE: ELM Locating & Utility Services of Missoula, MT is the current contractor for Montana One Call. They can be contacted for additional fees for private locates at (406) 728-9343.

(b) - Pollution and Erosion Control. During all operations under this contract, the Contractor shall exercise reasonable measures to prevent or minimize soil erosion and pollution of water and other resources. All refuse, including garbage, rubbish, and solid or liquid wastes, from the Contractor's operations, including camps, parking areas, and equipment maintenance areas shall be stored, collected, and disposed of in a sanitary and nuisance-free manner. Refuse shall be disposed of in State-approved dumps as approved by the CO.

During all of the work, the Contractor shall make every reasonable effort to direct surface runoff water to stabilized waterways and to keep the drainage systems functioning effectively to minimize soil erosion and water pollution.

(c) - Existing Facilities. In addition to the requirements of the Use of Premises Clause, AGAR 452.236-70, all existing facilities structures damaged by the Contractor shall be replaced or repaired by the Contractor at no additional cost to the Government. This includes any facilities inside or outside the project limits, including along any access routes.

Do not cut, trim, or damage vegetation except with specific Contracting Officers (CO) approval.

Limit all construction activities and ground disturbance, including storage and stockpiling, to areas designated by the CO.

(d) - Noxious Weed Control. In order to prevent the potential spread of noxious weeds the

Contractor shall clean equipment in accordance with Section 151.

(e) – Submittals. Submit two copies to the CO for approval on all construction materials and items required herein. Literature shall be marked or otherwise designated to indicate the exact model, size, etc., the Contractor proposes to use. Information shall be adequate to determine compliance with the specifications without additional research by the CO. One copy of approved submittals will be returned to Contractor. Submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. The Contractor shall allow 5 calendar days for processing of submittals by the Government.

(f) – Timing of Work and Public use of facilities. Construction shall proceed and be completed in accordance with time limitations listed in SECTION F--DELIVERIES OR PERFORMANCE.

The Contractor will be allowed to close the North Loop to public access during the work period listed for that area. Close the North Loop using approved barricades located where directed by the C.O. The Contractor is encouraged to schedule work in the North Loop so as to minimize closure of that area. Notify the C.O. at least two weeks in advance of enacting the North Loop closure.

The entire campground will be closed to public use during the period September 6, 2011 through May 24, 2012. During this period the Contractor will have access to the entire campground to proceed with the work.

(g) – Public Safety and Traffic Control. Safety and traffic control on the project site shall be the sole responsibility of the Contractor. The Contractor shall maintain warning signs and barricades to safeguard the public. Adequate signs, barricades, cones, and other methods or devices shall be utilized in accordance with the MUTCD.

(h) – Permits. The Contractor shall perform all necessary coordination with the utility company, secure all necessary permits, and pay all associated fees for electrical work per Section 16440.

(i) - Construction Staking. The Contractor will be responsible for staking of the new segments of the North Loop Road. All other staking will be performed by the Government. The Contractor will make every reasonable attempt to protect the staking during their activities and shall replace any damaged stakes at their expense.

(j)– Storage and Stockpiling of Equipment and Materials. Storage and stockpiling shall take place only within areas approved by the CO.

(k)– Maintenance of Clean Worksite Conditions. Maintain the project work area in a clean and orderly condition throughout the progress of work under this contract.

(l)– Work Done by Others. It is not anticipated that work will be done by other contractors on the site during the same time period as this contract.

Should work by other contractors occur, the Contractor shall make reasonable accommodation for this other work. The Government will notify the Contractor in advance when this work is planned to occur.

(m)– Use of Government Facilities while Conducting Work.

1. Sanitary Facilities: Campground toilets may be used by the Contractor.

2. Electrical Power: The contractor shall furnish his own electrical power.

3. Potable Water: The existing potable water system to be demolished on under this contract is the only potable water system at the site. With C.O. approval, the Contractor may use the system as a water source while construction is underway provided the Contractor’s actions do not interfere with public use of the system. The C.O. may revoke permission to use the existing water system at any time should he feel that the Contractor’s actions interfere with public water use.

4. Camping: No camping on Forest Service lands except by written approval of the Bozeman

District Ranger.

(n)– Asbestos Containing Materials. It is assumed that the vent pipes in the existing wooden toilets to be demolished are asbestos containing material (asbestos cement). The pipe is in good condition. The contractor shall remove, transport, and dispose of the pipe without breaking, abrading, cutting, or in any way damaging it and shall dispose of it in a legal manner at a State licensed landfill that accepts non-regulated asbestos containing materials. Upon removal and before storage or transport, the pipe shall be double-wrapped in 6 mil polyethylene material.

C-4 - STANDARD SPECIFICATIONS

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03, U.S. Customary Units) are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant Contract.

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03) can be downloaded at the following website: www.wfl.fha.dot.gov/design/specs/fp03.htm

C-5 - SPECIAL PROJECT SPECIFICATIONS

The following Special Project Specifications are applicable to this contract and are physically included in this section:

Number Description

- Preface

101 Terms, Format, and Definitions 102 Bid, Award, an Execution of Contract 103 Scope of Work 104 Control of Work 105 Control of Material 106 Acceptance of Work 107 Legal Relations and Responsibility to the Public 108 Prosecution and Progress 109 Measurement and Payment 151 Mobilization 152 Contractor Survey and Staking 153 Contractor Quality Control 155 Schedules for Construction Contracts 156 Public Traffic 157 Soil Erosion Control 170 Develop Water Supply and Watering 201 Clearing and Grubbing 204 Excavation and Embankment 209 Structure Excavation and Backfill 301 Untreated Aggregate Courses 703 Aggregate

02110A Base Contract Demolition, Disposal , Salvage, Stockpile and Reinstallation

02110B Additive 2 Demolition, Disposal , Salvage, Stockpile and Reinstallation

02110C Additive 3 Demolition, Disposal , Salvage, Stockpile and Reinstallation

02110D Additive 4 Demolition, Disposal , Salvage, Stockpile and

Reinstallation 02221 Trenching, Backfilling, and Compacting for Underground

Utilities 02713 Water Lines and Appurtenances 02716 Boulders 02743 Precast Concrete Sewage Holding Tank and Host Site Sewer

Connection 02870 Miscellaneous Campground Items 13122 Precast Concrete Buildings 15146 Water System Mechanical Work 16440 Electrical Work

Preface Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions

101.00_nat__us08_12_2004

101.01_nat__us02_17_2005

101.01 Meaning of Terms.

Add the following:

Delete all references in FP-03 to Transportation Acquisition Regulations (TAR).

101.03_nat__us02_17_2005

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI Symbols:

mp Milepost ppm Part Per Million

101.04_nat__us02_22_2005

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The SCHEDULE OF ITEMS.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or http://www.nist.gov/�

(2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity-- “Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction.

Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

R ig ht of

W ay

R oa ds id e R oa ds id e

C le ar in g W id th

R oa dw ay

C le ar in g Li m it

X Y

G ro un d

Li ne

Tr av el ed

W ay C L

B er m S ur fa ce C ou rs e B as e

C ou rs e

Fi ll

S lo pe

B ac k S lo pe

D ra in ag e D itc h

G ro un d

Li ne

S ub gr ad e

R oa d B ed

S ha pe s an d di m en si on s w ill va ry to fi t l oc al c on di tio ns

S ee d ra w in gs fo r t yp ic al s ec tio ns

X a nd Y d en ot e cl ea rin g ou ts id e of ro ad w ay

N ot e:

Right - of - Way Line

Right - of - Way Line

Clearing Limit

Shoulder

Shoulder

102 - Bid, Award, and Execution of Contract 102.00_nat__us02_16_2005

Delete Section 102 in its entirety.

103 - Scope of Work 103.00_nat__us02_16_2005

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work 104.00_nat__us02_17_2005

Delete sections 104.01, 104.02, and 104.04.

104.06_nat__us02_17_2005 Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.02_nat__us05_11_2004

105.02 Material Sources.

105.02(a) Government Provided Sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. When required, re-establish vegetation in disturbed areas according to section 625.

105.02_nat__us02_17_2005 105.02(a) Government Provided Sources.

(a) Government-provided sources. Add the following:

Government-provided sources for this project are identified as follows:

(1) Government-provided mandatory sources.

GOVERNMENT PROVIDED MATERIALS OR SOURCES INCLUDE THE FOLLOWING:

A) EXISTING CAMPGROUND ITEMS SALVAGED AS DIRECTED IN THE

CONTRACT

B) SEED

(2) Government-provided optional sources.

NONE

106 - Acceptance of Work

106.01_nat__us03_29_2005

106.01 Conformity with Contract Requirements.

Delete Subsection 106.01 and substitute the following:

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request.

Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

(1) Sampling method;

(2) Number of samples;

(3) Sample transport;

(4) Test procedures;

(5) Testing laboratories;

(6) Reporting;

(7) Estimated time and costs; and

(8) Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory.

Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute. The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

(1) Have the work accepted at a reduced price; or

(2) Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.01_nat__us03_29_2005

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility To the Public

107.02_nat__us02_17_2005

107.02 Protection and Restoration of Property and Landscape.

Do not work or allow materials to enter within the wetted perimeter of the Gallatin River.

107.05_nat__us05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat__us02_23_2005

107.06 Contractor’s Responsibility for Work.

Delete the following:

“except as provided in Subsection 106.07”.

107.08_nat__us03_29_2005

107.08 Sanitation, Health, and Safety

Delete the entire subsection.

107.09_nat__us05_11_2004

107.09 Legal Relationship of the Parties.

Delete the entire subsection:

107.10_nat__us02_23_2005

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

• Exact time and location of spill including a description of the area involved.

• Containment procedures.

• Summary of any communications contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

107.10_05__us01_26_2005

Meet the requirements chapters 10, 11, and 12.2 in their entirety of “Water Quality Management for National Forest System Lands in California Best Management Practices” dated September 2000

107.11_nat__us02_17_2005

107.11 Protection of Forests, Parks, and Public Lands:

Comply with all Montana Department of Natural Resources & Conservation (DNRC) regulations, including Forest Fire Regulations established by the DNRC Division of Forestry.

108 - Prosecution and Progress

108.00_nat__us02_16_2005 108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment

109.00_nat__us02_17_2005

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat__us02_23_2005

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

109.02 Measurement Terms and Definitions.

Add the following definition:

(p) Actual Quantities (AQ). These quantities are determined from measurements of completed work.

151 – Mobilization

151.01_0105__us02_23_2005

151.01 Description

This work includes washing and treating construction equipment and vehicles necessary for equipment transport to remove seeds, plants, and plant fragments before the equipment is used on Forest Service lands.

Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. Only equipment inspected by the Forest Service will be allowed to operate within the project area. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in. This requirement does not apply to cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas off the National Forest.

Equipment will be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment, components or the need for specialized inspection tools is not required.

Notify the CO in writing at least 24 hours before moving any construction equipment onto the national forest. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.

152 - Contractor Survey and Staking

Description

152.01(c) Material.

Use required stake dimensions and materials. Pre-paint the top 2 inches of all stakes and lath, or mark them with plastic flagging. Use designated colors for paint or flagging. Mark all stakes with a stake pencil that leaves a legible imprint, or with waterproof ink.

Do not use aerosol spray paints.

Use moisture-resistant paper for survey notes. Keep notes in books with covers that will protect the contents and retain the pages in numerical sequence.

Construction Requirements

152.02 General.

Delete the first paragraph and insert the following:

The Contractor shall stake out the new road segments base on the information contained in the plans and in accordance with this Section. The C.O. may make minor adjustments to the staked road centerline location as necessary to avoid the removal of mature trees.

All other staking will be performed by the Government. The Contractor will make every reasonable attempt to protect the staking during their activities and shall replace any damaged stakes at their expense.

Delete second sentence in second paragraph and replace with the following:

Reestablish missing reference, control lines, or stakes as necessary to control subsequent construction staking operations

152.03 Survey and Staking Requirements.

(b) Roadway cross-sections.

Replace the first two sentences with the following:

Take roadway cross-sections normal to centerline. When the centerline curve radius is less than or equal to 200 feet, take cross-sections at a maximum centerline spacing of 25 feet. When the centerline curve radius is greater that 200 feet take cross-sections at a maximum centerline spacing of 80 feet.

c) Slope Stakes & References:

Replace section with the following:

Slope stakes and references. When required, locate slope stakes on designated portions of the road.

Locate the slope stake catch points and use them to establish clearing limits and slope stake references.

Mark slope stakes with the station, the amount of cut or fill, the horizontal distance to centerline, and the slope ratios.

Place slope reference stakes at least 10 feet outside the clearing limit and mark with the offset distance to the slope stake. Place sight stakes when required.

Prior to clearing and grubbing operations, move the slope stake outside the clearing limit to the slope reference stake. After clearing and grubbing and before excavation, reset the slope stakes in their original position.

Use the following method to establish the slope stake catchpoint:

Catchpoint Measurement Method. Determine the location of slope stake catchpoints by measuring the catchpoint distances shown in the plans or other Government-provided data.

(d) Clearing and grubbing limits.

Add the following:

Establish clearing limits on each side of the location line by measuring the required horizontal or slope distances shown in the stake notes. Mark the clearing limits with flagging or tags on trees to be left standing, or on lath. Make markings intervisible, and no more than 90 feet apart.

After establishing clearing limits, move the location line stake outside the clearing limits for station identification purposes, and mark it with horizontal distance to location line

(e) Centerline reestablishment.

Replace with the following:

Reestablish centerline from instrument control points. The maximum spacing between centerline points is 25 feet when the centerline curve radius is less than or equal to 200 feet. When the centerline curve radius is greater than 200 feet, the maximum distance between centerline points is 80 feet.

(g) Culverts.

Replace subsection with the following:

Set culvert reference stakes at all culvert locations. Set a culvert reference stake on the centerline of the culvert 10 feet from each end or beyond the clearing limit, whichever is greater. Record the following on culvert reference stakes:

(1) Diameter, actual field measured length, and type of culvert.

(2) The vertical and horizontal distance from the reference stake to the invert at the ends of the culvert.

(3) Station of actual point where culvert intersects centerline.

When required, stake headwall for culverts by setting a hub with a guard stake on each side of the culvert on line with the face of the headwall. Perform this work after clearing is completed.

152.03 (l) Miscellaneous Survey and Staking.

Add the following:

(11) Cattleguards

(12) Drain Dips

(13) Erosion Control Measures

153 - Contractor Quality Control

153.02_nat__us02_17_2005

153.02 Contractor Quality Control Plan.

Add the following:

Submit written proposals for approval of alternate AASHTO or State approved test methods.

Alternate methods may be allowed based on documented equivalence to the specified method.

153.04_nat__us03_30_2005

153.04 Records.

Delete all but the first sentence

155 - Schedules for Construction Contracts

155.00_nat__us05_11_2004 155 Delete.

Delete Section 155 in its entirety.

156 - Public Traffic

156.03_nat__us02_24_2005

156.03 Accommodating Traffic During Work.

Delete the following from the last paragraph:

according to Subsection 106.07(b)

156.04_nat__us02_24_2005

156.04 Maintaining Roadways During Work.

(a) Add the following:

Do not construct detours outside of the clearing limits or use alternate route detours without the approval of the CO.

156.08_nat__us02_24_2005

156.08 Traffic and Safety Supervisor.

Delete this subsection in its entirety.

156.10

Delete the existing text and add the following:

Do not measure Public Traffic for payment. Compensation is made as an indirect payment.

157 - Soil Erosion Control

157.03_nat__us02_24_2005

157.03 General

Delete the entire subsection and replace with the following:

Prior to the start of construction, submit a written plan that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented.

Do not modify the type, size, or location of any control. An alternate erosion control plan with all necessary permits may be submitted 30 days before intended use.

Incorporate all permanent erosion control features into the project at the earliest practicable time, as outlined in the approved plan.

When erosion control measures are not functioning as intended, immediately take corrective action.

170 - Develop Water Supply and Watering

170.01 This work consists of developing an acceptable water supply, furnishing, hauling, and applying water.

Materials

170.02 Conform to the following subsection.

Water 725.01.

170.03 Development of Supply & Access. Develop water supplies and access to the water supplies as required. Use designated water sources or other approved water sources. Before using non-designated water sources, obtain all necessary permissions, water rights, and permits.

170.04 Equipment. Provide mobile watering equipment with watertight tanks of known capacity.

Provide for positive control of water application from the driver’s position.

170.05 Application. Apply water uniformly without ponding or washing.

170.06 Acceptance. Developing water supplies and watering will be evaluated under Subsections

106.02 and 106.04.

Measurement

170.07 Do not measure Develop Water Supply and Watering for payment.

201 - Clearing and Grubbing

201.01_nat__us02_18_2005

201.01 Description

Replace with the following

This work consists of clearing and grubbing within clearing limits and other designated areas.

201.02 Material:

Delete Tree wound dressing material reference.

201.03 General.

Delete the last sentence.

201.04_nat__us02_22_2005 Delete paragraph (c) and replace with the following:

(c) In areas outside the excavation, embankment, and slope rounding limits, cut stumps to within 12 inches or one-third of the stump diameter of the ground, whichever is higher, measured on the side adjacent to the highest ground. For timber sales, stump heights will meet the requirements of the Timber Sale contract.

201.04 Clearing.

Delete subsection (d) and replace with the following:

(d) Do not cut vegetation less than 3 feet tall and less than 3 inches in diameter, that is within the clearing limits but beyond the roadway and not in a decking area, and that does not interfere with sight distance along the road.

(e) Trim branches of remaining trees or shrubs to give a clear height of 14 feet above the roadbed unless otherwise indicated. Trim tree limbs as near flush with the trunk as practicable.

(f) Remove brush from log decks. Deck logs so that logs are piled parallel to one another;

can be removed by standard log loading equipment; will not damage standing trees; will not interfere with drainage, and will not roll. Keep logs in log decks free of brush and soil.

201.06_0105__us02_17_2005

201.06 Disposal.

Delete the first 2 sentences of this subsection and substitute the following:

All merchantable timber within the clearing limits becomes the property of the Contractor and shall be removed from Forest Service land. Non-mechantable timber shall be limbed, cut into 18-24” lengths, and stacked where directed by the C.O.

Merchantable timber removed from Forest Service land is subject to the Forest Resources Conservation and Shortage Relief Act of 1990 (PL 101-382; 104 Stat. 714-726; 16 USC 620 et. seq.).

Do not export timber from the United States or use in direct or indirect substitution for unprocessed timber exported from the United States, from private lands by Purchaser, or any person as defined in Section 493 (16 USC 620e) of the Act.

Unless Forest Service determines that circumstances warrant a written waiver or adjustment, (1) hammer brand all products on both ends with an assigned contract brand before removal from the project site, (2) hammer brand each product exempt from domestic processing on both ends with an exempt brand registered for use on exempt logs from National Forest, and (3) paint all domestic processing products on both ends with 2 inch circle of yellow paint according to Interim Specification 2400-400 (available upon request). Paint or brand products before removing them from project site unless approved by the CO. Brands and yellow paint must remain on logs until they are processed.

Contractor may remanufacture logs into different log lengths as approved. Repaint or rebrand all remanufactured pieces. Pay all surveillance costs except that Forest Service may waive such payment if such costs are minor and part of normal remanufacturing operations.

Spread slash over the ground surface in areas within the campground designated by the C.O.

204 - Excavation and Embankment

Delete Section 204 text and tables and replace with the following:

204.01 This work consists of excavating material and constructing embankments. This includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material.

204.02 Definitions.

(a) Excavation. Excavation consists of the following:

(1) Roadway excavation. All material excavated from within the right-of-way or easement areas, except subexcavation covered in (2) below and structure excavation covered in Sections 208 and 209. Roadway excavation includes all material encountered regardless of its nature or characteristics.

(2) Subexcavation. Material excavated from below subgrade elevation in cut sections or from below the original groundline in embankment sections. Subexcavation does not include the work required by Subsections 204.05, 204.06(b), and 204.06(c).

(3) Borrow excavation. Material used for embankment construction that is obtained from outside the roadway prism. Borrow excavation includes unclassified borrow, select borrow, and select topping.

(b) Embankment construction. Embankment construction consists of placing and compacting roadway or borrow excavation. This work includes:

(1) Preparing foundation for embankment;

(2) Constructing roadway embankments;

(3) Benching for side-hill embankments;

(4) Constructing dikes, ramps, mounds, and berms; and

(5) Backfilling subexcavated areas, holes, pits, and other depressions.

(c) Conserved topsoil. Excavated material conserved from the roadway excavation and embankment foundation areas that is suitable for growth of grass, cover crops, or native vegetation.

(d) Waste. Excess and unsuitable roadway excavation and subexcavation that cannot be used.

Material

204.03 Conform to the following Subsections:

Backfill material 704.03 Select borrow 704.07 Select topping 704.08 Topping 704.05 Unclassified borrow 704.06 Water 725.01

204.04 Preparation for Roadway Excavation and Embankment Construction. Clear the area of vegetation and obstructions according to Sections 201 and 203.

204.05 Reserved..

204.06 Roadway Excavation. Excavate as follows:

(a) General. Do not disturb material and vegetation outside the construction limits.

Incorporate only suitable material into embankments. Replace any shortage of suitable material caused by premature disposal of roadway excavation. Dispose of unsuitable or excess excavation material according to Subsection 204.14.

At the end of each day's operations, shape to drain and compact the work area to a uniform cross-section. Eliminate all ruts and low spots that could hold water.

(b) Rock cuts. Blast rock according to Section 205. Excavate rock cuts to 6 inches below subgrade within the roadbed limits. Backfill to subgrade with topping or with other suitable material. Compact the material according to Subsection 204.11 When blasting rock, use blasting methods according to Subsection 205.08.

(c) Earth cuts. Scarify earth cuts to 6 inches below subgrade within the roadbed limits. Compact the scarified material according to Subsection 204.11.

(d) Pioneer Roads. Road pioneering, slash disposal, and grubbing of stumps may proceed concurrently with excavation. Conduct excavation and placement operations so material to be treated under Section 201 will not be incorporated into the roadway unless specified in the slash treatment method. Maintain drainage during pioneering operations.

Remove snow and ice in advance of the work and deposit beyond the roadway limits in a manner that will not waste material or generate sediment. Do not incorporate snow and ice into embankments. Place snow or ice in a manner to prevent resource damage.

204.07 Subexcavation. Excavate material to the limits designated by the CO. Take cross-sections according to Section 152. Prevent unsuitable material from becoming mixed with the backfill.

Dispose of unsuitable material according to Subsection 204.14. Backfill the subexcavation with topping, or other suitable material. Compact the material according to Subsection 204.11.

204.08 Borrow Excavation. Use all suitable roadway excavation in embankment construction. Do not use borrow excavation when it results in excess roadway excavation. Deduct excess borrow excavation from the appropriate borrow excavation quantity.

Obtain borrow source acceptance according to Subsection 105.02. Develop and restore borrow sources according to Subsection 105.03. Do not excavate beyond the established limits. When applicable, shape the borrow source to permit accurate measurements when excavation is complete.

204.09 Preparing Foundation for Embankment Construction. Prepare foundation for embankment construction as follows:

(a) Embankment less than 4 feet high over natural ground. When designated, remove topsoil and break up the ground surface to a minimum depth of 6 inches by plowing or scarifying.