TO_Request_D6BldgStain.doc

DOC document 3 MB Posted

Attached to
Idaho Panhandle NF, Facility Mtc and Light Construction Federal contract opportunity
Solicitation number
AG-02RC-S-15-0025
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

Task Order Request for Pricing

View the file

Other files for this federal contract opportunity

Other files attached to Idaho Panhandle NF, Facility Mtc and Light Construction, newest first.
File Type Posted
SF30Amend1_S150025_sol.doc DOC document
TO1_Amendment1.pdf PDF
WorkersCompForm.docx DOCX document
FoodStorage2011Signed.pdf PDF
PAST_PERFORMANCE_SURVEY.docx DOCX document
IPNF_sol.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sandpoint Ranger Station Log Staining xREQUEST FOR QUOTATION

PAGE OF PAGES

(THIS IS NOT AN ORDER)

1
15
1. REQUEST NO.
2. DATE ISSUED
3. REQUISITION/PURCHASE REQUEST NO.
4. CERT. FOR NAT.DEF.
RATING
TO-1
03/16/2015

UNDER BDSA REG. 2

AND/OR DMS REG. 1

5a. ISSUED BY
6. DELIVER BY (Date)
Idaho Panhandle National Forests, 3815 Schreiber Way, Coeur d Alene, ID, 83815
45 calendar days)
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
7. DELIVERY
FORMCHECKBOX

FOB DESTINATION

NAME
TELEPHONE NUMBER
See Sec. F
FORMCHECKBOX

OTHER (See Schedule)

AREA CODE
NUMBER
9. DESTINATION

Rita J Loper, C.O.

Mike Shoup. Technical (208)

(208) 765-7497 765-7204

a. NAME OF CONSIGNEE

8. TO:
Sandpoint Ranger District
a. NAME
b. COMPANY
b. STREET ADDRESS

1602 Ontario Street

c. STREET ADDRESS
c. CITY

Sandpoint

d. CITY
e. STATE
f. ZIP CODE
d. STATE
e. ZIP CODE
ID
83864
10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE CLOSE OF BUSINESS
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A. This request does not commit the Government to pay any costs incurred in the preparation of the

4/15/2015

4:00 p.m. (pacific) submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(a)
(b)
(c)
(d)
(e)
(f)

Request for Task Order Price Sandpoint Ranger Station Log Staining

Price Range: under $25,000
1
Log Staining
1
LS
xx
$_________

Return completed SF18 with price breakdown in accordance with Section C-7 of master contract, and Idendify Key Personnel. See C-2 of Task Order for scheduled organized Site Visit.

ALL Terms and Conditions of the master Facility Maintenance and Light Construction contract apply.
a. 10 CALENDAR DAYS (%)
b. 20 CALENDAR DAYS (%)
c. 30 CALENDAR DAYS (%)
d. CALENDAR DAYS

12. DISCOUNT FOR PROMPT PAYMENT

NUMBER
PERCENTAGE
NOTE: Additional provisions and representations
FORMCHECKBOX
are
FORMCHECKBOX

are not attached.

13. NAME AND ADDRESS OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO
15. DATE OF
a. NAME OF QUOTER
SIGN QUOTATION
QUOTATION
b. STREET ADDRESS
16. SIGNER
a. NAME (Type or print)
b. TELEPHONE

c. COUNTY

AREA CODE

d. CITY
e. STATE
f. ZIP CODE
c. TITLE (Type or Print)
NUMBER

NSN 7540-01-152-8084

Previous edition not usable

18-121
STANDARD FORM 18 (Rev. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 Scope of Work The exterior logs and wood siding for the Sandpoint Ranger Station office require staining as part of their regular maintenance.

· Wash all exterior logs and tongue and groove planks.

· Apply two coats of stain per the manufacturer’s written procedures.

· See attached Supplemental Specifications in Section J.

(a) - Project Location.

Sandpoint Ranger Station

1602 Ontario Street

Sandpoint, ID 83864

C.2 FAR 52.236-27 Site Visit (Construction) (FEB 1995) Alt 1 (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for April 7, 2015 at 10:00 a.m. (pacific). Meet at the Sadnpoint Ranger Station, 1602 Ontario Street, Sandpoint, ID 83864

Please rsvp via email to Mike Shoup at mshoup@fs.fed.us, if you plan to attend.

C.3 Restrictions.

1. All work shall be coordinated with the Contracting Officer’s Representative 14 days prior to the start work date.

2. For scope of work items that require clarification, the contractor shall submit written Requests for Information (RFI), allowing seven working days for the government’s review.

3. Project material submittals shall be submitted for approval prior to ordering. Allow seven working days for government review.

4. Written project schedules shall be submitted at the pre work meeting and updated weekly.

SECTION F--DELIVERIES OR PERFORMANCE

F.1 AGAR 452.211-5 Period of Performance. (FEB 1988)

The period of performance of this Task Order is for a period of 45 calendar days, with estimated start date May 2015.

SECTION G–CONTRACT ADMINISTRATION DATA

G-1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of task order award. The conference will be held at a location to be determined as agreed upon.

SECTION H–SPECIAL CONTRACT REQUIREMENTS

AGAR 452.237-74 Key Personnel (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel:

On Site Representative/Project Superintendent

(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(b) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

The following listed attachments are a part of this solicitation and any resultant contract:

1. Wage Determinationt - General Decision Number: ID. ID150010, dated 1/2/2015

2. Supplemental Project Specifications with photos Sandpoint Ranger Station Log Staining

Supplemental Project Specifications

· Clean all wood surfaces using Log Wash product (or approved equal); remove pitch pockets and stains; resurface as required to maintain existing hand-hewn look of log surfaces

· Mask off adjacent areas to prevent damage from overspray

· Mask off lighting, conduit and any other mechanical surfaces/devices to prevent damage from overspray

· Restain Exterior Log Surfaces (all logs 8” average diameter unless otherwise specified; Doug Fir species). Apply two coats of stain (WoodTech Semi-Transparent Stain “True Walnut” color). Log wash and stain shall be applied per manufacturer’s instructions.

4 Each Side Entrances (No Tongue and Groove)

· 8 total columns x 9’ = 72 linear ft

· 36 total purlins x 9’ = 324 linear ft

· Truss members 19’ x 4 each = 76 linear ft

· Total linear feet for all four side entrances = 472 linear ft

Courtyard

· 5 total columns x 9’ = 45 linear ft

· 15 total joists x 28’ = 420 linear ft

· Truss = 154 linear ft

· Total linear feet for Courtyard = 619 linear ft

· Total Tongue and Groove for Courtyard= 800 sq ft

Front Entrance

· Side Columns = 80 linear ft

· Side Joists and Trusses = 410 linear ft

· Truss #1 = 100 linear ft

· Truss #2 = 128 linear ft

· Total linear feet for Front Entrance = 718 linear ft

· Tongue and Groove for Front Entrance = 1,472 sq ft

Corner Posts

· 5 each x 11’ = 55 linear ft

· 2 each x 7’ = 14 linear ft

· Total linear feet for Corner Posts = 69 linear ft

Pavilion

· 16 total columns x 8’ = 128 linear ft

· Rafters, Joists and purlins = 260 linear ft (Mixture of 8”, 6” and 4” dia logs)

· Beams = 148 linear ft (two 12” dia logs x 21’; remainder 8” dia)

· Total linear feet for Pavilion = 544 linear feet

· Tongue and Groove for Pavilion = 660 sq ft

Clean and restain two Picnic Tables located under Courtyard (2x4/2x6 construction; 7’ x 5’ 6”)

All quantities are for information only. The contractor shall be responsible for verifying all measurements.

Project Total Log Linear Feet = 2,422 linear ft

Project Total Tongue and Groove = 2,932 sq ft

Typical Side Entrance Design (no Tongue and Groove)

Close up of Typical Side Entrance

Courtyard and two picnic tables

Typical Corner Post (5 Total)

Front Entrance

Typical Front Entrance Side

Pavilion

General Decision Number: ID150010 01/02/2015 ID10

Superseded General Decision Number: ID20140010

State: Idaho

Construction Type: Building

County: Bonner County in Idaho.

Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the

EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The

EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/02/2015

BOIL0242-001 01/01/2013

Rates Fringes

BOILERMAKER......................$ 34.28 26.60

BRID0003-001 12/01/2014

Rates Fringes

BRICKLAYER.......................$ 23.60 13.81

CARP0001-041 06/01/2014

Rates Fringes

CARPENTER (Form Work Only).......$ 27.06 13.39

ELEC0073-006 07/01/2014

Rates Fringes

ELECTRICIAN......................$ 30.00 16.25

ELEV0019-006 01/01/2014

Rates Fringes

ELEVATOR MECHANIC................$ 47.76 27.085

IRON0014-003 07/01/2013

Rates Fringes

IRONWORKER, REINFORCING AND

STRUCTURAL.......................$ 31.60 21.35

LABO0238-011 06/01/2014

Rates Fringes

LABORER (Common or General)......$ 24.35 10.95

Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00

BASE POINTS: Spokane, Pasco, Lewiston

Zone 1: 0-45 radius miles from the main post office.

Zone 2: 45 radius miles and over from the main post office

LABO0238-012 06/01/2014

Rates Fringes

LABORER (MASON TENDER

(Cement/Concrete, Brick (Hod))...$ 24.35 10.95

PLUM0044-005 06/01/2013

Rates Fringes

PLUMBER

Zone 1......................$ 35.81 17.34

SHEE0055-002 08/01/2011

Rates Fringes

SHEET METAL WORKER (Includes

HVAC Duct Installation)..........$ 27.51 16.90

SUID2010-003 08/08/2012

Rates Fringes

CARPENTER, Includes

Acoustical Ceiling

Installation, Drywall Hanging and Scaffold Building

(Excludes Form Work).............$ 30.14 7.75

CEMENT MASON/CONCRETE FINISHER...$ 26.08 9.93

DRYWALL FINISHER/TAPER...........$ 20.27 3.50

INSULATOR - MECHANICAL

(Duct, Pipe & Mechanical

System Insulation)...............$ 20.13 1.80

LABORER: Carpenter Tender.......$ 17.71 1.82

OPERATOR: Backhoe/Excavator.....$ 20.75 4.42

OPERATOR: Crane.................$ 27.29 10.53

PAINTER: Brush, Roller and

Spray............................$ 19.31 4.41

ROOFER...........................$ 16.00 0.00

TRUCK DRIVER: Dump Truck........$ 17.82 2.18

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This canbe:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION