DeerCrkBridge_sol.doc
DOC document 352 KB Posted
- Attached to
- Idaho Panhandle NF, Deer Creek Bridge Federal contract opportunity
- Solicitation number
- AG-02RC-S-14-0073
About this file
RFP Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DrawingsDeerCreekBridge.pdf | ||
| SuppSpcsDeerCrkFSSS.doc | DOC document | |
| PAST_PERFORMANCE_SURVEY.docx | DOCX document | |
| WorkersCompForm.docx | DOCX document | |
| SF24BidBondFillForm.pdf | ||
| WageDecisionID140088.docx | DOCX document | |
| FoodStorage2011Signed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFEROR'S COPY
NOTE: Attached forms must be completed and submitted intact.
Issuing Office:
U.S. Department of Agriculture Forest Service Idaho Montana Acquisition Team 3815 Schreiber Way Coeur d Alene, ID 83815
Offers Are Solicited For:
PROJECT
Deer Creek Bridge Bonners Ferry Ranger District
| Solicitation No. RFP AG-02RC-S-14-0073 |
| HELP PREVENT FOREST FIRES |
IMPORTANT - NOTICE TO OFFEROR
1. This is a complete copy. Information and instructions for submission of proposals as well as contract provisions and specifications are contained in this OFFEROR REFERENCE COPY. This copy should be retained by offerors.
2. Note: An offer guarantee (Bid Bond) IS REQUIRED. Performance and Payment Bonds will be required of the successful offeror. (See Section I, FAR Clause 52.228-15.)
FS-6300-45 (11/79)
TABLE OF CONTENTS
Page(s)
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
1 - 2
SECTION B - SUPPLIES OR SERVICES AND PRICES
3 -4
B- 1 - Schedule of Items
B- 2 - Payment for Bond Premiums
SECTION C - DESCRIPTION/SPECIFICATIONS
5-6
C- 1 - Scope of Contract
C- 2 - Project Location
C- 3 - Restrictions
C- 4 - Standard Specifications
C- 5 – Statement of Work/Specifications
C- 6 – Attachments to Statement of Work/Specifications
SECTION E - INSPECTION AND ACCEPTANCE
E- 1 - Clauses Incorporated by Reference
SECTION F - DELIVERIES OR PERFORMANCE
F- 1 - Clauses Incorporated by Reference
F- 2 - Commencement, Prosecution, and Completion of Work
SECTION G – CONTRACT ADMINISTRATION DATA
G- 1 – Post Award Conference
G- 2 – Government Furnished Property
SECTION H - SPECIAL CONTRACT REQUIREMENTS
10-16
H- 1 - Physical Data
H- 2 - Key Personnel
H- 3 - Fire Control
H- 4 - Loss, Damage, or Destruction
H- 5 - Incidental Payment Items
H- 6 - Conformity with Drawings and Specifications
H- 7 - Local Material Sources
H- 8 - Samples, Tests, Cited Specifications
H-9 - Barricades, Warning Signs, and Other Devices
H-10 - Weed Free Equipment
H-11 - Landscape Preservation H-12 - Invoice Processing Platform (IPP)
H-13 - Contractor Performance Assessment Reporting System
H-14 – Reference FAER 52.236-19 Accident Prevention
H-15 - State of Idaho’s Notice to Offeror
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
17-31
I- 1 - Clauses Incorporated by Reference
I- 2 - Reporting Executive Compensation and First-Tier Subcontract Awards
I- 3 - System for Award Management Maintenance
I- 4 - Assurance Regarding Felony Conviction or Tax Delinquent Status for Corporate
Applicants Alternate I
I-5 - Post Award Small Business Program Representation
I-6 - Affirmative Procurement of Biobased Products Under Service and Construction Contracts
I-7 - Buy American Act - Construction Materials
I-8 - Bid Guarantee
I-9 - Performance and Payment Bonds - Construction
I-10 - Alternative Forms of Security
I-11 – Federal, State, and Local Taxes
I-12 - Reimbursement For Bond Premiums - Fixed Price Construction Contracts
I-13 - Providing Accelerated Payment to Small Business Subcontractors
I-14 - Permits and Responsibilities
I-15 - Alterations In Contract
I-16 - Authorized Deviations in Clauses
I-17 - Order of Precedence - Construction
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
32-33
J- 1 - Wage Determination
J- 2 – Supplemental Specifications
J- 3 - Drawings
J- 4 – Exhibits
J-5 – State of Idaho Certificate of Verification of Workers’ Compensation Insurance form
J-6 – SF24 Bid Bond Form
J-7 – Owner/Client past Performance Survey form
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER
34-37
STATEMENTS OF OFFERORS AND RESPONDENTS
K- 1 - Annual Representations and Certifications
K- 2 - Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction Alternate I
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
38-44
AND RESPONDENTS
L- 1 - Solicitation Provisions Incorporated by Reference
L- 2 – System for Award Management
L- 3 - Inquiries
L- 4 - Instructions for the Preparation of Technical and Business Proposals
L- 5 - Amendments to Proposals
L- 6 - Type of Contract
L- 7 - Davis-Bacon Act—Secondary Site of the Work
L-8 - Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity
For Construction
L-9 - Notice of Buy American Act Requirements - Construction Materials
L-10 - Service of Protest
L-11 - Site Visit (Construction)
L-12 - Preparation of Proposals – Construction
L-13 - Authorized Deviations in Provisions
SECTION M - EVALUATION FACTORS FOR AWARD
45-47
M- 1 – Award Determination
M- 2 – Evaluation Criteria
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
RFP AG-02RC-S-14-0073
2. TYPE OF SOLICITATION
FORMCHECKBOX
SEALED BID (IFB)
FORMCHECKBOX
NEGOTIATED (RFP)
3. DATE ISSUED
6/2/2014
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
688514
6. PROJECT NO.
7. ISSUED BY
CODE
| 8. ADDRESS OFFER TO |
USDA, Forest Service
Idaho Montana Acquisition Team 3815 Schreiber Way Coeur d Alene, ID 83815 USDA, Forest Service
Idaho Montana Acquisition Team
3815 Schreiber Way
9. FOR INFORMATION
CALL:
a. NAME
RITA J. LOPER, C.O.
Brent Briggs (technical)
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(208) 765-7497
(208) 765-7436
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
Deer Creek Bridge Bonners Ferry Ranger District
Idaho Panhandle National Forests Boundary County, Idaho Price Range is:
Between $250,000 and $500,000.
This project is HUBZone set-aside
11. The Contractor shall begin performance within 10 calendar days and complete it within 10/30/2015 calendar days after receiving
FORMCHECKBOX
award, FORMCHECKBOX notice to proceed. This performance period is FORMCHECKBOX mandatory, FORMCHECKBOX negotiable. (See Section F, Clause 52.211-10)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12b.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a.
Sealed offers in original and * copies to perform the work required are due at the place specified in Item 8 by 4:00 pm local time July 2, 2014 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
b.
An offer guarantee
FORMCHECKBOX
is, FORMCHECKBOX is not required. (If “is required” see AGAR Clause 452.228-70) c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than 30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
1442-101
STANDARD FORM 1442 (REV. 4-85)
Computer Generated
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
Duns No. ______________________________________
TIN: ___________________________________________
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE
FACILITY CODE
17.
The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
| AMENDMENT NO. |
| DATE |
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
FORMCHECKBOX
10 U.S.C. 2304(c)( )
FORMCHECKBOX
41 U.S.C. 253(c)( )
26. ADMINISTERED BY
CODE
| 27. PAYMENT WILL BE MADE BY |
USDA – Forest Service
Idaho Montana Acquisition Team 3815 Schreiber Way
All invoices will be processed using the Department of Treasury’s Invoice Processing Platform (IPP), visit http://www.ipp.gov to learn more. Contractors must follow the instructions on how to register and submit invoices via IPP.
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
FORMCHECKBOX
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
FORMCHECKBOX
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
RITA J. LOPER
30b. SIGNATURE
30c. DATE
31b. UNITED STATES OF AMERICA
BY
31c. DATE
Computer Generated
STANDARD FORM 1442 BACK (REV. 4-85)
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES
Deer Creek Bridge Bonners Ferry Ranger District
Idaho Panhandle National Forests Boundary County, ID B-1 SCHEDULE OF ITEMS – DEER CREEK BRIDGE (Rd. 2541 – M.P. 3.1)
ITEM
NO.
| DESCRIPTION |
| METH. OF |
MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101
Mobilization
LSQ
Lump Sum
15221
Construction Survey and Staking
LSQ
Lump Sum
15713
Soil Erosion and Pollution Control
LSQ
Lump Sum
20304
Removal of Existing Bridge
LSQ
Lump Sum
20411 Roadway Embankment
CQ
Cubic Yard
20806 Structure Excavation
LSQ
Lump Sum
| 20808 |
| Structural Backfill |
LSQ
| Lump Sum |
| 1 |
25101
Placed Riprap, Class 6 (Commercial Source)
CQ
Cubic Yard
| 315 |
| $________ |
| $________ |
30801
Crushed Aggregate, Compaction Method 1 (Commercial Source)
CQ
Cubic Yard
| 55100 |
| Furnish Pile Driving Equipment |
| LSQ |
| Lump Sum |
| 1 |
55101
Steel H Piles, HP 12x74, Driven
AQ
Linear Foot
508.8
| 55103 |
| Dynamic Load Pile Test |
| AQ |
| Each |
| 2 |
55109
Steel H Piles, HP 12x74, Furnished
AQ
Linear Foot
532.8
55111
Pile Shoes
AQ
Each
55204
Structural Concrete, Class C(AE), Pile Cap
CQ
Cubic Yard
553A01
Precast Concrete Member, Wingwalls
LSQ
Lump Sum
55301 Precast Prestressed Concrete Member, Bulb Tee Beams
AQ
Each
62201a
Hydraulic Excavator with Thumb
AQ
| Hour |
| 8 |
ITEM
NO.
| DESCRIPTION |
| METH. OF |
MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
62201b
Large Dump Truck
AQ
Hour
| 62528 |
| Seeding, Dry Method |
| LSQ |
| Lump Sum |
| 63305 |
| Posts, Wood |
AQ
| Linear Foot |
| 36 |
| 63306 |
| Object Markers, Type 3 |
CQ
| Each |
| 4 |
TOTAL ALL ITEMS $__________________
* Designated Method of Measurement:
DQ – Designed Quantities; AQ - Actual Quantities, LSQ - Lump Sum Quantities; SQ – Staked Quantities; CQ – Contract Quantities
B- 2 Payment for Bond Premiums Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
Under Clause 52.236-7, Permits and Responsibilities, Contractors shall be responsible for complying with any Federal, State, and municipal laws, codes and regulations applicable to the performance of the work. Questions regarding assessment of Idaho Use Tax on Government Property should be directed to the Idaho State Tax Commission at (208) 799-3491.
PART I - THE SCHEDULE
SECTION C - DESCRIPTION/SPECIFICATIONS
C- 1 Scope of Contract
This project consists of the removal of an existing timber bridge and construction of a new 75’ span by 21” wide concrete Bulb Tee beam bridge with a piling foundation. The bridge is located on F.S. Road No. 2541 at milepost 3.1. Work consists of, but is not limited to; structure excavation, placement of Class 6 riprap, installation of steel H piling, concrete pile cap, precast concrete wingwalls, installation of prestressed concrete bulb tee beams, excavation and embankment of the roadway approaches, and road surfacing.
C- 2 Project Location
This project is located in the Bonners Ferry Ranger District of Idaho Panhandle National Forest, approximately 13 air miles north east of Bonners Ferry in Boundary County, Idaho. The legal description is the NE ¼ section 18, T. 63 N., R.3 E, B.M. Refer to the location map on the title sheet of the plans. Latitude and longitude at the site is 48.817030, -116.116212
C-3 Restrictions. No work will be allowed before August 1st. Instream work will not be allowed after October 30th of any construction year. Contractor shall develop and submit an operating plan 30 days prior to any instream work. Government may elect to perform vicinity instream fish surveys (snorkeling) and possible fish removal mitigation during the 14 day period prior to contractor’s instream work. See Supplemental Specification Section 156 for requirements for accommodating public traffic during work.
C- 4 STANDARD SPECIFICATIONS: " FHWA FP-03 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS” are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this Solicitation and any resultant contract.
Copies of the " FHWA FP-03 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS" are available for download at the following URL:
http://www.wfl.fha.dot.gov/design/specs/fp03.htm.
The following “FHWA FP-03 Standard Specifications FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS” are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract.
SPEC. NO
TITLE
PREFACE
Section 101
TERMS, FORMAT, AND DEFINITIONS
Section 102
BID, AWARD AND EXECUTION OF CONTRACT
Section 103
SCOPE OF WORK
Section 104
CONTROL OF WORK
Section 105
CONTROL OF MATERIAL
Section 106
ACCEPTANCE OF WORK
Section 107
LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
Section 108
PROSECUTION AND PROGRESS
Section 109
MEASUREMENT AND PAYMENT
Section 151
MOBILIZATION
Section 152
CONSTRUCTION SURVEY AND STAKING
Section 153
CONTRACTOR QUALITY CONTROL
Section 154
CONTRACTOR SAMPLING AND TESTING
Section 155
SCHEDULES FOR CONSTRUCTION CONTRACTS
Section 156
PUBLIC TRAFFIC
Section 157
SOIL EROSION CONTROL
Section 201
CLEARING AND GRUBBING
Section 203
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Section 204
EXCAVATION AND EMBANKMENT
Section 208
STRUCTURE EXCAVATION AND BACKFILL FOR SELECTED
MAJOR STRUCTURES
Section 209
STRUCTURE EXCAVATION AND BACKFILL
Section 251
RIPRAP
Section 308
MINOR CRUSHED AGGREGATE
Section 551
DRIVEN PILES
Section 552
STRUCTURAL CONCRETE
Section 553
PRESTRESSED CONCRETE
Section 554
REINFORCING STEEL
Section 555
STEEL STRUCTURES
Section 622
RENTAL EQUIPMENT
Section 625
TURF ESTABLISHMENT
Section 633
PERMANENT TRAFFIC CONTROL
Section 701
CEMENT
Section 703
AGGREGATE
Section 704
SOIL
Section 705
ROCK
Section 709
REINFORCING STEEL & WIRE ROPE
Section 711
CONCRETE CURING MATERIAL & ADMIXTURES
Section 712
JOINT MATERIAL
Section 713
ROADSIDE IMPROVEMENT MATERIAL
Section 714
GEOTEXTILE AND GEOCOMPOSITE DRAIN MATERIAL
Section 717
STRUCTURAL METAL
Section 718
TRAFFIC SIGNING AND MARKING MATERIAL
Section 725
MISCELLANEOUS MATERIAL
See Section J for list of Supplemental Specifications and Drawings.
C-5 AGAR 452.211-3 Statement of Work/Specifications. (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C-6 AGAR 452.211-4 Attachments to Statements of Work/Specifications. (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract
PART I - THE SCHEDULE
SECTION E - INSPECTION AND ACCEPTANCE
E- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - http://www.acquisition.gov/far and the Agriculture Acquisition Regulations – http://www.usda.gov/procurement/policy/agar.html.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996) 52-246-6 Inspection-Time and Materials and Labor Hour (MAY 2001)
PART I - THE SCHEDULE
SECTION F - DELIVERIES OR PERFORMANCE
F- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - http://www.acquisition.gov/far and the Agriculture Acquisition Regulations – http://www.usda.gov/procurement/policy/agar.html.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984) F- 2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10-calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 30, 2015. The time stated for completion shall include final cleanup of the premises.
NOTE. It is estimated that the notice to proceed under this contract will be issued approximately mid-January, 2015 to facilitate the contract submittal process and contractor ordering of concrete bridge components. See Section C for Restrictions SECTION G - Contract Administration Data
AGRICULTURE ACQUISITION REGULATIONS (48 CFR CHAPTER 4) CLAUSES
http://www.dm.usda.gov/procurement/policy/agar.html
G-1 AGAR 452-215-73 Post Award Conference (NOV 1996). A post award conference with successful offeror is required. It will be scheduled and held before work begins, after the date of contract award. The conference will be held at a location to be determined as agreed upon.
G-2 Government-Furnished Property. Backfill material as needed.
See Section I, FAR 52.229-3 Federal, State, and Local Taxes
PART I - THE SCHEDULE
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H- 1 FAR 52.236-4 Physical Data (APR 1984) Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by visual observation.
H- 2 AGAR 452.237-74 Key Personnel (FEB 1988) *(If applicable)
(a) The Contractor shall assign to this contract the following key personnel:
Superintendent/On-site Contractor Representative (on-site supervisor)
Quality Control Officer
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
H- 3 Fire Control
(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.
(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or the Contractor’s employees, the Contractor when requested by the Contracting Officer shall place the employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.
Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.
An equitable adjustment in contract time may be made for this period.
(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to the Contractor’s operation under the contract.
(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.
(2) Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:
One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.
One - shovel, round point #0 lady or equal.
One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.
One - water container (at least 1-gallon capacity), not required with stationary equipment.
(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multiposition engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.
(4) Powersaws. For each powersaw used in connection with this contract, the following will be provided:
One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.
One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.
Any fueling or refueling of a powersaw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; powersaw shall be moved at least 10 feet from place of fueling before starting.
(5) Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated.
(6) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.
(7) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.
(8) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.
(9) Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.
All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.
(10) Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start.
(11) Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will usually be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions.
When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:
(i) All high fire risk operations could be terminated at 1300 local time.
(ii) All burning could be stopped, including debris burning fires.
(iii) Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman.
(12) Pump and Trailer. NOT REQUIRED
(13) Burning. Before starting any open burning, the Contractor shall comply with the following:
(i) Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage.
(ii) Obtain a burning permit from the District Ranger.
(iii) Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke.
(iv) Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires.
(v) Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period.
(vi) Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his/her discretion, prohibit all open burning for definite periods within specific areas of the National Forest.
H- 4 Loss, Damage, or Destruction
(a) Equipment furnished with operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.
All claims arising under this clause will be submitted to the Contracting Officer.
H- 5 Incidental Payment Items
The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.
H- 6 Conformity With Drawings and Specifications
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.
H- 7 Local Material Sources
(a) Designated Sources--Sources of local materials will be designated on the drawings. The Government assumes responsibility for the quality and quantity of material in the source. The Contractor shall determine the equipment and work required to produce the specified product.
The Contractor shall utilize all suitable material in the source. The designation of source will include the rights of the Contractor to use certain area(s) for plant site, stockpiles, and haul roads. Any Contractor royalty payment requirements will be stated below.
When materials are subject to weight measurement, the weight/volume relationship used for determination of designed quantities will be shown on the Drawings.
Should the designated source, due to causes beyond the control of the Contractor, contain insufficient suitable material, the Government will provide another source with an equitable adjustment in accordance with the Differing Site Conditions and Changes clauses.
(b) Contractor-Furnished Sources--When the material sources are not designated as provided above or the Contractor elects not to use designated sources, the Contractor shall be responsible for providing the specified product with no adjustment in contract price, unless weight/volume relationship differences between designated source material and Contractor-furnished source material result in financial disadvantage to the Government. Quality testing shall be the responsibility of the Contractor. Test results shall be furnished to the Contracting Officer.
H- 8 Samples, Tests, Cited Specifications Reference made in the contract to specifications, standards, or test methods adopted by AASHTO, ASTM, GSA, or other recognized National technical associations, shall mean specifications, standards, or test methods (including interim or tentative issues) which are in effect on the date of the solicitation.
H-9 Barricades, Warning Signs, and Other Devices The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.
H-10 Weed-Free Equipment In order to prevent the potential spread of noxious weeds into the project area, the Contractor shall be required to furnish the Contracting Officer with proof of weed-free equipment.
The following is considered proof of weed-free equipment:
The Contractor will be required to clean all construction equipment (equipment that operates off existing roads) prior to entry on the project area. This cleaning shall remove all dirt and plant parts and material that may carry noxious weed seeds into the project area. Only construction equipment inspected by the Contracting Officer will be allowed to operate within the project area. All subsequent move-ins of construction equipment shall be treated the same as the initial move-in.
Prior to initial move-in of all construction equipment, and all subsequent move-ins, the Contractor shall make equipment available for inspection at an agreed location.
H-11 Landscape Preservation
(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material, which falls outside of these limits, shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
(b) Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste water from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.
H-12 Invoice Processing Platform (IPP)
Beginning February 24, 2014, the Forest Service will utilize the Invoice Processing Platform (IPP) for the electronic submission and tracking of contracts/purchase orders, invoices, and payment information. IPP is a secure Government-wide, Web-based invoice processing service. Visit http://www.ipp.gov to learn more.
Upon award of a contract, Contractors must register at https://www.ipp.gov/vendors/enrollment-vendors.htm. Contractors shall submit all invoices electronically via IPP. Paper copies of invoices will no longer be accepted.
H-13 Contractor Performance Assessment Reporting System (FEB 2011)
(a) General. This contract is subject to Federal Acquisition Regulations (FAR), Agriculture Acquisition Regulations (AGAR), and Forest Service Acquisition Regulations (FSAR) that require past performance evaluations to be completed and entered into the Contractor Performance Assessment Reporting System (CPARS).
(b) Contact Information. At the Prework Meeting, the name and email address of the Contractor Representative will be required.
(c) Assessment. Upon completion of the work associated with the contract/delivery orders, an evaluation will be initiated by the Contracting Officer in the CPARS system and the Contractor Representative will receive an auto-email from CPARS with instructions for completion of the evaluation.
H-14 Reference FAR 52.236-13, Accident Prevention.
Safety. Contractors shall comply with OSHA regulations and provide employees a work environment that is sanitary and not hazardous, which includes providing personal protective equipment. Contractors must maintain a health and safety plan and an accident prevention program, which includes frequent and regular inspections of the project site, materials, and equipment. Contractors are responsible for risk management regarding contractor/employee and public safety, which include experience of operator to handle road and terrain conditions, getting to the worksite, traffic control, and coordination with other users.
H-15 State of Idaho’s Notice to Offeror Idaho Workers Compensation Law
(a) Prior to award of any contract subject to Idaho Workers' Compensation Laws, the contractor must provide (1) evidence that they have the required workers' compensation coverage or, (2) documentation from the State of Idaho exempting the contractor from such coverage.
(b) Contractors should obtain and complete a State of Idaho Certificate of Verification of Workers' Compensation Insurance as documentation of insurance coverage or exemption. These certificates may be obtained from and returned to the Employee Compliance Division of the Idaho Industrial Commission at the following offices:
North Idaho
Southwest Idaho
1221 Ironwood Street, Suite 100
317 Main Street
Coeur d'Alene, ID 83814
P.O. Box 83720
(208) 769-1565
Boise, ID 83720-0041
Fax No. (208) 769-1465
(208) 334-6032
(800) 950-2110
Fax No. (208) 334-5145
Southeast Idaho
1070 Hiline, Suite 300
Pocatello, ID 83201
(208) 236-6366
Fax No. (208) 236-6040
(c) This certificate of verification shall be fully executed by the contractor and signed by the Industrial Commission Compliance Officer prior to award of the contract.
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - http://www.acquisition.gov/far and the Agriculture Acquisition Regulations – http://www.usda.gov/procurement/policy/agar.html.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.202-1 Definitions (NOV 2013)
52.203-3 Gratuities (APR 1984)
52.203-5 Covenant Against Contingent Fees (APR 1984)
52.203-6 Restrictions on Subcontractor Sales to the Government (SEPT 2006) 52.203-7 Anti-Kickback Procedures (OCT 2010)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (JAN 1997)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (JAN 1997)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010)
52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (SEPT 2013) 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (AUG 2013)
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (MAY 2012)
52.211-18 Variation in Estimated Quantity (APR 1984) 52.215-2 Audit and Records - Negotiation (OCT 2010) 52.219-3 Notice of HUBZone Set-Aside or Sole Source Award (NOV 2011) 52.219-8 Utilization of Small Business Concerns (JUL 2013) 52.219-14 Limitations on Subcontracting (NOV 2011) 52.222-3 Convict Labor (JUNE 2003)
52.222-4 Contract Work Hours and Safety Standards Act--Overtime Compensation (JULY 2005)
52.222-6 Davis-Bacon Act (JULY 2005)
52.222-7 Withholding of Funds (FEB 1988)
52.222-8 Payrolls and Basic Records (JUNE 2010)
52.222-9 Apprentices and Trainees (JULY 2005)
52.222-10 Compliance with Copeland Act Requirements (FEB 1988)
52.222-11 Subcontracts (Labor Standards) (JULY 2005) 52.222-12 Contract Termination - Debarment (FEB 1988)
52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)
52.222-14 Disputes Concerning Labor Standards (FEB 1988)
52.222-15 Certification of Eligibility (FEB 1988)
52.222-21 Prohibition of Segregated Facilities (FEB 1999)
52.222-26 Equal Opportunity (MAR 2007)
52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)
52.222-35 Equal Opportunity for Veterans (SEP 2010)
52.222-36 Affirmative Action for Workers with Disabilities (OCT 2010)
52.222-37 Employment Reports on Veterans (SEP 2010)
52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC 2010)
52.222-50 Combating Trafficking in Persons (FEB 2009)
52.222-54 Employment Eligibility Verification (AUG 2013) 52.223-6 Drug-Free Workplace (MAY 2001)
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (MAY 2008) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011)
52.224-1 Privacy Act Notification (APR 1984)
52.224-2 Privacy Act (APR 1984)
52.225-13 Restrictions on Certain Foreign Purchases (JUNE 2008)
52.227-1 Authorization and Consent (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) 52.227-4 Patent Indemnity--Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Pledges of Assets (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995) 52.228-14 Irrevocable Letter of Credit (DEC 1999) 52.229-3 Federal, State, and Local Taxes (FEB 2013)
52.232-5 Payments Under Fixed-Price Construction Contracts (SEPT 2002)
52.232-9 Limitation on Withholding of Payments (APR 1984)
52.232-17 Interest (OCT 2010) 52.232-18 Availability of Funds (APR 1984) 52.232-23 Assignment of Claims (JAN 1986)
52.232-27 Prompt Payment for Construction Contracts (JUL 2013)
52.232-33 Payment by Electronic Funds Transfer—System for Award Management (JUL 2013)
52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.233-1 Disputes (JULY 2002) Alternate I (DEC 1991)
52.233-3 Protest After Award (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984)
52.236-6 Superintendence by the Contractor (APR 1984) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
(APR 1984)
52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991)
52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995)
52.242-13 Bankruptcy (JULY 1995)
52.243-4 Changes (JUNE 2007)
52.244-2 Subcontracts (OCT 2010) 52.244-6 Subcontracts for Commercial Items (DEC 2013)
52.245-1 Government Property (APR 2012) 52.245-9 Use and Charges (APR 2012) 52.246-21 Warranty of Construction (MAR 1994) 52.248-3 Value Engineering--Construction (OCT 2010) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012) Alternate I (SEPT 1996) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.251-1 Government Supply Sources (APR 2012)
52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.224-70 Confidentiality of Information (FEB 1988)
452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988)
I- 2 FAR 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUL 2013)
(a) Definitions. As used in this clause:
“Executive” means officers, managing partners, or any other employees in management positions.
“First-tier subcontract” means a subcontract awarded directly by the Contractor for the purpose of acquiring supplies or services (including construction) for performance of a prime contract. It does not include the Contractor’s supplier agreements with vendors, such as long-term arrangements for materials or supplies that benefit multiple contracts and/or the costs of which are normally applied to a Contractor’s general and administrative expenses or indirect costs.
“Months of award” means the month in which a contract is signed by the Contracting Officer or the month in which a first-tier subcontract is signed by the Contractor.
“Total compensation” means the cash and noncash dollar value earned by the executive during the Contractor’s preceding fiscal year and includes the following (for more information see 17 CFR 229.402(c)(2)):
(1) Salary and bonus.
(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Financial Accounting Standards Board’s Accounting Standards Codification (FASB ASC) 718, Compensation-Stock Compensation.
(3) Earnings for services under non-equity incentive plans. This does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.
(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.
(5) Above-market earnings on deferred compensation which is not tax-qualified.
(6) Other compensation, if the aggregate value of all such other compensation (e.g., severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property) for the executive exceeds $10,000.
(b) Section 2(d)(2) of the Federal Funding Accountability and Transparency Act of 2006 (Pub.
L. 109-282), as amended by section 6202 of the Government Funding Transparency Act of 2008 (Pub.
L. 110-252), requires the Contractor to report information on subcontract awards. The law requires all reported information be made public, therefore, the Contractor is responsible for notifying its subcontractors that the required information will be made public.
(c) Nothing in this clause requires the disclosure of classified information.
(d)
(1) Executive compensation of the prime contractor. As a part of its annual registration requirement in the System for Award Management (SAM) database (FAR provision 52.204-7), the Contractor shall report the names and total compensation of each of the five most highly compensated executives for its preceding completed fiscal year, if—
(i) In the Contractor’s preceding fiscal year, the Contractor received—
(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and
(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and
(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm.)
(2) First-tier subcontract information. Unless otherwise directed by the contracting officer, or as provided in paragraph (h) of this clause, by the end of the month following the month of award of a first-tier subcontract with a value of $25,000 or more, the Contractor shall report the following information at http://www.fsrs.gov for that first-tier subcontract. (The Contractor shall follow the instructions at http://www.fsrs.gov to report the data.)
(i) Unique identifier (DUNS Number) for the subcontractor receiving the award and for the subcontractor's parent…