AVERY DRAIN ROCK 2-Layout2.pdf

PDF 33 KB Posted

Attached to
1 IMAT IdahoPanhandle NF Avery Landscaping
Solicitation number
AG-02RC-S-11-0088
Issued by

About this file

map an drawings

View the file

Other files

File Type Posted
SF 30.doc DOC document
workercomp.doc DOC document
SF 30.doc DOC document
ConstructionRFQSampleFAC2005-50C51BMAY162011.doc DOC document
AVERY LANDSCAPE 1-11X17.pdf PDF
workercomp.docm DOCM document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAIN

OFFICE

NOTE:

ALL MEASUREMENTS ARE

NOTED IN FEET

ALL DRAIN ROCK WILL EXTEND 2

FEET FROM EXTERIOR WALLS,

NOT INCLUDING INLET DEPTH.

REMOVE ALL TOPSOIL AND

VEGETATION 8 INCHES DEEP..

PLACE WEED CONTROL

BARRIER UNDER ALL DRAIN

ROCK TO PREVENT SOIL

CONTAMINATION AND WEEDS.

WEED CONTROL BARRIER

SHALL BE PERMEABLE FOR

MOISTURE TO DRAIN

INSTALL 6 INCH BLACK POLY

EDGING AROUND PERIMETER

OF DRAIN ROCK.

- NOTE -

ALL INLETS

ARE TO BE

ROCKED.

MAIN

ENTRANCE

(VESTIBULE)

DRAIN ROCK

41.0

DRAIN ROCK

2.0

44.0

2.0

23.0

5.0

DECK

File details come from the government source that posted it. Updated .