AVERY DRAIN ROCK 2-Layout2.pdf
PDF 33 KB Posted
- Attached to
- 1 IMAT IdahoPanhandle NF Avery Landscaping
- Solicitation number
- AG-02RC-S-11-0088
About this file
map an drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30.doc | DOC document | |
| workercomp.doc | DOC document | |
| SF 30.doc | DOC document | |
| ConstructionRFQSampleFAC2005-50C51BMAY162011.doc | DOC document | |
| AVERY LANDSCAPE 1-11X17.pdf | ||
| workercomp.docm | DOCM document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAIN
OFFICE
NOTE:
ALL MEASUREMENTS ARE
NOTED IN FEET
ALL DRAIN ROCK WILL EXTEND 2
FEET FROM EXTERIOR WALLS,
NOT INCLUDING INLET DEPTH.
REMOVE ALL TOPSOIL AND
VEGETATION 8 INCHES DEEP..
PLACE WEED CONTROL
BARRIER UNDER ALL DRAIN
ROCK TO PREVENT SOIL
CONTAMINATION AND WEEDS.
WEED CONTROL BARRIER
SHALL BE PERMEABLE FOR
MOISTURE TO DRAIN
INSTALL 6 INCH BLACK POLY
EDGING AROUND PERIMETER
OF DRAIN ROCK.
- NOTE -
ALL INLETS
ARE TO BE
ROCKED.
MAIN
ENTRANCE
(VESTIBULE)
DRAIN ROCK
41.0
DRAIN ROCK
2.0
44.0
2.0
23.0
5.0
DECK
File details come from the government source that posted it. Updated .