USDA FOREST SERVICE, R4
HUMBOLDT-TOIYABE SUPERVISOR'S OFFICE HVAC REPLACEMENT
SECTION 011250 - MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.1 SUMMARY
A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.
B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.
1.2 DETERMINATION OF QUANTITIES
A. The following measurements and calculations shall be used to determine contract quantities for payment.
1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.
2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.
3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.
4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.
5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.
6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.
1.3 UNITS OF MEASUREMENT
A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:
1. 50lb Bag: Measurement will be for the actual number of 50lb bags of standard bentonite grout.
2. 94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout.
Attachment #2 Solicitation No.: AG-0261-S-17-0020
3. Cubic Yard (CY): A measurement computed by one of the following methods:
a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.
b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.
c. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.
4. Each (EA): One complete unit, which may consist of one or more parts.
5. Gallons (GAL): The quantity shall be measured by any of the following methods:
a. Measured volume in container.
b. Metered volume by approved metering system.
c. Commercially package volume.
6. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.
7. Linear Foot (LF): Measurement of work along its length from point-to-point; parallel to the base or foundation. Do not measure overlaps.
8. Lump Sum (LS): One complete unit.
9. Mile: Measured horizontally along the centerline of each roadway, approach, or ramp.
10. Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.
11. Square Foot (SF): Measured on a plane parallel to the surface being measured.
12. Square Yard (SY): Measured on a plane parallel to the surface being measured.
13. Ton: Measured as a short ton consisting of 2,000 pounds.
1.4 METHOD OF MEASUREMENT
A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:
1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.
2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:
a. As a result of changes in the work authorized by the CO.
b. As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.
c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
Attachment #2
3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION (NOT APPLICABLE)
END OF SECTION 011250
JANUARY 2017
Attachment #2
SECTION 011900 - MOBILIZATION
PART 1 - GENERAL
1.1 SUMMARY
A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.
1.2 MEASUREMENT AND PAYMENT
A. The measurement shall be lump sum for mobilization. Payment shall be as follows:
1. Bond premiums will be reimbursed after receipt of the evidence of payment.
2. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.
3. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.
4. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.
5. Progress payments for mobilization and preparatory work shall be subject to retainage.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
END OF SECTION 011900
JANUARY 2017
Attachment #2
SECTION 013300 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.
B. See other specification section within this package for additional requirements on submittal.
1.2 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Allow 14 days for processing each re-submittal.
4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
C. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.
3. Include the following information on label for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. If more than one item is shown on submittal sheet, identify item.
Attachment #2
D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.
1.3 MEASUREMENT AND PAYMENT
A. No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items/estimate.
PART 2 - PRODUCTS
2.1 ACTION SUBMITTALS – (Submittals requiring CO approval)
A. General: Prepare and submit Action Submittals required by individual Specification Sections.
1. Number of Copies: Submit electronic copies of each submittal, unless otherwise indicated.
Mark up and retain returned electronic copy as a Project Record Document.
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. Mark each copy of each submittal to show which products and options are applicable.
2. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
g. Compliance with recognized testing agency standards.
C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
1. Preparation: Include the following information, as applicable:
a. Dimensions.
b. Identification of products.
c. Fabrication and installation drawings.
d. Roughing-in and setting diagrams.
e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.
f. Notation of dimensions established by field measurement.
2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.
Attachment #2
D. Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.
E. Samples: Prepare physical units of materials or products, including the following:
1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
2.2 INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval)
A. General: Prepare and submit Informational Submittals required by other Specification Sections.
1. Number of Copies: Submit electronic copies of each submittal, unless otherwise indicated.
Mark up and retain returned electronic copy as a Project Record Document.
2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
3. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."
B. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.
C. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.
D. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.
E. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.
PART 3 - EXECUTION
3.1 GENERAL
A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.
B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.
D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
E. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If
Attachment #2 the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.
F. Requests for substitutions will only be considered if contractor submits the following:
1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.
2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.
3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.
4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.
3.2 SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive – additional submittals may be required by specific specifications:
TABLE 013000-1
Spec.
Section Section Title Subsec tion Required Submittal
013300 Submittal Procedures 2.1D Construction Schedule 014130 Quality Control 1.2B Contractor Quality Control Plan 014130 Quality Control 1.2C Daily Reports 014130 Quality Control 1.2D Corrective Action Logs 014130 Quality Control 1.2E Test Reports 014130 Quality Control 1.2F Off-site Inspection Reports 014130 Quality Control 1.2G As-Built drawings 014130 Quality Control 1.2H Permits, Licenses and Certificates 017320 Selective Demolition 1.5A Schedule 017320 Selective Demolition 1.5B Qualification Data 017320 Selective Demolition 1.5C Photos/ Video 017320 Selective Demolition 1.5D Statement of Refrigerant Recovery 017320 Selective Demolition 1.6A Landfill Records 076200 Sheet Metal Flashing and Trim 1.3A Product Data 076200 Sheet Metal Flashing and Trim 1.3B Shop Drawings 076200 Sheet Metal Flashing and Trim 1.3C Samples 078413 Penetration Firestopping 1.3A Product Data 078413 Penetration Firestopping 1.4A Installer Certificates 079200 Joint Sealants 1.2A Product Data 079219 Acoustical Joint Sealants 1.2A Product Data 092900 Gypsum Board 1.2A Product Data 092900 Gypsum Board 1.2B Mockup of textured finish 095113 Acoustical Panel Ceilings 1.2A Product Data 095113 Acoustical Panel Ceilings 1.2B Samples
Attachment #2
Spec.
Section Section Title Subsec tion Required Submittal
095113 Acoustical Panel Ceilings 1.3A Maintenance Data 099123 Interior Painting 1.3A Product Data 099123 Interior Painting 1.3B Samples 099123 Interior Painting 1.3C Mockups 230517 Sleeves and Sleeve Seals for HVAC
Piping 1.2A Product Data
230518 Escutcheons for HVAC Piping 1.2A Product Data 230529 Hangars and Supports for HVAC Piping and Equipment 1.3A Product Data
230529 Hangars and Supports for HVAC Piping and Equipment
1.3B Welding Certificates
230548 Vibration and Seismic Controls for
HVAC
1.2A Product Data
230548 Vibration and Seismic Controls for
HVAC
1.2B Delegated Design Submittal
230548 Vibration and Seismic Controls for
HVAC
1.2C Welding Certificates
230548 Vibration and Seismic Controls for
HVAC
1.2D Field Quality Control Reports
230553 Identification for HVAC Piping 1.2A Product Data 230593 Testing, Adjusting and Balancing for
HVAC
1.3A Strategies and Procedures Plan
230593 Testing, Adjusting and Balancing for
HVAC
1.3B TAB Reports
230713 Duct Insulation 1.2A Product Data 230713 Duct Insulation 1.2B Field Quality Control Reports 230719 HVAC Piping Insulation 1.2A Product Data 230719 HVAC Piping Insulation 1.2B Field Quality Control Reports 231123 Facility Natural Gas Piping 1.3A Product Data 231123 Facility Natural Gas Piping 1.3B Welding Certificates 231123 Facility Natural Gas Piping 1.3C Field Quality Control Reports 231123 Facility Natural Gas Piping 1.3D Operation and Maintenance Data 233113 Metal Ducts 1.3A Product Data 233113 Metal Ducts 1.3B Welding Certificates 233000 Air Duct Accessories 1.2A Product Data 233000 Air Duct Accessories 1.3A Operation and Maintenance Data 233713 Diffusers Registers and Grilles 1.2A Product Data 236200 Variable Refrigerant Flow Systems 1.3A Product Data 236200 Variable Refrigerant Flow Systems 1.3B Shop Drawings 236200 Variable Refrigerant Flow Systems 1.3C Samples 236200 Variable Refrigerant Flow Systems 1.3D Contractor Certification 237433 Dedicated Outdoor Air Units 1.3A Shop Drawings 237433 Dedicated Outdoor Air Units 1.3B Product Data 260533 Raceways and Boxes for Electrical
Systems 1.2A Product Data
260533 Raceways and Boxes for Electrical Systems
1.2 B Qualifications Certificates
Attachment #2
Spec.
Section Section Title Subsec tion Required Submittal
262416 Panelboards 1.3A Product Data
END OF SECTION 013300
SECTION 014130 - CONTRACTOR’S QUALITY CONTROL
PART 1 - GENERAL
1.1 DESCRIPTION
A. The work of this section consists of preparing and executing a quality control program.
B. This section includes administrative and procedural requirements for quality-control services.
C. Quality-control services include inspections, tests, and related actions, including reports performed by Contractor, by independent agencies, and by governing authorities. They do not include contract enforcement activities performed by the Contracting Officer.
D. Testing services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with Contract document requirements.
E. Requirements of this section relate to customized fabrication and installation procedures, not production of standard products.
1. Specific quality-control requirements for individual construction activities are specified in the sections that specify those activities. Requirements in those sections may also cover production of standard products.
2. Specified inspections, tests, and related actions do not limit Contractor’s quality-control procedures that facilitate compliance with Contract Document requirements.
3. Requirements for Contractor to provide quality-control services required by the Contracting Officer, or authorities having jurisdiction are not limited by provisions of this section.
1.2 SUBMITTALS
A. As specified in specification 013300.
B. Quality Control Plan:
1. At the time of the preconstruction conference, submit for approval a written Contractor Quality Control (CQC) Plan.
2. If the CQC Plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.
3. The Government reserves the right to require changes in the CQC Plan during the contract period as necessary to obtain the quality specified.
4. No change in the approved CQC Plan may be made without written concurrence by the Contracting Officer.
5. The CQC Plan shall be a comprehensive document that addresses every aspect of the Contractor’s activity in support of quality finished products. Each aspect of quality control addressed by the contract documents shall be addressed. Mandatory items of the CQC Plan include, but are not limited to the following:
a. A statement of the Contractor’s quality control policy.
Attachment #2
b. A list of personnel responsible for quality control and assigned duties. Include each person’s qualifications.
c. A copy of a letter of direction to the Contractor’s Quality Control Supervisor outlining assigned duties.
d. Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.
e. Methods of performing, documenting, and enforcing quality control of all work.
f. Methods of monitoring and controlling environmental pollution and contamination as required by regulations and laws.
g. Outline showing each Definable Feature of Work (DFW) (identified by specification section) describing the quality control activities that take place at each phase for each DFW.
h. Detailed description of the mechanisms to be used to track deficient work, notify responsible parties, ensure correction, and provide verification. Contractor shall maintain a log of defective work/corrective actions and shall provide a copy of new log entries to the Contracting Officer as deficiencies are identified. Provide a sample of the log.
i. Contractor’s program of quality control for items fabricated off-site.
j. Detailed description of how record documents will be identified, collected, organized, and retained during the course of the project.
C. Contractor’s Quality Control Daily Reports: Submit showing all inspections and tests on the first work day following the date covered by the report.
D. Defective work/corrective action logs.
E. Test Reports:
1. Submit Daily Test Information Sheets with Quality Control Daily Reports.
2. Submit failing test results and proposed remedial actions within four hours of noted deficiency.
3. Submit electronic copies of complete test results not later than three calendar days after the test was performed.
4. Testing and Inspection Reports shall include the following:
a. Date of issue.
b. Project title and number.
c. Name, address, and telephone number of testing agency.
d. Dates and locations of samples, tests, or inspections.
e. Names of individuals performing tests and inspections.
f. Reference Specification Section(s).
g. Complete test or inspection data.
h. Test and inspection results and an interpretation of test results.
i. Ambient conditions at time sample was taken, tested, or inspected.
j. Comments or professional opinion on whether tested or inspected work complies with the Contract Document requirements.
k. Name and signature of laboratory inspector.
l. Recommendations on retesting and re-inspecting.
F. Off-Site Inspection Reports: Submit prior to shipment.
G. As-Built Drawings.
H. Permits, Licenses, and Certificates
Attachment #2
I. If the CQC plan and Quality Control Daily Reports are not submitted as specified, the Contracting Officer may retain all payments until such time a plan is approved and implemented. Failure of the Contractor to properly implement their Quality Control Plan may result in revocation of the plan’s approval. The Contracting Officer would then request the plan be revised and re-submitted to correct implementation of the plan. No payments would be made during any period when the Quality Control Plan is not approved.
1.3 QUALITY ASSURANCE
A. General:
1. The quality of all work shall be the responsibility of the Contractor. Testing shall be the responsibility of an independent testing laboratory, the cost of which shall be borne by the Contractor.
2. Inspect and test all work often enough to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and drawings.
3. Quality Control Daily Reports shall be completed by the Quality Control Supervisor.
4. Test reports shall be completed by person performing the test.
5. The Contracting Officer may designate locations of tests.
B. Quality Control Staff:
1. The Contractor's designated Quality Control Supervisor or their alternate shall be on the project site whenever contract work is in progress.
2. The Contractor's supervisory staff may be used to assist the Quality Control Supervisor, supplemented as necessary by additional certified testing technicians.
C. Testing Laboratory and Equipment:
1. Employ certified independent laboratories to perform sampling and testing. The testing laboratory organization shall be certified for the type of testing work to be done.
2. All measuring devices, laboratory equipment, and instruments shall be calibrated at established intervals against certified standards in accordance with NBS requirements.
Upon request, measuring and testing devices shall be made available for use by the Government for verification tests.
1.4 MEASUREMENT AND PAYMENT
A. No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
3.1 OFF-SITE CONTROL
A. Items that are fabricated or assembled off-site shall be inspected for quality control at the place of fabrication.
3.2 ON-SITE CONTROL
A. Notification:
Attachment #2
1. Notify the Contracting Officer at least 48 hours in advance of the preparatory phase meeting.
2. Notify the Contracting Officer at least 24 hours in advance of the initial and follow-up phases.
B. Preparatory Phase: Perform before beginning each feature of work.
1. Review control submittal requirements with personnel directly responsible for the quality control work. As a minimum, the Contractor's Quality Control Supervisor and the foreman responsible for that particular feature of work shall be in attendance.
2. Review all applicable specification sections and drawings related to the feature of work.
3. Ensure that copies of all referenced standards related to sampling, testing, and execution for the feature of work are available on site.
4. Ensure that provisions have been made for field control testing.
5. Examine the work area to ensure that all preliminary work has been completed.
6. Verify all field dimensions and advise the Contracting Officer of discrepancies with contract documents.
7. Ensure that necessary equipment and materials are at the project site and that they comply with approved shop drawings and submittals.
8. Review the Site Specific Health and Safety Plan. Note the hazards associated with the subject DFW, and discuss safety provisions. Identify any hazards that were overlooked in preparation of the SSHSP. Arrange for necessary safety equipment, controls, or monitoring.
9. Prepare a report on all preparatory phase activities and discussions. Attach report to Contractor's Quality Control Daily Report.
C. Initial Phase:
1. As soon as work begins, inspect and test a representative portion of a particular feature of work for quality of workmanship.
2. Review control-testing procedures to ensure compliance with contract requirements.
3. Review use of proper safety materials and procedures.
4. Prepare a report on all initial phase activities and discussions. Attach report to Contractor's
Quality Control Daily Report. Exact location of initial phase shall be indicated for future reference and comparison with follow-up phases.
D. Follow-Up Phase: Inspect and test as work progresses to ensure compliance with contract requirements until completion of work.
E. Additional Preparatory and Initial Phases: Additional preparatory and initial phases may be required on the same feature of work for the following reasons:
1. Quality of on-going work is unacceptable.
2. Changes occur in the applicable quality control staff, on-site production supervision, or work crew.
3. Work on a particular feature of work is resumed after a substantial period of inactivity.
3.3 DOCUMENTATION
A. Maintain Quality Control Daily Reports and Daily Test Report Information Sheets of quality control activities and tests.
B. Quality Control Daily Reports may not be substituted for other written reports required under clauses of the contract, such as Disputes, Differing Site Conditions, or Changes.
Attachment #2
C. Maintain itemized documentation of materials that have arrived on-site and provide for review when requested by the Contracting Officer. Review and verification will be required to process payment requests.
D. Record Documents.
E. Defective work/corrective action log shall be maintained daily and copies provided to the Contracting Officer at a minimum weekly, or as requested by the Contracting Officer.
3.4 PERMITS, LICENSES, AND CERTIFICATES
A. For Contracting Officer’s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations relevant to the on performance of the work.
3.5 AS-BUILT DRAWINGS
A. The Contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from the original contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the Contracting Officer.
3.6 ENFORCEMENT
A. The Contractor shall stop work on any item or feature pending satisfactory correction of any deficiency noted by the quality control staff or the Contracting Officer.
3.7 REPAIR AND PROTECTION
A. General: Upon completion of inspection, testing, sample taking and similar services, repair damaged construction and restore substrates and finishes.
B. Protect construction exposed by or for quality-control service activities, and protect repaired construction.
C. Repair and protection is Contractor’s responsibility, regardless of the assignment of responsibility for inspection, testing, or similar services.
3.8 SAMPLING, TESTING, AND CERTIFICATION REQUIREMENTS
A. Sampling, testing, and Certification requirements and frequency for specific items shall be as specified in the drawings and specification. Refer to Section 013300 Submittals for schedule of Sampling, Testing and Certifications required. - the table is to assist the Contractor, but may not be all inclusive – additional submittals may be required by specific specification section:
TABLE 014100-1
Item
Subsection Certification or Test Required
Frequency 230593 Part 3 HVAC Testing & Balancing See Spec.
230713 3.5 Testing & Inspection See Spec 230716 3.5 Testing & Inspection See Spec 230719 3.8 Testing & Inspection See Spec
Attachment #2
TABLE 014100-1
Item
Subsection Certification or Test Required
Frequency 231123 3.6 Testing & Inspection See Spec 233300 3.2 Testing & Inspection See Spec 236200 3.3 Testing & Inspection, Start up See Spec 260519 3.5 Inspection See Spec.
PREPARATORY INSPECTION CHECKLIST
US FOREST SERVICE PROJECT___________________________DATE_________________
DEFINABLE FEATURE_________________________________________________________
APPLICABLE SPEC. SECTIONS: ________________________________________________
DESCRIPTION OF WORK: ______________________________________________________
PREPARTORY CHECKLIST: YES NO N/A
1. Are all submittals approved? ____ ____ ____
2. Is the preliminary work completed and approved? ____ ____ ____
3. Materials on site inspected and approved? ____ ____ ____
4. Applicable contract documents reviewed? ____ ____ ____
5. Installation instruction reviewed? ____ ____ ____
6. Work coordinated between Prime and Subs? ____ ____ ____
7. Review proposed method and schedule? ____ ____ ____
8. Review Job Hazard Analysis, is it accurate? ____ ____ ____ (explain any NO answers)
ATTENDEES_________________________________________________________________
COMMENTS/RESULTS: _______________________________________________________
Attachment #2
INITIAL INSPECTION CHECKLIST
US FOREST SERVICE PROJECT_________________________DATE___________________
DEFINABLE FEATURE OF WORK: ______________________________________________
YES NO N/A
Were only approved materials incorporated in the work?
Did the workmanship conform to contract requirements?
Did testing conform to the specifications? ____ ____ ____
Did work comply with safety requirements? ____ ____ ____
Were all differences with regard to interpretations resolved? ____ ____ ____ Explain any NO answers:
Inspection performed by:______________________________________________________
SECTION 017320 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes demolition and removal of the following:
1. Selected portions of a building.
2. Repair procedures for selective demolition operations.
3. Demolition and removal of selected site elements.
4. Salvage of existing items to be removed and recycled.
1.2 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.
B. Remove and Salvage: Detach items from existing construction and deliver them to Government.
C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and reinstall them where indicated.
D. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
1.3 PREINSTALLATION MEETINGS
A. Pre-demolition conference: Conduct conference at project site.
1.4 MATERIALS OWNERSHIP
A. Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain Government property, demolished materials shall become Contractor's property and shall be removed from Project site.
1.5 SUBMITTALS
A. Schedule of Selective Demolition Activities: Indicate detailed sequence of selective demolition and removal work, with starting and ending dates for each activity, interruption of utility services, use of stairs, and locations of temporary partitions and means of egress.
B. Qualification Data: For refrigerant recovery technician.
C. Pre-demolition Photographs or Video: Submit before Work begins.
D. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician.
1.6 CLOSEOUT SUBMITTALS
Attachment #2
A. Landfill Records: Indicate receipt and acceptance of refrigerant waste by a landfill facility licensed to accept this waste.
1.7 QUALITY ASSURANCE
A. Standards: Comply with ANSI A10.6 and NFPA 241.
B. Pre-demolition Conference: Conduct conference at Project site with contractor, subcontractors and Contracting Officer’s Representative.
C. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.
1.8 PROJECT CONDITIONS
A. Government will occupy portions of building immediately adjacent to selective demolition area.
Conduct selective demolition so Government’s operations will not be disrupted.
B. Conduct selective demolition so Government operations will not be disrupted. Provide not less than 72 hours' notice to CO of activities that will affect Government operations.
C. Notify COR of discrepancies between existing conditions and Drawings before proceeding with selective demolition.
D. Maintain access to existing building amenities, pathways, and other adjacent occupied or used facilities.
1. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the COR.
2. Maintain fire-protection system in service during selective demolition operations.
E. Conditions existing at time of inspection for bidding purpose will be maintained by Government as far as practical.
F. Hazardous Materials: It is not expected that hazardous materials are present in building to be selectively demolished.
1. If suspected hazardous materials are encountered, do not disturb; immediately notify the Contracting Officer’s Representative. Hazardous materials will be removed by the Government under a separate contract.
G. Storage or sale of removed items or materials on-site will not be permitted.
1.9 MEASUREMENT AND PAYMENT
A. There will be no separate measurement or payment for work in this section. Payment will be included at the contract unit price for items shown on the Schedule of Items.
PART 2 - PRODUCTS
2.1 REPAIR MATERIALS
A. Use repair materials identical to existing materials.
Attachment #2
1. If identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible.
2. Use materials whose installed performance equal or surpasses that of existing materials.
2.2 PEFORMANCE REQUIREMENTS
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that utilities have been disconnected and capped.
B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
C. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict.
Promptly submit a written report to CO.
D. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs.
3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS
A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.
B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.
1. Building manager will arrange to shut off indicated services/systems when requested by Contractor.
2. Arrange to shut off indicated utilities with utility companies.
3. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.
4. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated to be removed.
a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material.
c. Equipment to Be Removed: Disconnect and cap services and remove equipment.
d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
Attachment #2
e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to the Government.
f. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
g. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material.
C. Refrigerant: Remove refrigerant from mechanical equipment to be selectively demolished according to 40 CFR 82 and regulations of authorities having jurisdiction.
3.3 PREPARATION
A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.
1. Do not close or obstruct roads, without permission from CO. Provide alternate routes around closed or obstructed traffic ways if required by governing regulations.
2. Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction.
3. Protect existing site improvements, appurtenances, and landscaping to remain.
B. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.
C. Temporary Enclosures: Provide temporary enclosures for protection of existing building and construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.
3.4 POLLUTION CONTROLS
A. Dust Control: Use temporary enclosures, and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations.
B. Disposal: Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
1. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.
C. Cleaning: Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
3.5 SELECTIVE DEMOLITION, GENERAL
A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations.
1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.
2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.
Attachment #2
3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.
4. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.
B. Removed and Reinstalled Items:
1. Clean and repair items to functional condition adequate for intended reuse. Paint equipment to match new equipment.
2. Pack or crate items after cleaning and repairing. Identify contents of containers.
3. Protect items from damage during transport and storage.
4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.
C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by CO, items may be removed to a suitable, protected storage location during selective demolition [and cleaned] and reinstalled in their original locations after selective demolition operations are complete.
3.6 PATCHING AND REPAIRS
A. General: Promptly repair damage to adjacent construction caused by selective demolition operations.
B. Repairs: Where repairs to existing surfaces are required, patch to produce surfaces suitable for new materials.
1. Completely fill holes and depressions in existing masonry walls that are to remain with an approved masonry patching material applied according to manufacturer's written recommendations.
C. Finishes: Restore exposed finishes of patched areas and extend restoration into adjoining construction in a manner that eliminates evidence of patching and refinishing.
D. Floors and Walls: Where walls or partitions that are demolished extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish color, texture, and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance.
E. Ceilings: Patch and repair existing ceilings as necessary to provide an even-plane surface of uniform appearance.
3.7 DISPOSAL OF DEMOLISHED MATERIALS
A. General: Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.
B. Burning: Do not burn demolished materials.
C. Disposal: Transport demolished materials off Government property and legally disposes of them.
Attachment #2
3.8 CLEANING
A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.
END OF SECTION 017320
Attachment #2
SECTION 076200 - SHEET METAL FLASHING AND TRIM
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Formed roof-drainage sheet metal fabrications.
2. Formed low-slope roof sheet metal fabrications.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: For sheet metal flashing and trim.
1. Include plans, elevations, sections, and attachment details.
2. Distinguish between shop- and field-assembled work.
3. Include identification of finish for each item.
4. Include pattern of seams and details of termination points, expansion joints and expansion-joint covers, direction of expansion, roof-penetration flashing, and connections to adjoining work.
C. Samples: For each exposed product and for each color and texture specified.
1.4 CLOSEOUT SUBMITTALS
1.5 QUALITY ASSURANCE
A. Fabricator Qualifications: Employs skilled workers who custom fabricate sheet metal flashing and trim similar to that required for this Project and whose products have a record of successful in-service performance.
1.6 MEASUREMENT AND PAYMENT
A. No separate payment will be made for the work included under this section; rather payment shall be considered to be included in the items of work listed in the Schedule of Items.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. General: Sheet metal flashing and trim assemblies shall withstand wind loads, structural movement, thermally induced movement, and exposure to weather without failure due to
Attachment #2 defective manufacture, fabrication, installation, or other defects in construction. Completed sheet metal flashing and trim shall not rattle, leak, or loosen, and shall remain watertight.
B. Sheet Metal Standard for Flashing and Trim: Comply with NRCA's "The NRCA Roofing Manual" and SMACNA's "Architectural Sheet Metal Manual" requirements for dimensions and profiles shown unless more stringent requirements are indicated.
C. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes.
1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.
2.2 SHEET METALS
A. General: Protect mechanical and other finishes on exposed surfaces from damage by applying strippable, temporary protective film before shipping.
B. Metallic-Coated Steel Sheet: Provide zinc-coated (galvanized) steel sheet according to ASTM A 653/A 653M, G90 (Z275) coating designation; prepainted by coil-coating process to comply with ASTM A 755/A 755M.
1. Surface: Manufacturer's standard clear acrylic coating on both sides.
2. Exposed Coil-Coated Finish:
a. Two-Coat Fluoropolymer: AAMA 621. Fluoropolymer finish containing not less than 70 percent PVDF resin by weight in color coat. Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturers' written instructions.
3. Color: As selected by COR from manufacturer's full range.
2.3 UNDERLAYMENT MATERIALS
A. Felt: ASTM D 226/D 226M, Type II (No.