S150059_Cost_Estimate.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
BOULDER CREEK AOPs 2015 Federal contract opportunity
Solicitation number
AG-0261-S-15-0059
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

COST ESTIMATE

View the file

Other files for this federal contract opportunity

Other files attached to BOULDER CREEK AOPs 2015, newest first.
File Type Posted
S150059_Amend_000002.pdf PDF
S150059_Amend_000001.pdf PDF
SF150059.pdf PDF
S150059_Photo_Ant_50158.pdf PDF
S150059_Supp_Specs_Boulder.pdf PDF
S150059_Photo_Unnamed_50074.pdf PDF
S150059_Maps_and_Drawings.pdf PDF
WD_ID150086_01_02_2015_Highway.pdf PDF
S150059_Photo_Cold_Springs_50063_Option.pdf PDF
S150059_Photo_Cold_Springs_51248.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION COST ESTIMATE BREAKDOWN
PLEASE COMPLETE PAGE 2
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED CONTRACT PRICE
AG-0261-S-15-0059 BOULDER CREEK AOPs 2015
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
Payette National Forest, New Meadows Ranger District
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURAVERAGETOTALDIRECTLINE
NOMEASUREMANDAYSRATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
BASE ITEM 50074-MP 11.4 Unnamed Tributary to Boulder Creek
151-01aMobilizationLump Sum1.000.000.000.00
152-21aConstruction Survey and StakingLump Sum1.000.000.000.00
157-13aSoil Erosion & Pollution ControlLump Sum1.000.000.000.00
203-05aRemoval of Structures and Obstructions-Remove from ProjectLump Sum1.000.000.000.00
209-11aStructure Excavation and BackfillLump Sum1.000.000.000.00
308-09a*Roadway Aggregate Surfacing (Government Furnished), Compaction Method 1Cubic Yard21.000.000.000.00
533-01aPrecast 11' Concrete Box (including wingwalls, footings and curb), Design, Fabricate, Transport, and InstallLump Sum1.000.000.000.00
625-03aTurf Establishment (Government Furnished Seed)Lump Sum1.000.000.000.00
633-06aObject MarkersEach4.000.000.000.00
648-05aPlace Streambed Simulation Rock, Bed Class 12, Method ALump Sum1.000.00
TOTALS0.000.000.000.00
MATH CHECK0.00
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURAVERAGETOTALDIRECTLINE
NOMEASUREMANDAYSRATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
BASE ITEM 50158-MP 1.06 Ant Basin
151-01bMobilizationLump Sum1.000.000.000.00
152-21bConstruction Survey and StakingLump Sum1.000.000.000.00
157-13bSoil Erosion & Pollution ControlLump Sum1.000.000.000.00
203-05bRemoval of Structures and Obstructions-Remove from ProjectLump Sum1.000.000.000.00
209-11bStructure Excavation and BackfillLump Sum1.000.000.000.00
251-01b*Placed RipraP, Class 3Cubic Yard9.000.000.000.00
308-09b*Roadway Aggregate Surfacing (Government Furnished), Compaction Method 1Cubic Yard37.000.000.000.00
552-01bStuctural Concrete Class A for Precast FootingsLump Sum1.000.000.00
603-01b16'0" Span 8'3" Rise, Structural Plate Pipe Arch, 12 gage thickinessFoot74.000.000.000.00
625-03bTurf Establishment (Government Furnished Seed)Lump Sum1.000.000.000.00
648-05bPlace Streambed Simulation Rock, Bed Class 14, Method ALump Sum1.000.000.000.00
TOTALS0.000.000.000.00
MATH CHECK0.00
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURAVERAGETOTALDIRECTLINE
NOMEASUREMANDAYSRATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
BASE ITEM 51248-MP 0.69 Cold Springs
151-01cMobilizationLump Sum1.000.000.000.00
152-21cConstruction Survey and StakingLump Sum1.000.000.000.00
157-13cSoil Erosion & Pollution ControlLump Sum1.000.000.000.00
203-05cRemoval of Structures and Obstructions-Remove from ProjectLump Sum1.000.000.000.00
209-11cStructure Excavation and BackfillLump Sum1.000.000.000.00
251-01c*Placed Riprap, Class 3Cubic Yard9.000.000.000.00
308-09c*Roadway Aggregate Surfacing (Government Furnished), Compaction Method 1Cubic Yard37.000.000.000.00
552-01bStructural Concrete, Class A for Precast FootingsLump Sum1.000.000.000.00
603-01b12" Span 6"3" rise, Structural Plate Pipe Arch, 12 Gage ThicknessFoot62.000.000.000.00
625-03cTurf Establishment (Government Furnished Seed)Lump Sum1.000.000.000.00
648-05cPlace Streambed Simulation Rock, Bed Class 14, Method ALump Sum1.000.000.000.00
TOTALS0.000.000.000.00
MATH CHECK0.00
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURAVERAGETOTALDIRECTLINE
NOMEASUREMANDAYSRATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
OPTION ITEM 50063-MP 1.17 Cold Springs
151-01dMobilizationLump Sum1.000.000.000.00
152-21dConstruction Survey and StakingLump Sum1.000.000.000.00
157-13dSoil Erosion & Pollution ControlLump Sum1.000.000.000.00
203-05dRemoval of Structures and Obstructions-Remove from ProjectLump Sum1.000.000.000.00
209-11dStructure Excavation and BackfillLump Sum1.000.000.000.00
251-11d*Placed Riprap, Class 3Cubic Yard9.000.000.000.00
308-09d*Roadway Aggregate Surfacing (Government Furnished), Compaction Method 1Cubic Yard37.000.000.000.00
552-01dStuctural Concrete Class A for Precast FootingsLump Sum1.000.000.000.00
603-01d16'0" Span 6'3" Rise, Structural Plate Pipe Arch, 12 gage thickinessFoot48.000.000.000.00
625-03dTurf Establishment (Government Furnished Seed)Lump Sum1.000.000.000.00
648-05dPlace Streambed Simulation Rock, Bed Class 14, Method ALump Sum1.000.000.000.00
TOTALS0.000.000.000.00
MATH CHECK0.00

AG-0261-S-15-0059

Attachment 8

INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit
itemizing of all direct costs.
Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF,
linear feet - LF, board feet - BF, each - EA, pound - LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the
Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise,
the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of
significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE:In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows
TOTAL MATERIAL COSTS$

TOTAL LABOR COSTS $

TOTAL OTHER DIRECT COSTS $

TOTAL DIRECT COSTS $

OVERHEAD % $

SUBTOTAL $

PROFIT % $

TOTAL PRICE $

DATE FIRM NAME

TITLEBY
(Signature)
INSTRUCTIONS TO OFFERORS
1.The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror may be required to submit a certificate of current cost or pricing data
2.In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and
analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a.The existing, verifiable data.
b.The judgmental factors applied in projecting from known data to the estimate, and
c.The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3.When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer his authorized representative upon request.
4.By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection
with any negotiations prior to contract award.

AG-0261-S-15-0059

Attachment 8

File details come from the government source that posted it. Updated .