S150059_Amend_000002.pdf
PDF 751 KB Posted
- Attached to
- BOULDER CREEK AOPs 2015 Federal contract opportunity
- Solicitation number
- AG-0261-S-15-0059
About this file
SF30 AND ATTACHMENT
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S150059_Amend_000001.pdf | ||
| SF150059.pdf | ||
| S150059_Photo_Ant_50158.pdf | ||
| S150059_Supp_Specs_Boulder.pdf | ||
| S150059_Photo_Unnamed_50074.pdf | ||
| WD_ID150086_01_02_2015_Highway.pdf | ||
| S150059_Photo_Cold_Springs_50063_Option.pdf | ||
| S150059_Cost_Estimate.xlsx | XLSX spreadsheet | |
| S150059_Maps_and_Drawings.pdf | ||
| S150059_Photo_Cold_Springs_51248.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-0261-S-15-0059
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
BOISE ID 83709-1663
1249 S VINNELL WAY STE 200
ATTN TANY ARNBERGER
SW IDAHO-NEVADA ACQUISITION CENTER
BOISE ID 83709-1663
1249 S VINNELL WAY STE 200
ATTN TANYA ARNBERGER
SW IDAHO-NEVADA ACQUISITION CENTER
05/19/2015000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/23/2015
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
BOULDER CREEK AOPs 2015, NEW MEADOWS RD, PAYETTE NF
THE PURPOSE OF THIS AMENDMENT IS TO CLARIFY BID GUARANTEE REQUIREMENTS; CLARIFY SPECIAL
SCHEDULE REQUIREMENTS; CLARIFY DISPOSAL AND DECKING OF MERCHANTABLE LOGS; AND TO PROVIDE
THE ATTENDANCE ROSTER FOR THE SITE VISIT HELD ON MAY 14, 2015.
PLEASE SEE ATTACHMENT 1.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
CLARIFICATION REGARDING BID GUARANTEE
Add the following to Section K – Representations, Certifications, and Other Statements of Offerors or
Respondents:
52.228-1 Bid Guarantee (SEPT 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the
United States. The Contracting Officer will return bid guarantees, other than bid bonds --
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $N/A, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
CLARIFICATION REGARDING THE PERIOD OF PERFORMANCE
Terms and Conditions, Section C, Special Schedule Requirements – Remove paragraph four and replace with the following:
The two culverts on Cold Springs Creek (50063 mp 1.17 and 51248 mp 0.69) are behind two AOP Projects
(51251-0.2 Star Creek and 50063-0.1 Bull Horn) that are part of the Boulder Creek 2014 AOP contract. The
2014 AOP contract has been modified so that Star Creek and Bull Horn AOPs will be substantially complete and available for traffic to pass over the new structures by July 15, 2015. The successful contractor for this solicitation will not have access to the two Cold Springs culverts during the approximately 3 to 4 weeks that the
Star Creek and Bull Horn AOPS are being constructed from approximately June 8 to July 15, 2015.
CLARIFICATION REGARDING DISPOSAL OF DECKING
Supplemental Specs, Section 201, 201.06 Disposal – Add the following:
203.05_R04F12_5_15_2015
Dispose of merchantable logs according to 203.05(n), Decking.
AG-0261-S-15-0059, Amendment 000002 Attachment 1
Supplemental Specs, Section 203, 203.05 Disposing of Materials – Add the following:
203.05_R04F12_5_15_2015
(n) Decking of logs. Limg and deck logs that meet utilization standards at locations approved by the CO outside the clearing limits. Utilization standards are as follows:
DBH: 8 inches minimum ( 7 inches for lodgepole pine)
8.5 foot minimum length
6 inches minimum top diameter
File details come from the government source that posted it. Updated .