Construction_Cost_Estimate_Breakdown0031.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Upper Dewey & Upper Joker Culvert Replacement Federal contract opportunity
Solicitation number
AG-0261-S-13-0031
Issued by
Department of Agriculture Forest Service R4-Intermountain Region

About this file

Attachment 6 - Construction Cost Estimate Breakdown

View the file

Other files for this federal contract opportunity

Other files attached to Upper Dewey & Upper Joker Culvert Replacement, newest first.
File Type Posted
Amend_000001.pdf PDF
Photos_Upper_Joker.pdf PDF
WageDetermination_ID130010.pdf PDF
Joker_DeweyMapDrawings.pdf PDF
Specs_UpperJokerUpperDewey.pdf PDF
AG0261S130031_SF1442_T_and_C.pdf PDF
Photo_Upper_Dewey.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION COST ESTIMATE BREAKDOWN
PLEASE COMPLETE PAGE 2
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED CONTRACT PRICE
Upper Dewey Creek and Upper Joker Creek Culvert Replacement
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
Payette National Forest, Council Ranger District
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURAVERAGETOTALDIRECTLINE
NOMEASUREMANDAYSRATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Upper Joker
151-01aMobilizationLump Sum10.000.000.00
152-21aConstruction survey and staking,Lump Sum10.000.000.00
157-13aSoil Erosion & Pollution ControlLump Sum10.000.000.00
203-05aRemoval of structures and obstructions, remove from projectLump Sum10.000.000.00
209-01aStructure excavationLump Sum10.000.000.00
251-01aPlaced Riprap, Class 3Cubic Yard180.000.000.00
308-09a*Roadway aggregate surfacing (commercial source), compaction method 2.Cubic Yard330.000.000.00
552-01aStructural Concrete Class A for precast footingsLump Sum10.000.000.00
603-01a12’-0” span 6’-3” rise, structural plate pipe arch, 12 gage thicknessFoot440.000.000.00
625-03aTurf establishment, (Government Supplied seed)Lump Sum10.000.000.00
648-02aPlaced fish rest stop rock, channel rock size 2Each200.000.000.00
648-05aPlaced streambed simulation rock, Bed Class 10, Method ALump Sum10.000.000.00
TOTALS0.000.000.000.00
MATH CHECK0.00
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURAVERAGETOTALDIRECTLINE
NOMEASUREMANDAYSRATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Upper Dewey
151-01bMobilizationLump Sum10.000.000.00
152-21bConstruction survey and staking,Lump Sum10.000.000.00
157-13bSoil Erosion & Pollution ControlLump Sum10.000.000.00
203-05bRemoval of structures and obstructions, remove from projectLump Sum10.000.000.00
209-01bStructure excavationLump Sum10.000.000.00
308-09b*Roadway aggregate surfacing (commercial source), compaction method 2.Cubic Yard410.000.000.00
553-01bPrecast concrete Bridge (indluding wingwalls, footing and curb) Design, Fabricate, Transport and InstallLump Sum10.000.000.00
625-03bTurf Establishment, (Government Supplied seed)Lump Sum10.000.000.00
633-06bObject MarkersEach40.000.000.00
648-05bPlaced streadbed simulation rock, Bed Class 10, Method ALump Sum10.000.000.00
TOTALS0.000.000.000.00
MATH CHECK0.00
INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit
itemizing of all direct costs.
Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF,
linear feet - LF, board feet - BF, each - EA, pound - LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the
Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise,
the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of
significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE:In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows
TOTAL MATERIAL COSTS$

TOTAL LABOR COSTS $

TOTAL OTHER DIRECT COSTS $

TOTAL DIRECT COSTS $

OVERHEAD % $

SUBTOTAL $

PROFIT % $

TOTAL PRICE $

DATE FIRM NAME

TITLEBY
(Signature)
INSTRUCTIONS TO OFFERORS
1.The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror may be required to submit a certificate of current cost or pricing data
2.In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and
analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a.The existing, verifiable data.
b.The judgmental factors applied in projecting from known data to the estimate, and
c.The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3.When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer his authorized representative upon request.
4.By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection
with any negotiations prior to contract award.

File details come from the government source that posted it. Updated .