AMENDMENT 1.pdf

PDF 376 KB Posted

Attached to
REDFISH LAKE LIFT STATION
Solicitation number
AG-0261-S-10-0075
Issued by

About this file

AMENDMENT 1

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 6

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NUMBER (if applic.)

Amendment No. 1 08/05/2010

6. ISSUED BY: CODE: 7. ADMINISTERED BY (If other than 6.): CODE:

USDA Forest Service SW Idaho/Nevada Acquisition Center 1249 South Vinnell Way, Suite 200 Boise, ID 83709-1663

8. NAME AND ADDRESS OF CONTRACTOR 9A. AMENDMENT OF SOLICITATION NUMBER

[X] AG-0261-S-10-0075

9B. DATED (see item 11) 07/19/2010

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (see item 13)

CODE FACILITY

11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS

[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [ X] is not extended the following methods: (a) By completing Items 8 and 15, and returning

. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and copy(s) of the amendment; (b) By acknowledging receipt of this amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amend-ment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if applicable)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

[ ] A. THIS CHANGE ORDER IS PURSUANT TO: FAR 52.243-5 Changes and Changed Conditions

The changes set forth in Item 14 are made in the Contract Order Number in Item 10A.

[ ] B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

[ ] C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

[ ] D. OTHER (specify type of modification and authority)

E. Contractor [ ] is, [X ] is not required to sign this document and return _____ ___

14. DESCRIPTION OF AMENDMENT/MODIFICATION

copy(s) to the issuing office.

REFER TO REDFISH LAKE LIFT STATION, SAWTOOTH NRA, STANLEY RANGER STATION and amend as follows:

SEE ATTACHED DOCUMENTS

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (type or print)

Karen L. Morthlland , Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

__________________________ BY:________________________

(Signature of authorized person to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 SF 30 (REV. 10/83)

PRESCRIBED BY GSA/PREVIOUS EDITION UNUSABLE FAR (48 CFR) 53.243

Redfish Lake Sewer System Improvements Project Pre-Bid Questions and Answers

The following are questions that were proposed during the pre-bid site visit along with questions received by either email or phone. The answers to each question are shown in red.

1. Will the existing electrical transfer switch be removed and replaced?

Answer: No, the existing electrical transfer switch will not be replaced and must be reinstalled in the new building.

2. Is there an existing backup generator and if so will it be replaced?

Answer: Yes, there is an existing generator. No, it will not be replaced.

3. Is there a high probability of having ground water in the trenches that will be excavated near the lake and the pumpstation/restroom building?

Answer: Yes, excavations performed to repair the sewer pipe in these areas in the past have revealed ground water in the trenches. Even during the later parts of the year.

4. Does payment for electrical work include everything from the meter to the structure or does payment also include work required prior to the meter?

Answer: Refer to Section 262713, subsection 1.4. It is the responsibility of the contractor to coordinate with the utility company to determine what components they furnish. All other costs for materials and labor not furnished by the utility company, whether it is after or before the meter, shall be the responsibility of the contractor and should be included in their quote for this type of work.

5. Does the base bid include any existing manhole repairs?

Answer: No, all repairs to existing manholes are included in Option #1.

6. How accurate are the distances from the manholes to the pipe crack repairs indicated on sheets 4 and 5?

Answer: The distances listed on the plans were recorded from a T.V. inspection performed a few years ago on the pipe sections needing repaired. For bidding purposes assume these distances to the sections of pipes needing replaced are still accurate. The lengths of pipe needed to repair the damaged sections extend several feet beyond the damaged areas measured during the T.V. inspection.

7. Do we need to install bollards to protect the new propane tank?

Answer: No, contract does not include the installation of bollards around the new propane tank.