Amendment_0001-9117.pdf
PDF 214 KB Posted
- Attached to
- Region 1 IDIQ Light Fixed Wing Services Federal contract opportunity
- Solicitation number
- AG-024B-S-17-9116
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FBO_Award_Summary.pdf | ||
| AG-024B-S-17-9116_IDIQ_LFW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 4
2. AMENDMENT/MODIFICATION NO. /3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 5 May 2017
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA Forest Service – Contracting National Interagency Fire Center 3833 S. Development Ave., Suite 1100 Boise, ID 83705
Same as Block 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
AG-024B-S-17-9116
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE 5 May 2017
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
PN5LD2 (1502)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Region 1 IDIQ Light Fixed Wing Contract.
The purpose of this amendment is to amend section B-3 to add item 4 and 5, and to amend section B-11. See additional pages for details. All other terms and conditions remain unchanged.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
DAVID P HERSHEY
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
B-3 QUANTITY AND PERFORMANCE PERIOD
Required Items
Mandatory Performance Period
Net Days
Optional Period
Item #1 1 July through 18 September 80 Outside Mandatory Period
Item #2 1 July through 18 September 80 Outside Mandatory Period
Item #3 1 July through 18 September 80 Outside Mandatory Period
Item #4 1 July through 18 September 80 Outside Mandatory Period
Item #5 1 July through 18 September 80 Outside Mandatory Period
Note: The vendor is required to respond within three hours of placement of an initial order. Alternate response times may be acceptable as negotiated with the government at the time of order.
B-11 OPERATIONS IN CANADA, MEXICO, CARIBBEAN OR ALASKA WILL BE REQUIRED IN
THE FOLLOWING: (THOSE THAT ARE CHECKED)
ALASKA CARIBBEAN CANADA MEXICO
THE OPERATOR MUST HAVE IN THEIR OP SPECS AUTHORIZATION TO
OPERATE IN ALL AREAS CHECKED ABOVE.
ADDITIONAL REQUIREMENTS
Selected Additional Requirements. The following additional requirements may be required to meet local needs. When the option block is checked, the operator shall provide and maintain the checked item. If an item is checked and already is a required item, then the checked item is an additional requirement. The operating capabilities of this equipment shall be that as defined below.
CONTRACTOR FURNISHED SPECIAL
REQUIREMENTS
Item #1
Item #2
Item #3
Item #4
Item #5
Resource Recon Avionics, FM Option___ or higher (See C-8 (a)(3) NOTE: Resource RECON AIRCRAFT conducting forest health missions DO NOT
REQUIRE A P25 COMPLIANT FM RADIO.
Fire Recon Avionics, FM Option ____ or higher (See C-8 (a)(4))
Air Tactical Avionics, Type ____ or better (See C-8 (a)(5))
T4 T2** T2 T3 T3
Additional VHF-AM Radios: Total A/C Qty: ___ (See C-8 (b)(1)(i)) NOTE: ATGS Aircraft ordered to R5 must be equipped with 3 AM radios to accept a resource order to R5
VHF-FM Radio in lieu of the Aux FM requirement:
Total A/C VHF-FM Qty: (See C-8 (b)(1)(ii))
Additional VHF-FM Radios: Total A/C Qty: (See C-8 (b)(1)(ii)) NOTE: ATGS Aircraft ordered to R5 must be equipped with 3 FM radios.
VHF-FM Programming Ports (See C-8 (b)(5)(xi))
Non-Standard Radio, Type: (See C-8 (b)(1)(iv))
Satellite Communications System:
Minutes/Month____ (See C-8 (b)(1)(v))
Drop Cord for SIC/observer (See C-8(b)(2)(ii)(B))
Drop Cord for aft Instructor position (See C-8
(b)(2)(ii)(B))
Push-To-Talk (PTT) cord for SIC/observer (TELEX PT-300 with VOX or equivalent)
Push-To-Talk (PTT) cord for aft Instructor (TELEX PT-300 with VOX or equivalent)
Aft Audio Control System (See C-8 (b)(2)(ii)(C))
Aeronautical GPS in lieu of a portable GPS (See C- 8 (b)(3)(i)(A))
GPS with Moving Map (See C-8 (b)(3)(i)(C))
GPS Data connector (See C-8 (b)(5)(xii))
External Portable Aviation GPS Antenna, GPS Model: (See C-8 (b)(5)(xiii))
Traffic Advisory System (TAS) (See C-8 (b)(4)(v))
ADS-B IN and OUT (See C-8 (b)(4)(vi))
Radar Altimeter (See C-8 (b)(5)(ii))
Autopilot (See C-8 (b)(5)(i))
Multi-Function Display (MFD) (See C-8 (b)(5)(iii))
Auxiliary Power Source (3 Pin) (See C-8(b)(5)(v))
Dual USB charging port, Qty:__1_ Users:
(See C-8 (b)(5)(xiv))(in addition to training platform requirement in Exhibit 1)
X X X X X
CONTRACTOR FURNISHED SPECIAL
REQUIREMENTS
Item #1
Item #2
Item #3
Item #4
Item #5
Supplemental Antennas, Qty:__ /Band:___(See C- 8(b)(5)(vi))
Supplemental Radio Kit Provisions (See C-8 (b)(5)(vii))
Supplemental Air Attack Kit Provisions(See C- 8(b)(5)(viii))
TSO approved VOR/Localizer, Qty: .
TSO approved Glideslope, Qty: .
TSO approved DME, Qty: {Not required if GPS is IFR with current database}
TSO approved Three Light Marker Beacon System, Qty: .
Satellite Weather system with XM Aviator subscription or equivalent
Provisions for IFR operation meeting 14 CFR
135.163 & 135.165
Single Engine – (# of seats: ____) (minimum) 4 4 4 4 4
Multi Engine – (# of seats: ____)
Large Cargo Doors
High Wing X X X X X
Low Wing - Unobstructed vertical 140-degree view copilot seat
Air Conditioning - Manufacturer or STC installed air conditioning system that utilizes Freon as a cooling agent. This system must be fully functional as designed and provide cooling to the interior confines of the aircraft (A portable or stand-alone air cycle system is not acceptable)
Capability to carry HAZMAT
Turbocharged
Turboprop
Pressurized
Relief Pilot(s) Available
Infrared
Aerial Photography
TCAS/TCAD (see insert para no.)
Floats: 1. Amphibious 2. Straight
Other
Low Level (Recon and Surveillance)
Mountainous Terrain Flight X X X X X
Night Vision Goggle Operations
Mountain Remote Authorization X
Fire Surveillance/ Reconnaissance X X X X X
Air Tactical Coordination (Air Attack) X X X X X
**Note: Operational capability of Air Tactical Type 2 can be met for purposes of this contract only by addition of all or a portion of a supplemental radio kit. For example:
“Type 3 Air Tactical with supplemental kit for Type 2 Air Tactical capability” or similar would be acceptable to be responsive under this contract. However, supplemental kits will not raise the Air Tactical level of an aircraft for purposes of dispatching to assignments.
File details come from the government source that posted it. Updated .