shakeshotspringplans9-2-14A01.pdf
PDF 1 MB Posted
- Attached to
- Chief Shakes Hot Springs Maintenance Federal contract opportunity
- Solicitation number
- AG-0112-S-14-0033
About this file
Amended Plan Sheets
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A01.pdf | ||
| PLANS.pdf | ||
| lpta_questionnaire.pdf | ||
| General_Decision_Number.pdf | ||
| LPTA_Factor_1_form.pdf | ||
| Solicitation.pdf | ||
| Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N O R T H
VICINITY MAP
PROJECT LOCATION
132°136°138°140°142° 134°
JUNEAU
Craig
132°
KEY MAP
GULF OF ALASKA
56°
58° Sitka
138°
60°
Yakutat
ALAS
KA
142°
62°
C
AN
AD
A
140°
Skagway
136° 134°
56°
54°
Ketchikan
Wrangell
Petersburg
60°
58°
130° 128°
CHIEF SHAKES
HOT SPRINGS MAINTENANCE
INDEX TO SHEETS
NO. DESCRIPTION
SITE OVERVIEW
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
CHIEF SHAKES HOT SPRINGS MAINTENANCE COVER SHEET
WRANGELL RANGER DISTRICT
MRC 8/3/14
MRC 8/25/14
DLM 8/27/14
9/2/14 DLM COMMENTS MRC
acad.DWG 1 8
FRAMING PLANS
COVER SHEET
FOUNDATION REPAIR DETAIL05
INDOOR TUB ELEVATIONS06
GENERAL NOTES
INDOOR TUB ELEVATIONS07
CHIEF SHAKES HOT SPRINGS
THIS PROJECT IS LOCATED IN THE
STIKINE-LECONTE WILDERNESS WHICH
PROHIBITS THE USE OR POSSESSION OF
MOTORIZED TOOLS OR EQUIPMENT,
INCLUDING BATTERY POWERED TOOLS, WITH
THE EXCEPTION OF MOTORIZED BOATS.
08 OUTDOOR TUB ELEVATIONS SKETCH
Amendment 01
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
CHIEF SHAKES HOT SPRINGS MAINTENANCE GENERAL NOTES
WRANGELL RANGER DISTRICT
AM, MRC 8/3/14
MRC 8/3/14
DLM 8/27/14
9/2/14 DLM COMMENTS MRC
2 8
NOTES:
1. GOVERNMENT WILL FURNISH THE FOLLOWING MATERIAL AT WRANGELL. EXCESS UNUSED MATERIAL
WILL BE RETURNED TO GOVERNMENT AT WRANGELL RANGER DISTRICT (525 BENNETT STREET,
WRANGELL, AK) AT END OF CONTRACT. TOOLS WILL BE RETURNED TO GOVERNMENT.
GOVERNMENT FURNISHED MATERIAL
# DESCRIPTION NOTES QUANTITY
1 ROOF DECKING
2"X6"X18'
CEDAR, T&G, TIGHT KNOT, S4S, BEVELED
EDGES
90 BOARDS
2 ROOF DECKING
2"X6"X14'
CEDAR, T&G, TIGHT KNOT, S4S, BEVELED
EDGES
60 BOARDS
3 ROOF SHAKES 24"X3
4" HAND SPLIT HEAVIES 1100 SF COVERAGE,
50 BUNDLES
4 CEDAR ROOF
UNDERLAYMENT
ASPHALT SATURATED ORGANIC FELT NO.
30 ASTM D 226 (TYPE30) 36" WIDE
300 LINEAR FEET
5 CEDAR ROOF
UNDERLAYMENT
ASPHALT SATURATED ORGANIC FELT NO.
30 ASTM D 226 (TYPE 30) 18" WIDE
1500 LINEAR FEET
6 GALVANISHED
STEEL FLASHING
12" WIDE X 0.010" THICKNESS 300 LINEAR FEET
7 STAINLESS STEEL
STRAPPING FOR
WOOD POST
3/4" WIDE X 0.03 THICKNESS, TYPE 201,
STAINLESS STEEL
400 LINEAR FEET
8 SEALS FOR
STAINLESS STEEL
STRAPPING
3/4" WIDE 200 PIECES
9 STRAPPING
TENSION TOOL
10 NAILS FOR SHAKES 6D 2" HOT DIP GALVANIZED 50 LBS
11 NAILS FOR DECKING 20D 4" HOT DIP GALVANIZED 100 LBS
12 STAPES FOR FELT STAINLESS STEEL STAPLES AND STAPLE
GUN
6000 STAPLES
13 SONOTUBE
CONCRETE FORM
16" DIAM. X 4' TUBES 8 TUBES
14 #4 REBAR 100 LINEAR FEET
15 #3 REBAR 360 LINEAR FEET
16 REBAR TIE WIRE 16 GAUGE 4LB ROLL 4 ROLLS
17 REBAR SHEARS 1
18 REBAR BENDER 1
19 PORTLAND
CONCRETE MIX
QUIKCRETE 5000 CONCRETE MIX 5500 LBS, 80LB AND
60LB SACKS
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
CHIEF SHAKES HOT SPRINGS MAINTENANCE SITE OVERVIEW
WRANGELL RANGER DISTRICT
MRC 8/3/14
KF. RICHTER 1981
DLM 8/27/14
8/27/14 DLM COMMENTS MRC
ACAD.DWG
3 8
NOTES:
1. MAP IS FOR REFERENCE ONLY. ONLY INDOOR TUB & CHANGING ROOM STRUCTURE
AND OUTDOOR CHANGING ROOM STRUCTURE TO BE WORKED.
2. TENT PLATFORMS DO NOT EXIST.
3. SCALES ARE NOT ACCURATE
NOT IN CONTRACT
OUTDOOR TUB
CHANGING ROOM
STRUCTURE: ROOF
WORK
INDOOR TUB AND INDOOR
TUB CHANGING ROOM
STRUCTURE: ROOF AND
FOUNDATION WORK
EXISTING CEDAR COLUMNS
UNDER HOT TUB
STRUCTURE TYP., REPAIR
FOUNDATION PER SHEET 5.
14'-6 1/4"
'-5
3'-6"
'-1
/2
1'-6" 6'-0"
MAXIMUM SPANTYP.
SIMPSON PC44
4X6 BEAM
V A R
IE
S
" T O
SCALE IN FEET
4 0 4 8
LOWER DECK FRAMING PLAN
A
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
CHIEF SHAKES HOT SPRINGS MAINTENANCE FRAMING PLANS
WRANGELL RANGER DISTRICT
A. ETTER 07/05
MRC 8/3/14
ACAD.DWG
4 8
UPPER DECK FRAMING PLAN
A
SCALE IN FEET
2 0 2 4
TYPICAL SECTION A-3, EXISTING FOUNDATION
FOR REFERENCE ONLY NOT IN CONTRACT
NOTES:
1. REPAIR CEDAR POST COLUMNS UNDER HOT TUB STRUCTURE
PER SHEET 5. DO NOT REPAIR POSTS UNDER CHANGING
ROOM. TOTAL NUMBER OF COLUMNS FOR FOUNDATION
REPAIR: 8.
2. EXISTING TREATED WOOD 4X4 POSTS AND ASSOCIATED
FOUNDATION IN SECTION A-3 AND FRAMING PLANS ARE
SHOWN FOR REFERENCE ONLY.
3. SUPPORT BUILDING DURING FOUNDATION WORK TO AVOID
STRUCTURE MOVEMENT.
4. ALLOW CONCRETE TO CURE 14 DAYS BEFORE ALLOWING
STRUCTURAL LOAD.
5. EXISTING FOOTINGS UNDER CEDAR POSTS ARE
APPROXIMATELY 19" X 19" SQUARE
SAME POST, REPAIR
PER SHEET 5
SAME POST, REPAIR PER SHEET 5
REPAIR PER SHEET 5
REPAIR PER SHEET 5
EXISTING CONCRETE LANDING
EXISTING CONCRETE LANDING
STAIRS
CHANGING ROOM POSTS
DO NOT NEED REPAIR
9"
9"
5" TAILS TYPICAL
#3 REBAR HOOP TYPICAL
DIMENSIONS. REBAR SHEARS AND
BENDING TOOL FURNISHED BY
GOVERNMENT PER SHEET 2.
#3 REBAR HOOP
ALTERNATE SPLICE
LOCATIONS
#4 X 18" REBAR
CENTER IN PILLAR
16" DIAM.
TOP VIEW
SIDE VIEW
EXISTING CONCRETE FOUNDATION. CLEAN
AND PREPARE SURFACE FOR NEW CONCRETE
INTERFACE. NO DEBRIS OR LOOSE MATERIAL.
2 -#3 REBAR HOOPS
AT TOP AND BOTTOM,
1-#3 REBAR HOOP AT
CENTER
INSTALL 16" DIAM. CONCRETE
PILLAR 18" TALL. ALLOW
CONCRETE 14 DAYS CURE
BEFORE STRUCTURE LOAD.
#4 X 18" REBAR HALF
IN CONCRETE
AT LEAST 2"
CONCRETE COVER
4- #4 REBAR
VERTICAL EACH
CORNER
EXISTING STEEL PIN IN EXISTING
CONCRETE PAD. CLEAN AND
PREPARE FOR NEW CONCRETE
AT LEAST 2"
CONCRETE COVER
EXISTING GROUND
EXISTING CONCRETE
FOUNDATION,
APPROXIMATELY 19" X
19" NOT TO SCALE
EXISTING GROUND
CUT OFF 18" FROM EXISTING CEDAR
POST AND INSTALL REPLACEMENT 16"
DIAM. CONCRETE PILLAR SEE DETAIL.
APPROPRIATELY DISPOSE OF CEDAR
POST WASTE.
INSTALL TWO 34" WIDE STAINLESS
TENSIONED STEEL BANDS @ 2"
AND 8" ABOVE CONCRETE.
EXISTING BUILDING
REBAR LOOPS
18"
#4 STEEL REBAR IN
CENTER OF TIMBER POST
ENSURE EXISTING STRUCTURE
DOES NOT SETTLE OR MOVE
DURING WORK
AT LEAST 2" CONCRETE
COVER FOR LOOPS.
CORNER VERTICAL REBAR
MAY SIT ON EXISTING
CONCRETE
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
CHIEF SHAKES HOT SPRINGS MAINTENANCE FOUNDATION REPAIR DETAIL
WRANGELL RANGER DISTRICT
AM, MRC 8/25/14
MRC 8/7/14
DLM 8/27/14
9/2/14 DLM COMMENTS MRC
ACAD.DWG
5 8
CONCRETE PILLAR DETAIL FOUJNDATION REPAIR DETAIL
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
CHIEF SHAKES HOT SPRINGS MAINTENANCE INDOOR TUB ELEVATIONS
WRANGELL RANGER DISTRICT
MRC 8/3/14
K.F. RICHTER 1981
DLM 8/27/14
9/2/14 DLM COMMENTS MRC
ACAD.DWG
6 8
SOUTH ELEVATION 1" = 4' WEST ELEVATION 1" = 4'
ROOFING NOTES:
1. APPROXIMATE TOTAL ROOF AREA TO BE WORKED AT INDOOR TUB AND CHANGING
ROOM STRUCTURE: 800 SF.
2. ROOF PITCH 8:12
3. REMOVE AND APPROPRIATE DISPOSE EXISTING ROOF COMPONENTS: DECKING,
UNDERLAYMENT, SHAKES, AND FLASHING. REPLACE WITH NEW DECKING,
UNDERLAYMENT, SHAKES, AND FLASHING.
4. NEW ROOFS TO EXTEND TO EDGE OF RAFTERS.
REPLACE ALL ROOFS
EXTEND NEW ROOFS TO EDGE
OF EXISTING RAFTERS,
APPROXIMATELY 6"
INDOOR TUB STRUCTURE
INDOOR TUB CHANGING ROOM
TYP. CEDAR POST COLUMN
FOR FOUNDATION REPAIR,
SEE SHEETS 4 & 5.
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
CHIEF SHAKES HOT SPRINGS MAINTENANCE INDOOR TUB ELEVATIONS
WRANGELL RANGER DISTRICT
MRC 8/3/14
KF RICHTER 1981
DLM 8/27/14
9/2/14 DLM COMMENTS MRC
ACAD.DWG
7 8
EAST ELEVATION 1" = 4' NORTH ELEVATION 1" = 4'
ROOF PITCH 8:12
.INDOOR HOT TUB CHANGING ROOM
CEDAR POST TYP.
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
CHIEF SHAKES HOT SPRINGS MAINTENANCE OUTDOOR TUB ELEVATION SKETCHES
WRANGELL RANGER DISTRICT
MRC 8/3/14
MRC 8/26/14
DLM 8/27/14
9/2/14 DLM COMMENTS MRC
ACAD.DWG
8 8
SOUTH ELEVATION SKETCH EAST ELEVATION SKETCH
ROOF PITCH 4:12
REPLACE ROOF
NOTES:
1. APPROXIMATE ROOF AREA TO BE WORKED AT OUTDOOR TUB CHANGING ROOM: 150 SF.
2. ELEVATION SKETCHES ARE ROUGH REPRESENTATIONS OF SHED ROOF CHANGING ROOM AT
OUTDOOR TUB AND NOT TO SCALE.
3. REMOVE AND APPROPRIATE DISPOSE EXISTING ROOF COMPONENTS: DECKING, UNDERLAYMENT, SHAKES, AND FLASHING. REPLACE WITH NEW DECKING, UNDERLAYMENT, SHAKES, AND FLASHING.
OUTDOOR TUB CHANGING ROOM SHED ROOF SKETCH