A01.pdf

PDF 256 KB Posted

Attached to
Chief Shakes Hot Springs Maintenance Federal contract opportunity
Solicitation number
AG-0112-S-14-0033
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

Amendment A01

View the file

Other files for this federal contract opportunity

Other files attached to Chief Shakes Hot Springs Maintenance, newest first.
File Type Posted
shakeshotspringplans9-2-14A01.pdf PDF
Solicitation.pdf PDF
Specifications.pdf PDF
PLANS.pdf PDF
lpta_questionnaire.pdf PDF
General_Decision_Number.pdf PDF
LPTA_Factor_1_form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-0112-S-14-0033

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PETERSBURG AK 99833

P O BOX 309

TONGASS NF PETERSBURG OFFICE

USDA FOREST SERVICE

09/08/2014000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/27/2014

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Chief Shakes Hot Springs Maintenance

The purpose of this amendment is to update text andrequirements in the specifications and plan sheets.

Section 01010 paragraph 1.1 revises first 2 sentences. Remove page "Section 01010 - 1" and replace with attached page marked with "Amendment 01" in the lower right corner. Changed sentences are indicated by a verticle line [ | ] in the right margin.

Section C subsection C.1(a) first paragraph revises first 2 sentences. Remove page 5 of 34 and replace with attached page marked with "Amednment 01" in the lower right corner.

Changed sentences are indicated by a verticle line [ | ] in the right margin.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

MICHAEL L. JOHNSON

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 12

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-0112-S-14-0033/000001

Replace the plan sheets with the attached plan sheets marked "Amendment 01" in the upper right corner. The summary of changes to the sheets are:

¿ Drawings sheets 2&6: Removed notes `Gov¿t does not guarantee¿ language referring to government furnished materials.

¿ Drawings sheet 3: Added and changed notes to specify which structures have work on the site overview.

¿ Drawings sheet 4: Added notes to specify which foundation posts need repair. Hatched posts to be repaired.

¿ Drawings sheet 5:

o Changed note to rebar hoops, no longer allow circular hoops, now states government furnishes rebar bending tool.

o Changed shape of existing concrete foundation to be more accurate.

o Added note for location of bottom rebar hoops.

¿ Drawings sheets 6&7:

o Added notes pointing which part of structure is changing room and which part is hot tub room.

o Added note pointing to cedar post column.

¿ Drawings sheet 8: Addition of title text to sketches.

¿ All drawing sheets: Updated name and title block and sheet numbers.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SECTION 01010 - 1

SECTION 01010

SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

This project includes all work specified in the following specifications and drawings to repair and maintain the Chief Shakes Hot Springs buildings. Major work includes foundation repair to decaying cedar posts and replacement of roofs on hot tub structures including indoor tub structure and outdoor tub changing room. Remove decaying portion of cedar posts and replace with concrete column. Reinforce cedar posts with metal bands.

Remove and replace roof components: tongue and groove decking, underlayment, shakes, and flashing to indoor tub structure and outdoor tub changing room.

Government will furnish materials listed on drawing sheet 2 notes. Contractor will furnish all labor, additional material, additional equipment, supervision, and transportation necessary to complete the required work. Work to be completed in accordance with drawings, specifications, and provisions of the contract.

Remove and appropriately dispose any trash generated from work. Excess government furnished material remaining after work to be returned to government.

This project is located at the Chief Shakes Hot Springs day use facility approximately 25 miles north-east of Wrangell, Alaska. The site is typically accessed by boat. The ease of access depends heavily on the water height of the Stikine River. The higher the river level the easier the access, typically for hauling construction materials a river height of

19’ is required to get materials directly to the site’s access trail. The length of the trail is

950’ from the low water stairs and 450’ from the high water dock. The river height is usually highest from mid-May to mid-July.

1.2 USE OF PREMISES

A. Contractor shall at all times conduct operations to ensure the least inconvenience to the public. Closure of the main tub building will be permitted for 60 continuous days, upon written approval of the Contracting Officer (CO). The main tub building must be closed during construction. The access trail to the lower tub must remain open during construction.

B. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.

Amendment 01

ADDENDA SHEET

Chief Shakes Hot Springs Maintenance

REFERENCE NO. OF DOCUMENT BEING CONTINUED

AG-0112-S-14-0033

PAGE

OF

SECTION C--DESCRIPTION/SPECIFICATIONS

C.1 SCOPE OF CONTRACT

C.1 PROJECT SCOPE

(a) Project Description:

This project includes all work specified in the following specifications and drawings to repair and maintain the Chief Shakes Hot Springs building. Major work includes foundation repair to decaying cedar posts and replacement of roofs on hot tub structures including indoor tub structure and outdoor tub changing room. Remove decaying portion of cedar posts and replace with concrete column. Reinforce cedar posts with metal bands. Remove and replace roof components: tongue and groove decking, underlayment, shakes, and flashing.

The Government will furnish materials listed on drawing sheet 2 notes. Contractor will furnish all labor, additional material, additional equipment, supervision, and transportation necessary to complete the required work. Work to be completed in accordance with drawings, specifications, and provisions of the contract.

Remove and appropriately dispose any trash generated from work. Excess government furnished material remaining after work to be returned to government.

This project is located in the Stikine-Leconte wilderness, which prohibits the use of possession of motorized tools or equipment, including battery powered tools, with the exception of motorized boats.

(b) Location and Facilities:

This project is located at the Chief Shakes Hot Springs day use facility approximately 25 miles north-east of Wrangell, Alaska, within the Stikine-LeConte Wilderness. The site is typically accessed by boat. The ease of access depends heavily on the water height of the Stikine River.

The higher the river level the easier the access, typically for hauling construction materials a river height of 19’ is required to get materials directly to the site’s access trail. The length of the trail is 950’ from the low water stairs and 450’ from the high water dock. The river height is usually highest from mid-May to mid-July

AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in the attachments Section are hereby made part of this solicitation and any resultant contract.

Amendment A01 mljohnson02 Typewritten Text mljohnson02 Typewritten Text

File details come from the government source that posted it. Updated .