A01.pdf
PDF 256 KB Posted
- Attached to
- Chief Shakes Hot Springs Maintenance Federal contract opportunity
- Solicitation number
- AG-0112-S-14-0033
About this file
Amendment A01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| shakeshotspringplans9-2-14A01.pdf | ||
| Solicitation.pdf | ||
| Specifications.pdf | ||
| PLANS.pdf | ||
| lpta_questionnaire.pdf | ||
| General_Decision_Number.pdf | ||
| LPTA_Factor_1_form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-0112-S-14-0033
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PETERSBURG AK 99833
P O BOX 309
TONGASS NF PETERSBURG OFFICE
USDA FOREST SERVICE
09/08/2014000001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/27/2014
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Chief Shakes Hot Springs Maintenance
The purpose of this amendment is to update text andrequirements in the specifications and plan sheets.
Section 01010 paragraph 1.1 revises first 2 sentences. Remove page "Section 01010 - 1" and replace with attached page marked with "Amendment 01" in the lower right corner. Changed sentences are indicated by a verticle line [ | ] in the right margin.
Section C subsection C.1(a) first paragraph revises first 2 sentences. Remove page 5 of 34 and replace with attached page marked with "Amednment 01" in the lower right corner.
Changed sentences are indicated by a verticle line [ | ] in the right margin.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
MICHAEL L. JOHNSON
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 12
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-0112-S-14-0033/000001
Replace the plan sheets with the attached plan sheets marked "Amendment 01" in the upper right corner. The summary of changes to the sheets are:
¿ Drawings sheets 2&6: Removed notes `Gov¿t does not guarantee¿ language referring to government furnished materials.
¿ Drawings sheet 3: Added and changed notes to specify which structures have work on the site overview.
¿ Drawings sheet 4: Added notes to specify which foundation posts need repair. Hatched posts to be repaired.
¿ Drawings sheet 5:
o Changed note to rebar hoops, no longer allow circular hoops, now states government furnishes rebar bending tool.
o Changed shape of existing concrete foundation to be more accurate.
o Added note for location of bottom rebar hoops.
¿ Drawings sheets 6&7:
o Added notes pointing which part of structure is changing room and which part is hot tub room.
o Added note pointing to cedar post column.
¿ Drawings sheet 8: Addition of title text to sketches.
¿ All drawing sheets: Updated name and title block and sheet numbers.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SECTION 01010 - 1
SECTION 01010
SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
This project includes all work specified in the following specifications and drawings to repair and maintain the Chief Shakes Hot Springs buildings. Major work includes foundation repair to decaying cedar posts and replacement of roofs on hot tub structures including indoor tub structure and outdoor tub changing room. Remove decaying portion of cedar posts and replace with concrete column. Reinforce cedar posts with metal bands.
Remove and replace roof components: tongue and groove decking, underlayment, shakes, and flashing to indoor tub structure and outdoor tub changing room.
Government will furnish materials listed on drawing sheet 2 notes. Contractor will furnish all labor, additional material, additional equipment, supervision, and transportation necessary to complete the required work. Work to be completed in accordance with drawings, specifications, and provisions of the contract.
Remove and appropriately dispose any trash generated from work. Excess government furnished material remaining after work to be returned to government.
This project is located at the Chief Shakes Hot Springs day use facility approximately 25 miles north-east of Wrangell, Alaska. The site is typically accessed by boat. The ease of access depends heavily on the water height of the Stikine River. The higher the river level the easier the access, typically for hauling construction materials a river height of
19’ is required to get materials directly to the site’s access trail. The length of the trail is
950’ from the low water stairs and 450’ from the high water dock. The river height is usually highest from mid-May to mid-July.
1.2 USE OF PREMISES
A. Contractor shall at all times conduct operations to ensure the least inconvenience to the public. Closure of the main tub building will be permitted for 60 continuous days, upon written approval of the Contracting Officer (CO). The main tub building must be closed during construction. The access trail to the lower tub must remain open during construction.
B. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.
Amendment 01
ADDENDA SHEET
Chief Shakes Hot Springs Maintenance
REFERENCE NO. OF DOCUMENT BEING CONTINUED
AG-0112-S-14-0033
PAGE
OF
SECTION C--DESCRIPTION/SPECIFICATIONS
C.1 SCOPE OF CONTRACT
C.1 PROJECT SCOPE
(a) Project Description:
This project includes all work specified in the following specifications and drawings to repair and maintain the Chief Shakes Hot Springs building. Major work includes foundation repair to decaying cedar posts and replacement of roofs on hot tub structures including indoor tub structure and outdoor tub changing room. Remove decaying portion of cedar posts and replace with concrete column. Reinforce cedar posts with metal bands. Remove and replace roof components: tongue and groove decking, underlayment, shakes, and flashing.
The Government will furnish materials listed on drawing sheet 2 notes. Contractor will furnish all labor, additional material, additional equipment, supervision, and transportation necessary to complete the required work. Work to be completed in accordance with drawings, specifications, and provisions of the contract.
Remove and appropriately dispose any trash generated from work. Excess government furnished material remaining after work to be returned to government.
This project is located in the Stikine-Leconte wilderness, which prohibits the use of possession of motorized tools or equipment, including battery powered tools, with the exception of motorized boats.
(b) Location and Facilities:
This project is located at the Chief Shakes Hot Springs day use facility approximately 25 miles north-east of Wrangell, Alaska, within the Stikine-LeConte Wilderness. The site is typically accessed by boat. The ease of access depends heavily on the water height of the Stikine River.
The higher the river level the easier the access, typically for hauling construction materials a river height of 19’ is required to get materials directly to the site’s access trail. The length of the trail is 950’ from the low water stairs and 450’ from the high water dock. The river height is usually highest from mid-May to mid-July
AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in the attachments Section are hereby made part of this solicitation and any resultant contract.