WorklistCoffmanArea.pdf

PDF 91 KB Posted

Attached to
POW Road Drainage Stabilization 2013 Federal contract opportunity
Solicitation number
AG-0109-S-13-0008
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

Worklist Coffman Area

View the file

Other files for this federal contract opportunity

Other files attached to POW Road Drainage Stabilization 2013, newest first.
File Type Posted
sf-30_ag-0109-s-13-0008_02.doc DOC document
sf-30_ag-0109-s-13-0008.doc DOC document
Stormproofing_Typical_051112.pdf PDF
cmp_removal_ohv_xing_0412.pdf PDF
AG-0109-S-13-0008_solicitation.doc DOC document
culvert_removal_ditch_x_drain.pdf PDF
Worklist__ExchangeCoveArea.pdf PDF
typical_ditch.pdf PDF
bridge_removal_drawing.pdf PDF
Worklist_StaneyArea.pdf PDF
photos.pdf PDF
exchange_cove_area.pdf PDF
Daily_Activity_Report.pdf PDF
staney_area.pdf PDF
culvert_removal_072211.pdf PDF
coffmanCoveArea.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POW Road Drainage Stabilization Worklist Coffman Area

Area Road No. Begin MP End MP

SEG

LENGTH WORK ITEMS

COFFMAN 3030710 0.000 2.142 2.142

0.010 install road closure device to all motor vehicles, use rock and debris to construct mound impassable to traffic

0.060 remove 18" culvert

0.090 Remove 36" culvert ‐ Fish Timing June 25 ‐ Sept 1

0.160 Remove 18" culvert ‐ Fish Timing June 25 ‐ Sept 1

0.346 Stormproof 18" culvert

0.493 Stormproof 18" culvert

0.534 Clean catch basin & Stormproof 18" culvert

0.686 install water bar

0.700 Remove 24" culvert

0.750 Remove 48" culvert

0.800 Remove 36" culvert

0.874

Remove 40 ft log stringer bridge ‐ Fish Timing June

15 ‐ Sept 1 Haul all bridge logs to Thorne Bay LTF

1.012

Remove 40 ft long log stringer bridge ‐ Fish Timing

June 15 ‐ Sept 1 Haul all bridge logs to Thorne Bay

LTF

1.167

Remove 40 ft log stringer bridge ‐ Fish Timing June

25 ‐ Sept 1 Haul all bridge logs to Thorne Bay LTF

1.306

Remove 38 ft log stringer bridge ‐ Fish Timing June

25 ‐ Sept 1 Haul all bridge logs to Thorne Bay LTF

1.348

Remove 38 ft log stringer bridge ‐ Fish Timing June

25 ‐ Sept 1 Haul all bridge logs to Thorne Bay LTF

1.447 Clean catch basin of 24" culvert

1.500 Remove 96" and 48" culvert's

1.503 Remove 18" culvert

1.530 Install water bar

1.540 Remove 96" culvert

1.588 Remove 18" culvert

1.622 Install water bar

1.673 Install water bar and ditch 50 ft

1.714 Ditching for 60 ft

1.757 Clean catch basin and Stormproof 18" culvert

1.800 Remove 96" culvert

1.845 Stormproof 18" culvert

1.881 Clean catch basin and Stormproof 18" culvert

1.931 Install water bar

1.955 Remove 18" culvert

SEG

LENGTH WORK ITEMS

2.008 Remove 48" culvert

2.050 Remove 36" culvert

2.080 Stormproof 18" culvert

2.090 Install water bar

2.097 Clean catch basin and Stormproof 18" culvert

2.142 Install ditchblock and Stormproof 18" culvert

COFFMAN 3030710_1.247 0.000 0.170 0.170

0.000 install water bar

0.041 install water bar

0.094 Install water bar

0.170 Remove 18" culvert

COFFMAN 3030710_1.247 0.000 0.100 0.1

0.000 Install water bar

0.061 Remove 18" culvert

0.096 Remove 18" culvert

COFFMAN 3030720 0.000 2.021

0.010 install road closure device to all motor vehicles, use rock and debris to construct mound impassable to traffic

0.035

Remove 80 ft bridge (Hamilton EZ)‐ transport to

Thorne Bay sortyard ‐ Fish Timing Window June 15 ‐

Sept 1

0.116 Stormproof 24" culvert

0.210 Remove 24" culvert

0.410 Remove 24" culvert‐ (10 ft of fill)

0.470 Install water bar

0.582 Stormproof 18" culvert

0.780 Remove 18" culvert

0.863 Install ditch drain water bar

1.085 Clean 15 ft of ditch and Stormproof 18" culvert

1.124

Remove 60 ft bridge (MBS)‐ transport to Thorne Bay sortyard ‐ Fish Timing Window June 25 ‐ Sept 2

1.210

Install water bar w/ ditchblock‐dig slide debris away on down slope side of road (30ft channel)to create positive drainage

1.237 Stormproof 18" culvert

1.264 Stormproof 18" culvert

1.291 Stormproof 18" culvert

1.332 Remove 24" culvert

1.395 Remove 18" culvert ‐ Fish

1.424 Remove 24" culvert

1.480 Remove 18" culvert ‐ Fish

1.510

Remove 48" culvert (10ft fill) ‐ Fish Timing June 15 ‐

Sept 1

1.541 Clean catch basin and Stormproof 24" culvert

SEG

LENGTH WORK ITEMS

1.571

Reconstruct ditchblock and Stormproof Culvert 24" culvert

1.605 Clean catch basin of 24" culvert

1.700 Remove 18" culvert

1.761 Remove 36" culvert

1.792 Remove 18" culvert

1.875 Stormproof 18" culvert

1.970 Install waterbar

2.004 Remove 24" culvert

2.021 Remove 18" culvert

3030720_2.021ST 0.000 0.250 0.250

0.022 Install waterbar

0.073 Remove 18" culvert

0.109 Install waterbar

0.219 Remove 18" culvert

0.241 Remove 18" culvert

0.249 Remove 18" culvert

COFFMAN 3030723 0.000 0.300 0.300

0.070 remove 24" culvert

0.090 remove 18" culvert

0.100

Sidecast debris from road prism ‐

(300ftLx12ftWx4ftH)

0.110 Remove 18" culvert

0.180

Remove 18" culvert (10' fill) ‐ Fish Timing June 15 ‐

Sept 1

0.190 remove 18" culvert (10" fill)

0.230 remove 24" culvert

0.260 remove 18" culvert

0.290 remove 24" culvert

0.300 remove 18" culvert

COFFMAN 3030000_13.07L 0.000 0.010 Road begins at milepost 13.07 on road 3030000

0.010 install road closure device, use rock and debris to construct mound impassable to traffic

COFFMAN 3030000_13.07LA 0.000 0.069

Road begins at milepost 0.429 on road

3030000_13.07L

0.069 remove 18" culvert

COFFMAN 3030711 0.000 0.030

0.030 remove 18" culvert

COFFMAN 3000360 0.090

Transport logs from this site to Thorne Bay sort yard, 2 piles of logs, one with 18 and one with 40 logs, ranging in length from 20'‐30', see photos in section J

File details come from the government source that posted it. Updated .