Worklist Coffman Area
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| sf-30_ag-0109-s-13-0008_02.doc | DOC document | |
| sf-30_ag-0109-s-13-0008.doc | DOC document | |
| Stormproofing_Typical_051112.pdf | ||
| cmp_removal_ohv_xing_0412.pdf | ||
| AG-0109-S-13-0008_solicitation.doc | DOC document | |
| culvert_removal_ditch_x_drain.pdf | ||
| Worklist__ExchangeCoveArea.pdf | ||
| typical_ditch.pdf | ||
| bridge_removal_drawing.pdf | ||
| Worklist_StaneyArea.pdf | ||
| photos.pdf | ||
| exchange_cove_area.pdf | ||
| Daily_Activity_Report.pdf | ||
| staney_area.pdf | ||
| culvert_removal_072211.pdf | ||
| coffmanCoveArea.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
POW Road Drainage Stabilization Worklist Coffman Area
Area Road No. Begin MP End MP
SEG
LENGTH WORK ITEMS
COFFMAN 3030710 0.000 2.142 2.142
0.010 install road closure device to all motor vehicles, use rock and debris to construct mound impassable to traffic
0.060 remove 18" culvert
0.090 Remove 36" culvert ‐ Fish Timing June 25 ‐ Sept 1
0.160 Remove 18" culvert ‐ Fish Timing June 25 ‐ Sept 1
0.346 Stormproof 18" culvert
0.493 Stormproof 18" culvert
0.534 Clean catch basin & Stormproof 18" culvert
0.686 install water bar
0.700 Remove 24" culvert
0.750 Remove 48" culvert
0.800 Remove 36" culvert
0.874
Remove 40 ft log stringer bridge ‐ Fish Timing June
15 ‐ Sept 1 Haul all bridge logs to Thorne Bay LTF
1.012
Remove 40 ft long log stringer bridge ‐ Fish Timing
June 15 ‐ Sept 1 Haul all bridge logs to Thorne Bay
LTF
1.167
Remove 40 ft log stringer bridge ‐ Fish Timing June
25 ‐ Sept 1 Haul all bridge logs to Thorne Bay LTF
1.306
Remove 38 ft log stringer bridge ‐ Fish Timing June
25 ‐ Sept 1 Haul all bridge logs to Thorne Bay LTF
1.348
Remove 38 ft log stringer bridge ‐ Fish Timing June
25 ‐ Sept 1 Haul all bridge logs to Thorne Bay LTF
1.447 Clean catch basin of 24" culvert
1.500 Remove 96" and 48" culvert's
1.503 Remove 18" culvert
1.530 Install water bar
1.540 Remove 96" culvert
1.588 Remove 18" culvert
1.622 Install water bar
1.673 Install water bar and ditch 50 ft
1.714 Ditching for 60 ft
1.757 Clean catch basin and Stormproof 18" culvert
1.800 Remove 96" culvert
1.845 Stormproof 18" culvert
1.881 Clean catch basin and Stormproof 18" culvert
1.931 Install water bar
1.955 Remove 18" culvert
SEG
LENGTH WORK ITEMS
2.008 Remove 48" culvert
2.050 Remove 36" culvert
2.080 Stormproof 18" culvert
2.090 Install water bar
2.097 Clean catch basin and Stormproof 18" culvert
2.142 Install ditchblock and Stormproof 18" culvert
COFFMAN 3030710_1.247 0.000 0.170 0.170
0.000 install water bar
0.041 install water bar
0.094 Install water bar
0.170 Remove 18" culvert
COFFMAN 3030710_1.247 0.000 0.100 0.1
0.000 Install water bar
0.061 Remove 18" culvert
0.096 Remove 18" culvert
COFFMAN 3030720 0.000 2.021
0.010 install road closure device to all motor vehicles, use rock and debris to construct mound impassable to traffic
0.035
Remove 80 ft bridge (Hamilton EZ)‐ transport to
Thorne Bay sortyard ‐ Fish Timing Window June 15 ‐
Sept 1
0.116 Stormproof 24" culvert
0.210 Remove 24" culvert
0.410 Remove 24" culvert‐ (10 ft of fill)
0.470 Install water bar
0.582 Stormproof 18" culvert
0.780 Remove 18" culvert
0.863 Install ditch drain water bar
1.085 Clean 15 ft of ditch and Stormproof 18" culvert
1.124
Remove 60 ft bridge (MBS)‐ transport to Thorne Bay sortyard ‐ Fish Timing Window June 25 ‐ Sept 2
1.210
Install water bar w/ ditchblock‐dig slide debris away on down slope side of road (30ft channel)to create positive drainage
1.237 Stormproof 18" culvert
1.264 Stormproof 18" culvert
1.291 Stormproof 18" culvert
1.332 Remove 24" culvert
1.395 Remove 18" culvert ‐ Fish
1.424 Remove 24" culvert
1.480 Remove 18" culvert ‐ Fish
1.510
Remove 48" culvert (10ft fill) ‐ Fish Timing June 15 ‐
Sept 1
1.541 Clean catch basin and Stormproof 24" culvert
SEG
LENGTH WORK ITEMS
1.571
Reconstruct ditchblock and Stormproof Culvert 24" culvert
1.605 Clean catch basin of 24" culvert
1.700 Remove 18" culvert
1.761 Remove 36" culvert
1.792 Remove 18" culvert
1.875 Stormproof 18" culvert
1.970 Install waterbar
2.004 Remove 24" culvert
2.021 Remove 18" culvert
3030720_2.021ST 0.000 0.250 0.250
0.022 Install waterbar
0.073 Remove 18" culvert
0.109 Install waterbar
0.219 Remove 18" culvert
0.241 Remove 18" culvert
0.249 Remove 18" culvert
COFFMAN 3030723 0.000 0.300 0.300
0.070 remove 24" culvert
0.090 remove 18" culvert
0.100
Sidecast debris from road prism ‐
(300ftLx12ftWx4ftH)
0.110 Remove 18" culvert
0.180
Remove 18" culvert (10' fill) ‐ Fish Timing June 15 ‐
Sept 1
0.190 remove 18" culvert (10" fill)
0.230 remove 24" culvert
0.260 remove 18" culvert
0.290 remove 24" culvert
0.300 remove 18" culvert
COFFMAN 3030000_13.07L 0.000 0.010 Road begins at milepost 13.07 on road 3030000
0.010 install road closure device, use rock and debris to construct mound impassable to traffic
COFFMAN 3030000_13.07LA 0.000 0.069
Road begins at milepost 0.429 on road
3030000_13.07L
0.069 remove 18" culvert
COFFMAN 3030711 0.000 0.030
0.030 remove 18" culvert
COFFMAN 3000360 0.090
Transport logs from this site to Thorne Bay sort yard, 2 piles of logs, one with 18 and one with 40 logs, ranging in length from 20'‐30', see photos in section J