OVERHAUL DESCRIPTION

FOR OFFICIAL USE ONLY

ITEM NAME PUMP,CENTRIFUGAL

STOCK NUMBER 4320-01-505-1669

PART NUMBER 22500178

USED ON WMEC 210 A/B CLASS #1 & # 2 MDE

Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.

OVERHAUL REQUIREMENTS:

PRELIMINARY INSPECTION REQUIREMENTS:

Each PUMP shall be inspected in order to determine the extent of required repairs. A Condition Report and Cost Proposal shall be provided to the Coast Guard Contracting Officer 30 days from receipt of each pump, which shall include: the required repairs needed for each pump, new replacement parts required with prices, labor rate, labor hours required, and a total estimate for all required services which shall also include any charges for labor in the repair or building of a new shipping container. The serial number for PUMP shall be documented on the Condition Report. If not assigned, the Contractor shall assign a serial number. The serial number shall be stamped into each pump.

TESTS AND INSPECTION REPORTS:

Contractor shall supply a copy of any standard inspection and test report to the Coast Guard Q.A. Representative upon his arrival at the contractor's plant. The material and dimensional inspection report shall be sent to the Contracting Officer prior to requesting a Q.A. inspection. A final test or inspection report shall be packed with each pump.

MATERIAL CERTIFICATIONS:

Material certifications shall be submitted for any components designed to be exposed to corrosive fluids. The Contractor shall be required to provide a Certificate of Material Conformance as part of the overall inspection reports.

OVERHAUL REQUIREMENTS:

Overhaul in accordance with the Repair Specification is contingent upon receipt, review and approval of the Open and Inspect Report and authorization to proceed from the Coast Guard Contracting Officer. Each PUMP shall be overhauled to a condition which shall restore the operating and performance characteristics to the "ORIGINAL" design and technical specifications.

Overhaul shall be performed in accordance with FAIRBANKS MORSE ENGINE DIVISION specifications and standards, which are proprietary to FAIRBANKS MORSE ENGINE DIVISION. All repair parts shall be genuine FAIRBANKS MORSE ENGINE DIVISION manufactured parts.

The water seal assembly MUST be a BRAND NAME MANDATORY, WARTSILA Defense seal, P/N HSP-11481-1, NSN 4320-01-118-5280. After completion of all repairs a final inspection/assembly report shall be submitted to the Contracting Officer for approval prior to any scheduled QA inspections. This report shall have all OEM minimum and maximum design dimensions and clearances of all attributes along with the actual dimensions documented. All out of tolerance dimensions shall be circled or highlighted. A waiver request shall be submitted with all out of tolerance conditions stating why the out of tolerance condition is acceptable along with a statement that the function and performance of the PUMP will not be diminished or compromised prior to any QA inspections. The contractor shall provide the Coast Guard's contracting officer 7 days notification prior to performing any standard production tests and inspections to assure maximum design performance.

NOTE:

Pump, part number 16600924, NSN 2930-00-480-7537 shall have a K-Monel shaft, Fairbanks Morse part number 16702542 installed.

QUALITY ASSURANCE:

The inspections and tests required herein are the minimum necessary and are not intended to replace any controls, examinations or tests normally employed by the contractor to assure the quality of the product. The following are required and will be monitored by a Government Quality Assurance Representative.

a. Witness all standard production testing.

b. Witness preservation, packaging, packing, and marking.

PRESERVATION:

Each PUMP shall be painted and preserved in accordance with OEM specifications.

Each PUMP shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.

PACKAGING:

Each overhauled PUMP shall be packaged in a moisture resistant protective envelope. All open ports shall be sealed using waterproof caps or covers to prevent the intrusion of moisture and other contaminants.

A copy of the material certifications shall be packaged inside a protective envelope.

PACKING:

At a minimum, the shipping container shall consist of a box constructed of 3/4 inch plywood, totally enclosed, with internal or external bracing with a skid mounted base to facilitate handling by a fork lift. Each PUMP Assembly shall be through bolted to the base of the shipping container using the base mount plate of the pump or wooden blocking shall be incorporated to prevent the pump from movement during multiple shipments. Corrosion resistant screws shall be used to secure the top cover of the container.

MARKING:

Each pump shall have a name plate attached to the housing displaying the vendors name, serial number, model number/part number, CG Contract number, and Delivery Order number stamped on the name plate. All previous markings shall be completely removed from the reusable shipping container prior to the application of any new markings. If the reusable shipping container is inadequate for reshipment the newly constructed shipping container shall be constructed of wood. Each PUMP shall be packed individually in its own wooden container which shall be capable of providing adequate protection to the PUMP during multiple shipments. Mark each container using 3/4 stencials. Prior to stenciling, the container shall have painted contrasting backgrounds using white paint for the background and black paint for the lettering.

National Stock Number: 4320-01-505-1669 Item Name: Pump, Centrifugal

SHELF LIFE CD 0

PRELIMINARY INSPECTION REQUIREMENTS:

Each PUMP shall be inspected in order to determine the extent of required repairs. A Condition Report and Cost Proposal shall be provided to the Coast Guard Contracting Officer 30 days from receipt of each pump, which shall include: the required repairs needed for each pump, new replacement parts required with prices, labor rate, labor hours required, and a total estimate for all required services which shall also include any charges for labor in the repair or building of a new shipping container. The serial number for PUMP shall be documented on the Condition Report. If not assigned, the Contractor shall assign a serial number. The serial number shall be stamped into each pump.

TESTS AND INSPECTION REPORTS:

Contractor shall supply a copy of any standard inspection and test report to the Coast Guard Q.A. Representative upon his arrival at the contractor's plant. The material and dimensional inspection report shall be sent to the Contracting Officer prior to requesting a Q.A. inspection. A final test or inspection report shall be packed with each pump.

MATERIAL CERTIFICATIONS:

Material certifications shall be submitted for any components designed to be exposed to corrosive fluids. The Contractor shall be required to provide a Certificate of Material Conformance as part of the overall inspection reports.

OVERHAUL REQUIREMENTS:

Overhaul in accordance with the Repair Specification is contingent upon receipt, review and approval of the Open and Inspect Report and authorization to proceed from the Coast Guard Contracting Officer. Each PUMP shall be overhauled to a condition which shall restore the operating and performance characteristics to the "ORIGINAL" design and technical specifications.

Overhaul shall be performed in accordance with FAIRBANKS MORSE ENGINE DIVISION specifications and standards, which are proprietary to FAIRBANKS MORSE ENGINE DIVISION. All repair parts shall be genuine FAIRBANKS MORSE ENGINE DIVISION manufactured parts.

The water seal assembly MUST be a BRAND NAME MANDATORY, WARTSILA Defense seal, P/N HSP-11481-1, NSN 4320-01-118-5280. After completion of all repairs a final inspection/assembly report shall be submitted to the Contracting Officer for approval prior to any scheduled QA inspections. This report shall have all OEM minimum and maximum design dimensions and clearances of all attributes along with the actual dimensions documented. All out of tolerance dimensions shall be circled or highlighted. A waiver request shall be submitted with all out of tolerance conditions stating why the out of tolerance condition is acceptable along with a statement that the function and performance of the PUMP will not be diminished or compromised prior to any QA inspections. The contractor shall provide the Coast Guard's contracting officer 7 days notification prior to performing any standard production tests and inspections to assure maximum design performance.

NOTE:

Pump, part number 16600924, NSN 2930-00-480-7537 shall have a K-Monel shaft, Fairbanks Morse part number 16702542 installed.

QUALITY ASSURANCE:

The inspections and tests required herein are the minimum necessary and are not intended to replace any controls, examinations or tests normally employed by the contractor to assure the quality of the product. The following are required and will be monitored by a Government Quality Assurance Representative.

a. Witness all standard production testing.

b. Witness preservation, packaging, packing, and marking.

PRESERVATION:

Each PUMP shall be painted and preserved in accordance with OEM specifications.

Each PUMP shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.

PACKAGING:

Each overhauled PUMP shall be packaged in a moisture resistant protective envelope. All open ports shall be sealed using waterproof caps or covers to prevent the intrusion of moisture and other contaminants.

A copy of the material certifications shall be packaged inside a protective envelope.

PACKING:

At a minimum, the shipping container shall consist of a box constructed of 3/4 inch plywood, totally enclosed, with internal or external bracing with a skid mounted base to facilitate handling by a fork lift. Each PUMP Assembly shall be through bolted to the base of the shipping container using the base mount plate of the pump or wooden blocking shall be incorporated to prevent the pump from movement during multiple shipments. Corrosion resistant screws shall be used to secure the top cover of the container.

MARKING:

Each pump shall have a name plate attached to the housing displaying the vendors name, serial number, model number/part number, CG Contract number, and Delivery Order number stamped on the name plate. All previous markings shall be completely removed from the reusable shipping container prior to the application of any new markings. If the reusable shipping container is inadequate for reshipment the newly constructed shipping container shall be constructed of wood. Each PUMP shall be packed individually in its own wooden container which shall be capable of providing adequate protection to the PUMP during multiple shipments. Mark each container using 3/4 stencials. Prior to stenciling, the container shall have painted contrasting backgrounds using white paint for the background and black paint for the lettering.

National Stock Number: 4320-01-505-1669 Item Name: Pump, Centrifugal

Part Number: 22500178 Serial Number: ________________________________ Government Order Number:________________________________ And The Words: "Coast Guard SFLC Material" Condition (A)

BAR CODING:

All material shipped to the U.S. Coast Guard SFLC under this contract shall be labeled using bar code labels as specified in ELC specification D-000- 0100, dated 10/91, REV G 02/06, Bar Coding for USCG Surface Forces Logistics Center Procured Material.

The actual labels shall be Type (V), Grade (B), Style I or 2, composition "a" with plastic laminate.

Each label shall contain encoded data for the Stock Number.

DELIVERY SCHEDULE REQUIREMENT FOR GOVERNMENT FURNISHED PROPERTY:

The contractor shall provide the Coast Guard's contracting officer a Preliminary Inspection Report within 30 days from receipt of each pump.

Final delivery of the overhauled pumps shall be 90 days from authorization to proceed with repairs.

WARRANTY:

A. Standard Manufacturer's Warranty

X B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.

Contractor must guarantee item against defects that lead to failure for

90 days after installation for a period of up to two (2) years after delivery to Coast Guard.

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.

PACKAGING AND MARKING FOR SHIPMENT:

X A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:

NATIONAL STOCK NUMBER

ITEM NAME

PART NUMBER

GOVERNMENT ORDER NUMBER

4320-01-505-1669

PUMP,CENTRIFUGAL

22500178

PRESERVATION / PACKAGING:

X A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.

B. See Attachments

B. See Attachments

And the words: "Coast Guard SFLC Material, Condition "A"

RECOMMENDED SOURCES:

BRECO INTERNATIONAL

6830 LA PASEO

HOUSTON, TX

713-641-6073

POC BRIDGETTE BARNES

FAIRBANKS MORSE, LLC

701 WHITE AVE

BELOIT, WI 53511-5447

CRYSTAL.MAJERUS@FAIRBANKSMORSE.COM

JAMES.FLANNERY@FAIRBANKSMORSE.COM

WRITTEN BY:

DATE :

ARNOLD ABBAS

15 DEC 21

Cost Estimate for Overhaul NOT TO EXCEED: $11,270.56