AF Form 66.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- CIPP Lining on Bldg 700/ R112
- Solicitation number
- FA303021R0023
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA303021R00230001 SF 30.pdf | ||
| Building Wage Determination TX20210282.pdf | ||
| Plumbing Riser.pdf | ||
| BAL TEMPLATE.docx | DOCX document | |
| B700 Rm C112 Reline Domestic Water Supply SOW.pdf | ||
| Pictures for the Site.pdf | ||
| Plumbing First Floor.pdf | ||
| FA303021R0023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT: B700 CIPP Relining | SOLICITATION/CONTRACT NO. | ||||||||||||||||||||||
| TO BE COMPLETED BY THE PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Ref spec & para no.) | CERTIFICATION | OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S | RECOMMENDATIONS | MANUFACTURER'S | WARRANTY | OPERATING | INSTRUCTIONS | SEE PARA | OTHERS AS SPECIFIED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CON-TRACTING | DATE TO CIVIL ENGINEER-ING | RETURN SUSPENSE DATE | FOLLOW UP | DATE CONTRACTOR NOTIFIED | CONTRACT-TOR RE- SUBMIT- TAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DISAPPROVED | |||||||||||||||||||||||
| 1 | Para. 1.5 - Product Specifications | 1 | 14 Days Prior (e) | GA | ||||||||||||||||||||
| 2 | Para. 1.5.1 - Work Schedule | 1 | (c) | FIO | ||||||||||||||||||||
| 3 | Para. 1.7.1 - Safety Policy & Accident Prevention Plan | 1 | (c) | FIO | ||||||||||||||||||||
| 4 | Para. 1.9.4 - Contractor Dumpster (if applicable) | 1 | (c) | GA | ||||||||||||||||||||
| 5 | Para 1.12 List of Warranties and Certificates | 1 | Upon Final Acceptance by Gov | GA | ||||||||||||||||||||
| 6 | Para 1.13.1 Parking & Storage | 1 | (c) | GA | ||||||||||||||||||||
| 7 | Para 1.14.1.1 AF Form 103 Base Work Clearance Request | 1 | (e) | GA | ||||||||||||||||||||
| 8 | Para 1.14.2 Utility Outages | 1 | (c) | FIO | ||||||||||||||||||||
| 9 | Para 1.15 Waste Disposal | 1 | (d) | GA | ||||||||||||||||||||
| 10 | Para 2.2 Hazardous Waste Records | 2 | x | (b) | GA | |||||||||||||||||||
| 11 | Para 2.5 Haz. Material List with worksheet for each SDS | 2 | x | (c) | GA | |||||||||||||||||||
| 12 | Para 2.8 Air Emissions Reports | 2 | x | (b) | GA | |||||||||||||||||||
| 13 | Para 2.9 Construction Waste Management Form | 2 | (b) | GA | ||||||||||||||||||||
| 14 | Para 2.10 EMS Awareness Training Certificate | 2 | (e) | FIO | ||||||||||||||||||||
| 15 | Para 3.4 CPM: Manufacturer's Specifications | 3 | (e) | FIO | ||||||||||||||||||||
| 15 | Para 4.2 Installation: DVD Copy Video Inspection | 4 | (b) | FIO | ||||||||||||||||||||
| 16 | Para 4.3 Contractor Quality Control Daily Reports | 4 | (f) | FIO | ||||||||||||||||||||
| AF Form 66, SEP 86 | ||||||||||||||||||||||||
| (a) As soon as possible but in no case later than 45 calendar days after NTP. | ||||||||||||||||||||||||
| (b) Prior to Final Inspection. | ||||||||||||||||||||||||
| (c) Prior to Use. | ||||||||||||||||||||||||
| (d) As Required. | ||||||||||||||||||||||||
| (e) Prior to start of work. | ||||||||||||||||||||||||
| (f) Weekly. |
PAGE &P OF &N
FORM66.xls
Sheet2
File details come from the government source that posted it. Updated .