AE Sources Sought Notice.docx

DOCX document 59 KB Posted

Attached to
C1DA--523-09-156 - SPD HVAC Upgrades Federal contract opportunity
Solicitation number
36C24121R0136
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This Sources Sought Notice requests qualifications packages from firms interested in providing architectural and engineering services for HVAC upgrades at a Department of Veterans Affairs medical center. Key details include:

  • Scope of work is to develop drawings, specifications, cost estimates and other documents to upgrade HVAC systems in a Supply Process Distribution building. Work includes reconfiguring air handling units, fans, ductwork, pumps and associated mechanical and control systems.

  • Submission deadline is July 12, 2021. Evaluation criteria are professional qualifications, reputation, specialized experience, teamwork, capacity, past performance, capability and location.

  • Design phases are conceptual, schematics, design development and construction documents. Construction budget is $3.1 million with deduct alternates totaling 20% of estimate.

  • Services include design, specifications, cost estimating, phasing, meetings and construction administration. Energy design must achieve 30% savings below ASHRAE 90.1-2013.

  • The opportunity is set aside for service-disabled veteran-owned small businesses. Responses must address limitations on subcontracting. The contracting agency is the Department of Veterans Affairs Veterans Health Administration VISN 1.

View the file

Other files for this federal contract opportunity

Other files attached to C1DA--523-09-156 - SPD HVAC Upgrades, newest first.
File Type Posted
A-E Supplement C 523-09-156.pdf PDF
36C24121R0136.docx DOCX document
A-E Supplement B 523-09-156.pdf PDF
A-E Supplement A 523-09-156.pdf PDF
PRESENT-PAST PERFORMANCE SURVEY.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A/E SF-330

REQUEST FOR QUALIFICATIONS (SF-330)

***ATTENTION: THE INSTRUCTIONS PROVIDED IN THIS NOTICE ARE IN ADDITION TO THOSE PROVIDED ON THE SF 330, ARCHITECT-ENGINEER QUALIFICATIONS***

NAICS Code: 541 -- Professional, Scientific, and Technical Services; 541330 - Engineering Services (Small Business size standard of $16.5 million dollars average annual receipts) Set Aside for Service Disabled Veteran Owned Small Business.

A. INTRODUCTION:

The Department of Veterans Affairs Medical Center (VAMC); Network Contracting Office 1 (NCO1) is requesting qualification statements for HVAC Upgrades at the Boston VAMC.

B. CONTRACT INFORMATION:

Scope of Work Provide all professional architectural and engineering (A/E) services necessary to develop complete drawings, specifications, cost estimates, construction schedules, project phasing, investigations, site visits and construction period services associated with upgrading Heating, Ventilation and Air Conditioning for Supply Process Distribution (SPD) Building 1 Level 2 at Veterans Affairs’ Medical Center (VAMC), 150 South Huntington Avenue, Boston, MA. This project addresses facilities conditions assessment (FCA) deficiencies in the core HVAC infrastructure system in Building 1 Level

2. The existing HVAC systems are inefficient, undersized, and outdated. System performances are below standards and leads to problems in air quality and temperature control in the SPD Area. Currently the system is at 100% capacity and runs on multiple systems, mechanical, electric, electronic and pneumatic controls, which leads to reduced control capability, lag in system response, and requires larger equipment. HVAC upgrades lead to higher air quality which positively affects infection control and personnel comfort. This project will include, but not be limited to, the reconfiguration and upgrade of HVAC systems in Building 1 Level 2 including Air Handling Units, fans, supply/return/exhaust ductwork, pumps, associated hydronic, steam and coolant lines, electrical powering, terminal units, and all sensors and monitoring equipment. Conduct preliminary project scope meetings and site survey investigations to develop the necessary elements for conceptual layout schemes with proposed alternatives consistent with the VA’s project team goals as prioritized during preliminary project meetings, field surveys and studies. The overall intent of this project is to provide a complete, energy efficient, flexible, and easy to maintain HVAC backbone for the SPD Area.

The intents of this project are to include, but are not be limited to:

· Consolidate/upgrade existing chillers

· Replace/upgrade existing AHU’s and pumps

· Provide central air conditioning (a/c) and ventilation to replace existing window air conditioners

· Replace existing fan coil systems with variable air volume (VAV) systems for central air conditioning and ventilation

· New/replace ductwork, pumps, associated hydronic/steam/coolant lines

· Replace window sashes where existing window a/c units exists

· Install direct digital controls (DDC) on new and existing systems and integrate with the building management system

· Upgrade the SPD area’s perimeter convector heating system to be DDC controlled and integrate into the building energy management system

· Reconfigure room layouts as needed to achieve the project goals

· Modify/replace/upgrade architectural and structural systems as needed

· Meet VA standards for security measures.

· Building systems and components will be modified or upgraded as needed (e.g., electrical (normal and emergency power), HVAC, lighting, plumbing and fixtures, fire protection, fire detection/alarm, chilled water, steam, telephone/data, telephone/data, nurse call, CCTV, signage)

· Review existing electrical system and upgrade as needed for new equipment.

· ASHRAE Standard 90.1-2013 Energy Standard for Buildings

· Infection control measures

· If required, site work, soil investigation/borings/samples, topographical surveys

· Lead and asbestos abatement

· Accessibility requirements (ADA, Uniform Federal Accessibility Standards, Massachusetts Architectural Access Board Regulations, Architectural Barriers Act)

· Access Control, Security and Safety monitoring camera’s where needed

· Install a dedicated exhaust fan, ductwork, and architectural barrier to separate the unsterile and sterile spaces. Unsterile space must have negative air pressure with respect to the sterile space.

· Replace packaged DX unit with a station air handler, ductwork, and controls to cool the unsterile space and the entryway to the sterile space.

· Fully utilize the AHU installed in phase 1 of the project to service the space.

· Develop a plan to retain sterilization services for the Jamaica Plain VA during construction.

Flash sterilization and or sterile shipping from Brockton VA may be used, or other solutions which retain services.

2. Description of Work —

2.1 General: Conduct preliminary meetings and site survey investigations to define the necessary elements of the project scope of work fulfilling the goals of the VA’s project team (Engineering Service), and presentation of preliminary layout plans with proposed alternatives to the User Group. Based on User Group meetings and site surveys, prepare a detailed project plan description report pertinent to the project requirements within the constraints of the construction budget consistent with the VA’s project team goals. Through the course of the design phase, it will be necessary to interface with Medical Center staff to ascertain the details of the scope through a series of meetings and periodic submissions of documents. All design submission requirements shall be in accordance to Open ended A/E Contract and conform to the latest editions of all VA criteria/standards/regulations/design guides, etc. (VA’s Office of Construction & Facilities Management web site: http://www.cfm.va.gov), in addition to Commonwealth of Massachusetts state codes and regulations and national codes and regulations.

2.2 Implementation: Engage the services of all consultants in each discipline deemed to be necessary to fulfill the requirements of the project plan. Each discipline shall document and investigate the relevant existing conditions found, identify/investigate/review the availability of existing building information, and field verify all essential elements pertinent to their discipline. Site investigations shall measure, photograph, video tape, and document the conditions of areas to be renovated and/or impacted. Provide the necessary investigation/inspection/testing/metering of existing utilities to ensure their adequacy for this project.

2.3 Project Development: The A/E shall provide all services required to prepare documents and reports for the subject project consistent with the VA’s project team goals as prioritized during preliminary project meetings, field surveys and studies. The A/E shall determine existing conditions, severity of deficiencies, if any previous deficiencies have been corrected and to identify any conditions which may have previously been unreported. Cost estimates shall be prepared to reflect the cost of replacing the component in a standalone project (i.e., not as part of another project) and all cost for this replacement including but not limited to lead and asbestos removal, required phasing, special field conditions and/or temporary equipment needed during the construction. The completed report shall then be submitted for approval to the Project Engineer.

2.4 Project Design: Based on the approved design development the A/E shall provide all services required to prepare plans, specifications, and other supporting documents necessary to correct the identified deficiencies in priority order. The approved cost estimate and available project funding will be used to determine the amount of deficiencies which will be correct under this project. A complete design including but not limited to determination and evaluation of existing conditions, necessary engineering calculation, necessary design work, independent fire safety/life safety review, IH Services, quantity and cost estimates, bid schedule, construction cost estimates, a proposed construction schedule, design analyses and calculations, a design documentation report, engineering considerations and options report shall be developed for this project.

2.5 Asbestos & Lead: The proper identification Asbestos & Lead to determine construction costs associated with Comprehensive Strategy & Report phase of this project are considered part of this project. To extent possible existing Asbestos and Lead Assessment of the facility will be made available to the A/E. Additionally proper asbestos and lead abatement design and IH monitoring services required during construction to correct the deficiencies selected for the construction design portion of this project shall also be provided by the A/E.

2.6 Window Sealant Testing for PCB: The proper identification of polychlorinated biphenyl (PCB) in window sealants to determine construction costs associated with Comprehensive Strategy & Report phase of this project are considered part of this project. Proper PCB window sealant, testing, abatement design and IH monitoring services required during construction to correct the deficiencies selected for the construction design portion of this project shall also be provided by the A/E.

3. General Description of Services — A/E shall provide the services indicated in this Statement of Work, Supplement A, Supplement B and Supplement C. These services will be provided in distinct phases:

Conceptual/15% Submittal – Preliminary User Group Meetings & Field Surveys 30% Submittal – Schematics 60% Submittal – “DD” Design Development 90% Submittal – “CD” Construction Documents 100% Submittal – Bid [Final] Documents Construction Period Services Project Close Out Submittal – “As-Built” Construction Documents

3.1 Drawings: The drawings, specifications, and all other submittal items will be prepared using English units of measure.

3.1.1 General: The A/E shall prepare drawings in a manner that clearly and adequately delineates the work to be accomplished by the construction contractor. Design documents will be sufficiently detailed to permit construction contractors to submit responsive bids without visiting the project site. The cover sheet will be signed and stamped by principal of the firm who is a registered Architect or Professional Engineer. All drawings will be created using AutoCAD and National CAD standards. These CAD standards are available on the Internet at the VA’s Office of Construction & Facilities Management web site: http://www.cfm.va.gov.

3.1.2 CAD Files: One CAD (*.DWG) file shall be used per drawing (sheet) applying the VA’s CAD layering and disk labeling protocols. All files shall be IBM compatible and furnished on high quality CD-R disks. Provide in accordance with Supplement “B” sets of drawings (AutoCAD). The computerized version, format and media of the computer disks and files shall be specified and verified by the VA Project Engineer at the time each submission is due (XRF, DXF and ZIP files are not acceptable). Provide durable high quality plastic storage boxes at each submission for long term archiving of the disks.

3.1.3 Format: All drawings and sketches will be provided in both hard copy and electronic file format. Full-sized drawings shall be developed as “E” sized sheets (30 inches by 42 inches at the trim line) and shall utilize the standard VA title block. Fonts shall be standard AutoCAD, and drawings must be fully compatible with AutoCAD 2008. Drawing file names shall contain the drawing number and drawing title information. Drawings shall utilize world coordinate system with standard cross hairs. Each drawing shall have a separate drawing file name consistent with the drawing title. Adobe Acrobat PDF files for each AutoCAD file shall be provided.

3.1.4 Fire/Life Safety Review: An independent fire safety and life safety review shall be accomplished at each design submission. Include the cost and coordination for a fire/safety review. FP&C Consultants, 1520 Main Street, Indianapolis, IN, 46224 is suggested based on past experience; the point of contact is Beth Alexander at phone number 317-486-5188.

3.2 Specifications …

3.2.1 General: The A/E shall utilize the latest edition of VA Master Specifications as revised and provided by the facility supplemented by the VA Office of Construction and Facilities Management Master Specifications as needed. The VA retains no responsibility for the development or preparation of any specification. While it is recognized that certain Divisions and/or Sections will require significant input from the VA, the A/E retains overall responsibility for these Sections.

3.2.2 Electronic Files: All files shall be IBM compatible and furnished on high quality CD-R disks. Provide in accordance with Supplement “B” sets of specifications (MS Word). The computerized version, format and media of the computer disks and files shall be specified and verified by the VA Project Engineer at the time each submission is due (ZIP files are not acceptable). Provide durable high quality plastic storage boxes at each submission for long term archiving of the disks.

3.2.3 Outline Specifications: The A/E shall develop an outline specification listing the proposed guide specifications and the A/E prepared sections that will be used for the project. The outline specification will list the guide specification number and title for each proposed section. Sections shall be arranged within their respective divisions, in numerical order. New specification sections, developed by the A/E, will be numbered to fall in their respective division at a logical location.

3.2.4 Editing Specifications: The A/E must thoroughly edit and adapt the Specifications to satisfy the project requirements and provide a complete set of construction specifications. The A/E shall notify the VA in writing should there be instances where there are no appropriate Master Specifications available for use. At the VA’s direction the required specifications will be prepared by the A/E. These specifications shall list the essential features, functions, and other factors to clearly indicate the type and quantity of items/work required. All specifications will be prepared by listing parameters and requirements that can be met by several manufacturers. The use of trade names may be used to establish the standard of quality to be met.

3.2.5 Construction Contractor Submittal Register: The specifications require the construction contractor to submit shop drawings, samples, manufacturer’s data, certificates, test reports, and other items to the Government. The A/E shall prepare a complete listing of construction contractor submittal requirements on an Excel Spreadsheet. The spreadsheet shall have a separate line for each required submittal and separate columns for Division, Section, and type of submittal (catalog cut, sample, etc.). The register shall be incorporated with the specifications.

3.3 Quantity and Cost Estimates …

3.3.1 Format: The A/E shall prepare quantity computations, cost estimates, and construction cost estimates for this project. All construction cost estimates shall conform to the requirements contained in VA Manual for Preparation of Cost Estimates (latest edition). Manual is available on the Internet at the VA’s Office of Construction & Facilities Management web site: http://www.cfm.va.gov.

3.3.2 Cost Estimate Submittal: Cost estimates shall be submitted in 2 hard copies and in electronic form. THE A/E IS RESPONSIBLE FOR ESTABLISHING INTERNAL CONTROLS FOR KEEPING THE PRJOJECT DESIGN WITHIN PROJECTED CONSTRUCTION FUNDING. THE A/E WILL BE REQUIRED TO REVISE DESIGN AND RESUBMIT COST ESTIMATES AS NECESSARY (AT NO COST TO THE VA) SHOULD COST ESTIMATES EXCEED CONSTRUCTION FUNDING.

3.4 Phasing and Construction Schedules…

3.4.1 Schedules: The A/E shall prepare a proposed schedule for construction that is consistent with the project construction cost estimate. During development of this schedule, due consideration will be given to standard construction practices, durations of tasks, the sequence of construction, procurement of materials, climatic conditions, etc. It is planned that areas in and adjacent to the proposed construction area shall be occupied during construction. The A/E shall develop a phasing plan that addresses this fact and assures smooth implementation of required construction. Special attention will be required to develop a design that can be phased as to allow work to be performed while all services remain in operation and can reasonably maintain day to day operations.

3.4.2 Schedule Format: The construction schedules shall be horizontal bar charts that: a) identify the major construction activities required to perform the work; b) identify the duration of each of the major construction activities; c) identify the critical path network to achieve the work.

3.5 Design Analysis (DA): The A/E shall develop a DA that addresses general project parameters, functional and technical requirements, existing conditions, design objectives, design assumptions, product literature, and calculations applicable to the project’s design. Design/Construction Alternatives, existing physical limitation and their impact shall also be included in the DA.

3.6 Quality Control …

3.6.1. Quality Control Plan: The A/E shall prepare a Quality Control Plan (QCP) which includes the following as a minimum:

· Identification and discussion of all organizational and technical interfaces

· Design team members and their areas of responsibility

· Team members responsible for checking the design

· Team members responsible for checking the electronic files

· Team members responsible for reviewing and submitting the required VA Design Alerts and Quality Alerts

· Project Schedule showing key milestones and review periods

3.6.1.1. VA Design Alerts and VA Quality Alerts can be found on the internet at the VA’s Office of Construction & Facilities Management web site: http://www.cfm.va.gov.

3.6.2. Quality Assurance: The A/E is responsible for developing and performing quality assurance reviews of all work to confirm that proper criteria, regulations, laws, codes, principles and professional procedures have been used. This includes work performed by subcontractors. The VA shall review all project submissions but this review is general in nature and should not be considered as part of the A/E’s Quality Control Plan and/or Quality Assurance.

3.6.3 Quality Certification: The A/E shall certify at each submission in writing that he/she has performed quality assurance reviews of that submission.

3.7 Site Visits, Meetings/Conferences, and Discussions …

3.7.1. Site Visits: The A/E shall perform design site visits as required to accomplish the scope of this project. The purpose of these visits is further define project requirements, observe and evaluate existing field conditions, review any existing documentation, conduct required design meetings, and to gather supplemental site data necessary for performing the design. Reports summarizing the conditions observed, personnel contacted, and data gathered during the visits shall be prepared and included in the Design Development Documentation.

3.7.2. Design Review Conferences: Design review conferences shall conduct shortly following the issuance of each review Submission. Refer to Supplement B for the proposed schedule, but will typically take place two weeks after the submission date. Design review conferences for the Schematics, Design Development and Construction Document Development phase shall include the A/E Project Manager/Senior Designer. These conferences shall take place at the facilities where the work is being performed.

3.7.3 Site Visit and Meeting Minutes: The A/E shall take notes and prepare minutes for all site visits, meetings and conferences attended. Minutes will be prepared in typed form, signed by the A/E Project Manager, and furnished to project engineer within seven calendar days after the meeting/conference for concurrence and distribution to attendees. Copies of all meeting/conference minutes will be included in each Submission.

3.8 Responsibility after Design Completion: The A/E is required to support the VA should errors or omissions in the documents create problems in bidding or administering the contract for construction. As needed, the A/E will clarify the design intent and correct any errors or omissions in the original documents. The corrections shall be done in a timely manner at no additional cost to the Government. The A/E shall incorporate amendment changes on the original drawings and/or CAD drawings when requested to do so after the bidding process at no extra cost to the Government. In addition, the A/E shall incorporate amendment changes on the submittal registers and submit on a CD labeled with the project title, location, and construction contract number. Also, during the bidding period, the A/E is required to assist in answering all bidders’ inquiries pertaining to the design. If clarifications are required, the A/E will prepare the required amendment. The A/E, however, shall not receive or respond to any direct inquiries from contractors.

3.9 A/E Services during Construction – Construction Period Administration (CPA):

CPA Services shall include, but are not limited to:

· review and approval of construction submittals covering products that have been listed within the contract documents and contractor substitutions, manufacturer’s data/performance sheets, samples, shop drawings, schedules, phasing plans;

· provide and maintain an updated submittal register

· compatibility analyses of different materials and recommendations associated with acceptanceor rejection of alternate materials and products;

· responses to Request for Information (RFI);

· change order review and recommendations;

· preparation of cost estimates to Request for Proposal (RFP);

· Cost/time/impact estimates and recommendations relevant to design omissions and construction plan deviations.

· site visits as required and/or requested by the VA Project Engineer for inspection of ongoing construction including final tests and inspections; documentation of all necessary site visits to the VA Project Engineer within one (1) week after the visit;

· verification of as-built conditions from contractor supplied marked up prints;

· preparation of as-built documents in accordance with Supplement “B” which the VA will retain permanently;

· IH services associated with any asbestos or lead abatement identified in the project.

The Government may issue a change order for the A/E to provide additional services to such as review of value engineering change proposals, preparation of design modifications, or other similar services during construction.

Electronic Construction Submittals:

· The A/E shall have the capability to electronically review and process construction submittals including digitally signing the Material Approval Submittal. A PDF writer (such as Adobe Reader/Writer or Pro V Nuance, etc.) is required by the A/E in order to process electronic construction submittals.

· The A/E shall provide and manage a file share site for the processing of electronic submittals. This file management site shall be set-up to allow the contractor to electronically submit the construction submittals, allow the A/E to review and process the submittals and allow the VA to review and process the submittals.

4. References/Design Criteria

4.1 Incorporated References/Design Criteria — The following documents form a part of this contract to the extent referenced are included in the A/E Scope of Work. Design requirements identified in these documents are part of the A/E Required Services. National Codes, Standards and other requirements referenced in these documents also become part of the A/E Required Services. Design Copies of these may be found on the internet at the VA’s Office of Construction & Facilities Management web site: http://www.cfm.va.gov.

Supplement “A” (attached)

Supplement “B” - A/E Submissions of Design Review Materials (attached)

Supplement “C” - A/E Minimum Submission Requirements (attached)

Asbestos Abatement Design Manual (by referenced)

Construction Standards (H-18-3); latest revision (by reference)

Master Specifications (PG-18-1); as revised by facility supplemented with PG-18-1 as needed (by reference)

DVA National CAD Standard Application Guide (by reference)

DVA National CAD Standards & Detail (PG-18-4); latest revision (by reference) Volume 1 Architectural; latest revision Volume 2 Site Engineering & Landscaping; latest revision Volume 3 Mechanical Engineering; latest revision Section 1 Plumbing & Sanitary Section 2 HVAC Section 3 Steam Generation & Distribution Volume 4 Electrical; latest revision

DVA Special Design Criteria; HVAC, Mechanical, Plumbing, Electrical, Structural, et al (by reference)

National Standard Plumbing Code (NAPHCC) (by reference)

National Electrical Code; latest revision (by reference)

Handicapped Standards; latest revision (by reference)

NFPA; latest revision (by reference)

Applicable VA Design Guides (by reference)

Applicable VA Design Alerts (by reference)

Applicable VA Design Manuals (by reference)

Applicable VA Quality Alerts (by reference)

Applicable VA Equipment Guide Lists (by referenced)

VA Equipment Reference Manual PG-18-6 (by referenced)

A/E Contract Procedures (by reference)

A/E Architectural Review Checklist (by reference)

A/E HVAC Review Checklist (by reference)

A/E Plumbing Review Checklist (by reference)

A/E Electrical Review Checklist (by reference)

A/E Coordination Drawing Checklist (by reference)

Manual for Preparation of Cost Estimates (by reference)

Applicable VA Energy Conservation & Sustainability Program requirements (by reference)

Preparation and Issuance of Construction Solicitation Contract Documents Manual (by reference)

A/E Submission Instructions for Minor and NRM Construction Program (PG-18-15) (by reference)

4.2 Energy Requirements for all New Construction, Major & Minor Renovation Projects (ASHRAE Standard 90.1-2007 Energy Standard for Buildings):

4.2.1 Major and minor Construction:

All new major & minor construction projects shall be designed to achieve an energy consumption level that is at least 30% below the level achieved under ASHRAE Standard 90.1-2013, if life-cycle cost effective. Use Appendix G of ASHRAE Standard 90.1-2013 to document the energy savings.

Should the 30% reduction in energy consumption prove not to be life-cycle cost effective, then the A/E shall evaluate alternative designs at 5% successive decrements in order to identify the most energy efficient design that is life-cycle cost effective.

The following parameters shall be used for performing the analysis:

· 20 year life-cycle period for system comparisons

· Use Public domain programs such as TRACE, E-CUBE, Carrier E20-II, Energy Plus, etc.

· 3% Discount Factor; and

· Neither method shall include taxes, nor insurance while computing cost.

4.2.2. Major and minor renovations and Major Equipment Replacements:

For major renovations: Shall include any renovation where an entire area is "gutted" and rebuilt, regardless of funding source (Major, Minor, NRM or CSI). Any replacement of central HVAC system or changes in air distribution shall be considered a "major Renovation."

Reduce the energy cost budget by 20% below pre-renovations 2003 baseline. A/E shall estimate 2003 baseline energy consumption before the renovation and compare it to the proposed design after the renovation, and document the 20% savings. The primary unit for energy budget reporting is the British Thermal Unit (BTU) per square foot of the area to be renovated. The A/E shall develop the energy budget as required in ASHRAE 90.1-2004, Appendix G, using the same parameters outlined above for new construction.

For NRM and CSI Projects: Where a small portion of a building, and only architectural treatments, or simple equipment replacement is planned. The renovation will have little to no impact on the central HV AC System, or energy use within the renovated area. The A/E shall design all renovated areas to comply with ASHRAE Standard 90.1 -2013 as a minimum. Design to better than ASHRAE Standard 90.1 -2013, when obviously life cycle cost effective. Appendix G analysis is not required for NRM and CSI projects.

Any part of the renovation which impacts energy consumption shall be designed with the mandate to reduce energy consumption. For example, if exterior walls are part of the project, then their R- Value shall be increased. If lighting fixtures are to be replaced, then they shall be replaced with the most energy efficient fixture that is cost effective (20 year life), and meets the lighting W /SF required in Chapter 9, ASHRAE Standard 90.1 -2013.

4.2.3 Renewable Energy Resources: For any work, renewable (geothermal, heat recovery, wind, PV solar, solar hot water, etc.) shall be evaluated for life-cycle cost effectiveness.

5. Design Budget —

5.1 A/E is responsible to develop a design that can be built within budget and function as intended without change orders. The design must be based on the reality of existing site conditions and not solely on “As-Built” drawings. The A/E as part of their site investigation is responsible for confirming all existing conditions that may affect the project construction.

5.2 Cost Estimating: A/E shall be responsible, as part of the Quality Assurance Plan, to develop procedures for tracking estimated construction costs throughout the project design. Cost estimates submitted as part of the submission requirements shall not be used as the sole method of meeting this requirement. The A/E shall notify the Project Engineer when estimated construction costs exceed the construction budget. The A/E shall be responsible for proposing alternates to bring the project cost estimate within the construction budget. A/E shall modify design elements as necessary to keep the project cost estimate within the construction funding level. These changes shall be made at no additional cost to the Government.

5.3 Construction Budget: $3,100,000

5.4 Deduct Alternates: Shall be utilized in the best interest of the Government for market condition variations to maximize the use of available Government funds. The Government shall select the proposed alternates from the A/E recommendations. Deduct Alternates shall not be used to bring the projected project costs within construction funding. These alternates are designed to assure a contract award and are in addition to the requirement to have a project design and estimate at or below construction funding. The A/E shall incorporate deduct alternates totaling at least 20% of the construction estimate into the project. The deduct alternates shall be clearly identified in the specifications General Requirements section and on the drawings.

5.5 Add Alternates: Shall not be used.

6. Design Phases —

6.1 Conceptual with Alternatives: Refer to Supplement A and B. Working with the VA Medical Center’s project team (Project Engineer and User Group) the A/E shall propose conceptual needs and requirements with proposed alternatives for the planned scope of work. This task is an iterative process requiring multiple proposals and revisions developed during site meetings.

6.2 Schematics: Refer to Supplements A, B, C. A/E shall develop specific design needs and requirements with proposed alternatives. These documents are to be developed from the documents, meeting minutes and recommendations made during the conceptual phase. Any existing utilities and/or equipment which are to be incorporated into the project design shall be reviewed and evaluated to assure that they are indeed there and are in sufficient quantity and condition to do so. Documents for this task define project requirements based on the planned scope of work. All required functional requirements shall be identified and incorporated into the project. All Architectural and Engineering requirements shall be identified and incorporated into the project. A/E shall provide an evaluation of the coordination of the drawings between disciplines; identification of errors, omissions or conflicts found within or between drawings and specifications.

6.3 Design Development: Refer to Supplements A, B, C. Any existing utilities and/or equipment which are to be incorporated into the project design shall be further reviewed and evaluated to assure that they are indeed there and are in sufficient quantity and condition to do so. Documents for this task define project requirements based on the approved scope of work. These documents are to be developed from the documents, meeting minutes and recommendations made during the schematics phase. All required functional requirements shall be identified and incorporated into the project. All Architectural and Engineering requirements shall be identified and incorporated into the project. A/E shall provide an evaluation of the coordination of the drawings between disciplines; identification of errors, omissions or conflicts found within or between drawings and specifications. A/E shall provide an evaluation of schedule to meet operating plan, project phasing and market conditions which may affect bidding. It is expected that at the completion of this phase marks the completion of the data gathering portion of the project. The A/E shall have obtained all information required (including site visits) to proceed directly the preparation of Construction Documents.

6.4 Construction Documents: Refer to Supplement C. The A/E shall develop complete drawings and specifications and other documents necessary for the bidding and construction of this project. These documents are to be developed from the documents, meeting minutes and recommendations made during the design development phase. A/E shall perform an evaluation of the coordination of the drawings between disciplines; identification of errors, omissions or conflicts found within or between drawings and specifications. A/E shall provide an evaluation of schedule to meet operating plan Invitation for Bids and Award dates, project phasing, and market conditions which may affect bidding.

6.5 Special Remarks: Cost estimates shall incorporate construction related issues which include but are not limited to materials, systems and construction techniques. Design documents review, analyses and recommendation of cost estimates covering labor, materials, equipment, general conditions and requirements developed for the project. Estimates shall allow for incorporation of review comments, which are within the Statement of Work.

7. Submittals and Performance Schedule —

7.1 Deliver Submission Documents to the VA Boston Healthcare Project Engineer (MS-138P).

The performance period will be project specific and will be specified with each scope of work.

Review of material with the VA will take place approximately 14 days after submission.

7.2 Submission Materials and Schedules: Refer to Supplement B. Reproduction, mailing and delivery time is inclusive to the stated durations.

7.3 Government Review, Comment Resolution, Meeting Minutes: The VA will review all submittals identified under this contract for functional and aesthetic relationship. The VA review may consist of written and/or oral comments at the discretion of the VA. VA review of the A/E’s work shall not be construed by either party to relieve the A/E from any requirements of this scope of work; the A/E is responsible for all design work. The A/E shall submit written responses to the VA's oral and written design review comments; these written responses shall be within seven (7) calendar days of the VA's comments; and these responses shall explain the action the A/E will take for each comment. The A/E will be responsible for taking minutes at meetings and submitting them to the project engineer for concurrence within seven (7) calendar days of the meeting. Both parties will discuss these comments, if necessary, and attempt to resolve any unsettled issues that may arise from the review. Time for reproduction and mailing is inclusive to the stated durations.

7.4 The A/E may choose to perform work, at its own risk, during the Government review and comment resolution period, however, comments resulting from that review must be incorporated into the design prior to the next submittal. In the event a subsequent design phase is not authorized, the A/E shall incorporate all available review comments into the design to complete the current phase.

7.5 Construction Execution:

Construction Documents to Bidders Date: To Be Determined (TBD) Bid Opening Date: TBD Actual Construction Contract Award: TBD Anticipated Construction Duration: TBD Construction Completion Date: TBD

8. Authorized Changes — The A/E shall only accept instructions and/or directions from the assigned Project Engineer. Changes in the project scope of work must be authorized by the VA Contracting Officer.

- - - E N D - - -

VETBIZ will be used to determine SDVOSB/VOSB status therefore firms need to be registered with the applicable NAICS Code 541330 at the time SF330’s is submitted.

The estimated magnitude of construction costs for this project:

Prospective firms are reminded to comply with Limitations on Subcontracting, in accordance with FAR 52.219-14 and VAAR 852.219-10. SF330 packages shall address how each firm anticipates meeting these criteria. This request is in accordance with the Selection of Architects and Engineers as implemented in Subpart 36.6 of the Federal Acquisition Regulation and Subpart 836.6 of the VA Acquisition Regulation. All submissions will be evaluated by the A/E Source Boards within NCO1. The Government will not pay, nor reimburse, any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. Firm(s) selected by the Selection Authority will be requested to submit Firm-Fixed-Price Proposals to include labor, overhead, profit, and other costs for the project for negotiation by the Contracting Officer prior to contract award. Such proposals shall be submitted using VA-standard A-E proposal cost breakdown templates.

C. THIS IS NOT A REQUEST FOR PROPOSAL:

This is a request for SF 330's Architect/Engineer Qualifications packages only. Any requests for a solicitation will not receive a response. No material will be issued, and no solicitation package or bidder/plan holder list will be issued.

D. EVALUATION SELECTION CRITERIA:

The selection criteria, in descending order of importance will be as follows:

1. Professional Qualifications

2. Reputation & Standing of Firm

3. Specialized Experience/Technical Competence

4. Teamwork

5. Capacity

6. Past Performance

7. Capability and commitment

8. Location

E. SELECTION CRITERIA DESCRIPTIONS:

The selection criteria descriptions (1 through 8) are provided below.

1. PROFESSIONAL QUALIFICATIONS NECESSARY FOR SATISFACTORY PERFORMANCE OF REQUIRED SERVICES

Provide brief resumes of proposed team members who will specifically serve as the Project Managers and Designers of Record. In addition, provide resumes of other relevant team members or frequent subcontractor(s) who will perform technical tasks under this contract including their record of working together. The Designers of Record shall perform and direct the design within their respective discipline and shall sign and seal the drawings. All Designers of Record must be professionally registered in their discipline. Each resume shall include a minimum of three (3) specific completed projects that best illustrate the individual team members experience relevant to this contract scope. All proposed team members and supervisors shall have the minimum education, training, and experience as is normally expected of a company actively providing the required services and shall have demonstrated experience to perform a project such as this within a VA Medical Center Hospital.

Additionally, the firm shall address the criteria for meeting the Limitations on Subcontracting.

2. REPUTATION AND STANDING OF THE FIRM AND ITS PRINCIPAL OFFICIALS

Documentation supplied should allow the evaluation team to assess this factor with respect to professional performance, general management, and cooperativeness.

3. SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE

Specialized experience and technical competence in health care facilities (to include joint ventures), including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials.

This factor evaluates the amount of experience the A/E firm has in designing similar types of work/facilities and evaluating their technical competence. The factor includes an emphasis, where appropriate, on the firm's experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials.

Provide a detailed narrative of up to 5 (maximum) relevant projects completed within the last 5 years, which best illustrate overall team experience relevant to this scope. List projects that demonstrate the teams experience with projects involving:

a.Healthcare/Hospital Design
b.Long Term Care Design
c.Clinical Design
d.LEED Building Certification

4. TEAMWORK

Documentation supplied should include specific experience and qualifications of personnel proposed for assignment to the project(s) and their record of working together as a team.

5. CAPACITY

This factor evaluates ability of the A/E firm, given their current projected workload and the availability of their key personnel, to accomplish the design project in the required time.

The general workload and staffing capacity of the design office will be evaluated.

a.List current projects with a design fee of greater than $25,000 being designed in the firms’ office;
b.Indicate the firms’ present workload and the availability of the project team (including sub-consultants) for the specified contract performance period; and
c.Describe experience in successfully delivering projects per performance schedule, providing timely construction support, and successfully completing multiple projects with similar delivery dates.

6. PAST PERFORMANCE

NCO 1 will evaluate past performance on recent and relevant contracts with Government agencies (emphasis on VA work) and private industry in terms of cost control, quality of work, compliance with performance schedules and a record of significant claims against the firm due to improper or incomplete engineering services (references required).

a. Recency is defined as performance occurring within 5 years of the date of this Notice, except that ongoing projects must have begun no less than one (1) year prior to the issuance of this Notice.

b. Relevancy is defined as performance of work on projects that are similar in scope to the type of project anticipated under the resultant contract.

Respondents with no previous past performance shall so state when addressing the selection criteria. Documentation supplied should detail firms’ ability to work with government entities and design standards or similar relevant experience with other entities.

a. Provide a copy of all performance evaluations (A/E) issued for government contracts (as applicable). For non-Federal contracts, provide facility owner documentation of the firms’ performance issued on that contract. If known documentation exists, so state.

b. Provide accessible owner points of contact: name, title, address, telephone number, e-mail, and fax number and provide copies of awards and letters of appreciation/recommendation as desired.

Past Performance Questionnaires (Attachment 1 to this Notice):

a. Respondents shall complete Section A (General Information) of the Past Performance Questionnaire and provide it to NCO 1 representative as part of the SF 330 submittal package.

b. Respondents shall submit the Past Performance Questionnaire Sections B through D and the Cover Letter to each Contracting Officer (or customer contact equivalent) and Project Manager (or customer contact equivalent) identified in its SF 330 Section F, “Example Projects Which Best Illustrate Proposed Team’s Qualifications for this Contract”. Sections B through D of the questionnaire shall be completed ONLY by the contract customer.

c. The contract customer shall complete sections B through D of the Past Performance Questionnaire and shall submit it directly to NCO 1 by the SF 330 submittal package due date identified in the Notice.

d. Past Performance Questionnaire Sections B through D will not be accepted from Respondents. Questionnaire sections B through D must come directly from the Respondent’s contract customer.

The Respondent bears the burden of providing relevant and timely references with accurate and current telephone numbers and addresses.

The Respondent is responsible for ensuring that the questionnaires issued by them are completed by the contract customer and submitted directly by the contract customer to NCO 1 at the address listed in this Notice, no later than the SF 330 submittal package due date designated in this Notice.

E-mailed Past Performance Questionnaire Sections B through D is preferred from the contract customer. If the contract customer chooses to email the past performance questionnaire sections B through D, they SHOULD NOT send the hardcopy via mail.

Respondents are notified that NCO 1 may use any additional sources of information (such as, but not limited to the Contractor Performance Assessment Reporting System (CPARS)) available to it regarding the Respondent’s relevant experience and past performance and consider the information thus obtained as part of this evaluation.

7. CAPABILITY AND COMMITMENT

The capability and commitment to provision accurate professional services during the construction period. This factor includes determining customer satisfaction, project cost, and meeting project schedule by:

a. Reviewing the firms’ record on timeliness in replies to RFIs, review of submittals & shop drawings, periodic construction inspections, and timely completion of as–built drawings.

b. Determining the accuracy of professional services through a review of the history of services support, value engineering and any deficiencies which may have resulted in additional costs to NCO 1.

8. LOCATION

a. The A/E Firm must be generally located or maintain a branch office in the geographic area of the VISN 1 VA Medical Centers.

1. Please provide the address of your closest office.

b. The A/E Firm must have general knowledge of the locality of the project.

F. QUESTIONS AND COMMENTS:

a. Questions and comments regarding this notice must be submitted by email only to the Contracting Specialist, Philip Silva, Philip.Silva1@va.go

G. SF 330 SUBMITTAL PACKAGE PAGE INSTRUCTIONS:

a. SF 330 submittal packages shall be submitted no later than 4:00pm EST om July 12th, 2021.

· Respondents are responsible for ensuring SF 330 submittal packages, any revisions, and modifications are submitted by this time.

b. Qualified A/E firms are required to submit ONE (1) electronic copy via email to Philip.silva1@va.gov. Email attachment file size limit is 7MB. Firms are required to create separate emails if total file size exceeds 7MB.

SF 330 forms are available on-line at: http://www.gsa.gov/portal/forms/type/SF

c. Submission of information incorporated by reference is not allowed.

d. Prospective firms shall address all selection criteria factors within their submitted SF 330 package.

e. Submissions are limited to 85 pages.

i. Absolutely no photographs shall be submitted.

ii. Title pages and tables of contents, if applicable, are excluded from the page count limitation.

iii. Pages submitted in excess of the limitations specified in this Notice will not be evaluated.

f. A page is defined as one side of a sheet, 8-1/2" x 11", with at least one inch margins on all sides, using not smaller than 12 point type. Foldout sizes count as an equivalent number of 8-1/2" x 11" pages. The metric standard format most closely approximating the described standard 8-1/2" x 11" size may also be used. This does not apply to the SF330 form.

g. Telephone or Fax inquiries will not be accepted.

H. SF 330 PACKAGE CONTENTS:

a. The SF 330 submittal packages shall consist of a completed SF 330 parts I and II, specific information addressing each of the EIGHT selection criteria described in this Notice; the additional information required by this Notice and past performance questionnaire section A.

b. Respondents are required to meet all requirements in addition to those identified as selection criteria

c. SF 330 submittal packages not consistent with the requirements and selection criteria of this Notice may be determined unacceptable and removed from consideration.

I. SF 330 PACKAGE PREPARATION:

a. Email attachment file size limit is 7MB. Firms are required to create separate emails if total file size exceeds 7MB.

SF 330 forms are available on-line at: http://www.gsa.gov/portal/forms/type/SF.

b. Electronic copy shall be in searchable PDF format of the SF 330 parts I and II, questionnaire Section A and additional information requested by this Notice.

c. A cover sheet should be included, clearly marked with the Respondent's name, complete address with 9-digit zip code, phone number, e-mail address, DUNs number, date of response, title and Notice identification.

d. Information not provided elsewhere in the SF 330 submittal package shall not be incorporated by reference.

e. A table of contents shall be provided for ready reference to sections and figures.

f. SF 330 submittal packages shall be consistent with the following structure and formatted accordingly:

SF 330 PART I – CONTRACT – SPECIFIC QUALIFICATIONS

1. Sections A through D

2. Section E

3. Section F

4. Section G

5. Section H

6. Section I

7. Questionnaire section A only

8. Other additional information and attachments

SF 330 PART II – GENERAL QUALIFICATIONS

(Note: Respondents shall clearly label additional information and attachments).

J. Contracting Officer Contact Information:

Phi…