This document outlines the architectural and engineering services required by the Department of Veterans Affairs for upgrades to the heating, ventilation and air conditioning systems at the Jamaica Plain campus of the VA Boston Healthcare System. The selected firm will be responsible for developing drawings, specifications, cost estimates, construction schedules and other documents through five design phases culminating in final "as-built" plans incorporating any changes from construction. Deliverables include both physical and electronic copies of design packages and supporting documentation. The project schedule allocates 225 calendar days from notice to proceed for completion, including user group meetings and design reviews at 30%, 60%, 90% and 100% completion milestones. The related pre-solicitation lists the opportunity for these A/E services under solicitation number 36C24121R0136 for project 523-09-156 to upgrade HVAC systems at the Jamaica Plain facility.

View the file

Other files for this federal contract opportunity

Other files attached to C1DA--523-09-156 - SPD HVAC Upgrades, newest first.
File Type Posted
A-E Supplement C 523-09-156.pdf PDF
AE Sources Sought Notice.docx DOCX document
36C24121R0136.docx DOCX document
A-E Supplement A 523-09-156.pdf PDF
PRESENT-PAST PERFORMANCE SURVEY.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPD Service HVAC Corrections Project # 523-09-156

SUPPLEMENT “B”

A/E SUBMISSIONS

OF DESIGN REVIEW MATERIAL

FIRST REVIEW (Conceptual – Preliminary User Group Meetings & Field Surveys) (per meeting)

2 Set of AutoCAD and PDF conceptual/preliminary drawings in electronic format in accordance with Supplement “A”

1 Set of full size (24 inches by 36 inches) conceptual/preliminary layout plans/details 2 Sets of reduced size (15 inches x 22 inches) conceptual/preliminary layout plans with proposed alternates 3 Sets of Preliminary Investigation Report with Recommendations and Alternates 2 Set of Preliminary Investigation Report with Recommendations and Alternates in pdf electronic format in accordance with Supplement “A” 2 Sets of conceptual/preliminary estimates with proposed alternates 2 Set of MS Excel conceptual estimates in electronic format in accordance with Supplement

“A”

SECOND REVIEW (30% Submittal – Schematics)

2 Sets of AutoCAD & PDF design drawings in electronic format in accordance with Supplement “A”

1 Set of full size (24 inches by 36 inches)bound design development layout plans/details with phasing plans

2 Sets of reduced size (15 inches x 22 inches) bound design development layout plans/details with phasing plans

2 Sets of design analysis 2 Set of design analysis in electronic format in accordance with Supplement "A" 2 Sets of bound design development specifications with Mylar front and back cover sheets 2 Set of MS Word design development specifications in accordance with Supplement “A” 2 Sets of design development cost estimates

2 Set of MS Excel design development cost estimates in electronic format in accordance with Supplement “A”

THIRD REVIEW (60% Submittal – “DD” Design Development)

2 Sets of AutoCAD & PDF design drawings in electronic format in accordance with Supplement “A”

1 Set of full size (24 inches by 36 inches)bound design development layout plans/details with phasing plans

2 Sets of reduced size (15 inches x 22 inches) bound design development layout plans/details with phasing plans

2 Sets of design analysis 2 Set of design analysis in electronic format in accordance with Supplement "A" 2 Sets of bound design development specifications with Mylar front and back cover sheets 2 Set of MS Word design development specifications in accordance with Supplement “A” 2 Sets of design development cost estimates 2 Set of MS Excel design development cost estimates in electronic format in accordance with

Supplement “A”

FOURTH REVIEW (90% Submittal – “CD” Construction Documents)

SPD Service HVAC Corrections Project # 523-09-156

2 Sets of AutoCAD & PDF construction drawings in electronic format in accordance with Supplement “A”

2 Sets of full size (24 inches by 36 inches) bound construction documents plans/details with phasing plans

2 Sets of reduced size (15 inches x 22 inches) bound construction documents plans/details with phasing plans

2 Sets of design analysis 2 Set of design analysis in electronic format per Supplement "A" 2 Sets of phasing and construction project schedules 2 Sets of phasing and construction project schedules in electronic format per Supplement “A” 2 Sets of bound construction specifications with Mylar front and back cover sheets 2 Sets of MS Word construction specifications in accordance with Supplement “A” 2 Set of MS Excel construction estimates in electronic format in accordance with Supplement

“A” 2 Sets of construction cost estimates 2 Sets of construction cost estimates in accordance with Supplement “A”

FIFTH REVIEW (100% Submittal – Bid [Final] Documents)

2 Sets of AutoCAD & PDF bid drawings in accordance with Supplement “A” 1 Set of approved full size (24 inches by 36 inches)Mylar drawings with Registered Architect

(RA) and Professional Engineer (PE) stamps 2 Sets of full size (24 inches by 36 inches) bound drawings with RA and PE stamps 2 Sets of reduced size (15 inches x 22 inches) bound bid plans/details with RA and PE stamps 2 Sets of MS Word specification sections in accordance with Supplement “A” 2 Sets of MS Word specification sections merged in accordance with Supplement “A” 2 Sets of phasing and construction project schedules 2 Sets of phasing and construction project schedules in electronic format per Supplement “A” 1 Set of final specifications boxed on single sided sheets 1 Set of bound specifications paginated front to back with Mylar front/back cover sheets 1 Set of 3-ring bound specifications paginated front to back 2 Sets of final construction cost estimates 2 Set of MS Excel construction cost estimates in electronic format in accordance with

Supplement “A”

SIXTH REVIEW (Project Close Out Submittal – “As-Built” Construction Documents)

2 Sets of AutoCAD & PDF As-Built drawings in accordance with Supplement “A” 1 Set of approved full size (24 inches by 36 inches) As-Built Mylar drawings with RA and PE stamps 1 Set of full size (24 inches by 36 inches)bound drawings with RA and PE stamps 2 Sets of approved reduced size (15 inches x 22 inches) As-Built plans/details with RA and PE stamps

Project Design Schedule

Facility: DVA – Boston Healthcare System, Jamaica Plain A/E Firm: TBD Project Title: Supply Process Distribution Service HVAC Project Number: 523-09-156 Duration: 225 Calendar Days after Notice to Proceed

ID Milestone Task Description Duration Schedule Date

Actual Date

1 User Group Preliminary Mtg (Review Scope, Site Survey Investigation) 1 Day NTP + 10

2 Preliminary Investigation of Existing Conditions As Needed

3 Submit Conceptual Layout Schemes with Proposed Alternates ---

4 User Group Mtg (Review Proposed Schemes) --- NTP + 35

5 Submit Revised Conceptual Layout Plans with Proposed Alternates ---

6 User Group Mtg (Review Conceptual Plans) --- NTP + 45

7 Submit Conceptual Layout Design for Approval ---

8 User Group Mtg (Review/Approve Conceptual Plans) 1 Day NTP + 70

9 Prepare 30% Schematic Design Submissions As Needed

Survey Existing Conditions, Coordinate Design with Consultants & VA Comments

10 Submit 30% Schematic Design Package ---

VA Engineering 30% Review 14 Days (Min)

11 User Group 30% Schematic Design Review Meeting 1 Day NTP + 120

12 Prepare 60% “DD” Design Development Submissions ---

Confirm Existing Conditions, Coordinate Design with Consultants & VA Comments As Needed

13 Submit 60% “DD” Design Development Package ---

VA Engineering 60% Review 14 Days (Min)

14 User Group 60% “DD” Review Meeting 1 Day NTP +170

15 Prepare 90% “CD” Construction Document Submissions ---

Coordinate Design with Consultants, Existing Conditions & VA Comments As Needed

16 Submit 90% “CD” Construction Documents Package (A/E 100% design) ---

VA Engineering 90% Review 14 Days (Min)

17 User Group 90% “CD” Review Meeting 1 Day NTP + 205

18 Prepare 100% Bid Final Documents ---

Finalize Coordination with Consultants, Existing Conditions & VA Comments As Needed

19 Submit 100% Bid Final Documents with RA and PE Stamps --- NTP + 225