Advertisement - 7123 Adams Branch Library GCs and Subs.pdf
PDF 24 KB Posted
- Solicitation number
- BD-19-1142-PFD01-PFD01-36692
- Issued by
- Suffolk County, Massachusetts
About this file
This document is a Request for Qualifications (RFQ) issued by the City of Boston Public Facilities Department for the Adams Branch Library Renovations project, Project No. 7123. The project involves the demolition of the existing Adams Street Library building and construction of a new approximately 13,900 square foot single-story replacement library. The work includes a new building envelope, finishes, mechanical systems, site work, and other items to achieve LEED Silver certification. The RFQ seeks statements of qualifications from subcontractors and general contractors for various trade packages, including masonry, painting, ironwork, fire protection, plumbing, HVAC, roofing, electrical, glass and glazing, and flooring. The estimated construction cost is $11.6 million, with an anticipated 60-week construction duration. Qualifications statements are due by April 2, 2019, and prequalified bidders will be invited to submit filed sub-bids and general bids in May 2019.
The RFQ outlines specific prequalification criteria, including management experience, references, and financial capacity. Contractors must also comply with prevailing wage and workforce participation requirements, including 25% minority, 10% female, and 50% Boston resident workforce participation. The project is funded by the City of Boston and is not subject to any set-aside or MWBE requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE TO CONTRACTORS
CITY OF BOSTON
PUBLIC FACILITIES DEPARTMENT (PFD)
REQUEST FOR QUALIFICATIONS (RFQ)
Adams Branch Library Renovations; Project No. 7123
Pursuant to M.G.L. c.149, sections 44D ½ and 44D ¾ the City of Boston, acting by its Public Facilities Commission, through its Director of the Public Facilities Department, with an office address of 26 Court Street, 10th Floor, Boston, MA 02108, hereinafter referred to as Awarding Authority, hereby requests statements of qualifications (SOQ) from subcontractors and general contractors for the Adams Branch Library Renovations located at 690 Adams Street, Dorchester, MA. Noted below are the sub-trades and estimated costs for which SOQ are being requested:
Masonry ($55,900) Painting ($34,000) Misc. and Orn. Iron ($37,390) Fire Protection ($120,100) Waterproofing, Damp-proofing Plumbing ($140,700) & Caulking ($157,700) HVAC ($709,600) Roofing and Flashing ($553,600) Electrical ($728,800) Glass and Glazing ($98,000) Tile ($31,500) Resilient Floors ($44,000)
Project description: The Adams Street Library will be built as a replacement library for the existing building. The new library is programmed for approximately 13,900 gross square feet as a single story building. The work includes demolition of the existing building, removal of an underground oil storage tank, the new project will qualify for LEED Silver and include new building envelope, finishes, mechanical systems, site work and other items needed for a complete new renovation.
The RFQ is used to pre-qualify subcontractors and general contractors. Those who are prequalified will be invited by the Awarding Authority to submit filed sub-bids and general bids pursuant to M.G.L. c.149, §§ 44E and 44F. After the prequalification process, a list of pre-qualified subcontractors and general contractors will be provided to all pre-qualified bidders.
The estimated cost of construction is: $11,600,000 The anticipated construction duration from Notice to Proceed: 60 weeks
RFQ packets may be obtained on or about March 11, 2019 9:00 A.M. to 4:00 P.M. from the PFD Bid Counter, 26 Court Street, 10th Floor, Boston, MA, 02108 (617) 635-4809.
SOQ in response to this RFQ shall be signed under pains and penalties of perjury. SOQ must be received on or before April 2, 2019, 12:00 p.m. at the PFD Bid Counter, 26 Court Street, 10th Floor, Boston, MA 02108. LATE RESPONSES WILL NOT BE ACCEPTED. The anticipated date for completion of evaluation is April 30, 2019. The anticipated date for document availability to pre-qualified general contractors and subcontractors is May 8, 2019
Please submit one (1) original, four (4) exact copies and one (1) electronic copy of the submission on a flash drive and place all contents in a sealed package marked:
SOQ for Subcontracting Services
SOQ for General Contracting Services
The Awarding Authority reserves the right to waive any minor informalities in or to reject any and all SOQ if it is in the public interest to do so.
Any unauthorized communication or contact with the Awarding Authority is prohibited outside of any official meetings. Upon completion of the evaluations, the contents of the SOQ shall be open to the public, except for financial information, which is not a public record as defined in M.G.L. c.4, § 7.
Criteria for Prequalification
1. Management Experience - (50 points available; minimum of 25 points required for prequalification approval)
a. Business Owners: (5 [GC] or 0 [Sub] points available)
b. Management Personnel: (10 [GC] or 15 [Sub] points available)
c. Similar Project Experience: (25 [GC] or 30 [Sub] points available)
d. Terminations: (potential deduction up to 8 [GC] or 10 [Sub] points available)
e. Legal Proceedings: (potential deduction up to 8 [GC] or 10 [Sub] points available)
f. Safety Record: (5 [GC] and 5 [Sub] points available)
g. Workforce Compliance Record: (5 [GC] points available)
2. References - (30 points available; minimum of 15 points required for prequalification approval)
a. Project References: (10 points available)
b. Credit References: (5 points available)
c. Public Project Records: (15 points available)
3. Capacity to Complete Projects - (20 points available; minimum of 10 points required for prequalification approval)
a. Audited financial statement for most recent fiscal year: (0 points)
b. Revenue Under Contract for the next three fiscal years: (20 points)
4. Mandatory Requirements - (no points assigned)
a. Bonding Capacity at 100% of estimated contract value from a surety company
b. DCAMM Certificate of Eligibility for specified trade(s)
c. DCAMM Update Statement
Contractors shall pay special attention to the following:
1. The attention of all contractors is directed to the Compliance Contract Supplement section of the specifications and the obligation of the contractor to take affirmative action in connection with employment practices in the performance of the work. The contractor and its subcontractors shall maintain the following ratios of workforce hours in each trade: Minority 25% of total work hours, Female: 10% of total work hours, Boston Residents: 50% of total work hours. Contractors are hereby notified that this project is subject to M.G.L. c.149, §27 and in accordance contractors must pay prevailing wages as set by the MA Commissioner of the Dept. of Labor Standards.
2. The attention of all contractors is also directed to APPENDIX A of the RFQ regarding DCAMM certification and an original, stamped Sponsor Verification letter from the Commonwealth of Massachusetts Department of Labor Standards– Division of Apprenticeship Training. The requirements of the DCAMM certification, DCAMM Update Statement and the Sponsor Verification letter must be complied with and submitted with the SOQ.
Project Team
Awarding Authority: City of Boston, Public Facilities Department, Patricia M. Lyons, Director
Architect: NADAAA, Inc.
Senior Project Manager : James McGaffigan
March 11, 2019 Patricia M. Lyons Director
| SOQ for Subcontracting Services |
| Project Team |
File details come from the government source that posted it. Updated .