ADDITIONAL TECHNICAL SPECIFICATIONS
THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END TO THE GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM CJON: SF10MAR229867 MEANING THAT THE
PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MANHOLES, CONDUIT, CENTRAL OFFICE
LOCATIONS), AND FIBER BUILDS. ADDITIONALLY, AS A MINIMUM MUST HAVE 50 METERS PHYSICAL
SEPARATION FROM CJON: SF10MAR229867.
THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR TECHNICAL
REVIEW SHOWING THE ROUTE FROM THE COMMERCIAL DEMARCS TO THE SUPPORTING CENTRAL
OFFICES AND/OR WIRING CENTERS. DRAWINGS MUST INCLUDE TOTAL FIBER MILES AND REMARKS
CONTINUED: ROUND TRIP DELAY (RTD).
SITE SURVEYS ARE AUTHORIZED AT BOTH GOVERNMENT SITES.
SINGLE MODE FIBER MUST BE ENGINEERED/PROVISIONED IN SUCH A WAY THAT THE GOVERNMENT
CAN CHANGE/REVISE CHANNELIZATION WITHOUT TELECOM PROVIDER INTERVENTION.
NOTE 1 (JITTER): IN A STEADY-STATE CONDITION, THE PATTERN OF SYNCHRONOUS TRANSPORT SIGNAL (STS) POINTER ADJUSTMENTS, SDN TO SDN (END-TO-END THROUGH THE SERVICE PROVIDED NETWORK OUTPUTS), SHALL BE NO MORE STRESSFUL (I.E., CREATE MORE JITTER THROUGH THE DESYNCHRONIZER AS DESCRIBED IN TABLE 6 OF ANSI T1.105.03-1994) THAN THE POINTER ADJUSTMENT SEQUENCE IN FIGURE 5 OF ANSI T1.105.03-1994. DURING TRANSIENT EVENTS (WHICH SHALL OCCUR NO MORE THAN 2 TIMES PER DAY), THE PATTERN OF STS POINTER ADJUSTMENTS, SDN TO SDN (END-TO-END THROUGH THE SERVICE PROVIDED NETWORK OUTPUTS), SHALL BE FOUR OR LESS PER HOUR. ADDITIONALLY, THE MAXIMUM TIME INTERVAL ERROR (MTIE) OVER A PERIOD OF S SECONDS, OR WANDER, SHALL NOT
EXCEED (.01S + 10000) NANOSECONDS FOR VALUES OF S GREATER THAN 10,000.
WAVELENGTH TRANSMISSION SERVICES: WAVELENGTH TRANSMISSION SERVICES FOR RATES OF
10GBPS SHALL BE IN ACCORDANCE WITH ITU-T RECOMMENDATIONS G.709(03/2003), G.707(12/03), G.957(03/06), G.692(10/98) & TELCORDIA GR253-IE4. THE PROVIDED WAVELENGTH TRANSMISSION SERVICE SHALL NOT INHIBIT GOVERNMENT OPERATION OF UNDERLYING PROTOCOLS AND TRANSPORT SYSTEMS SUCH AS, BUT NOT LIMITED TO, SONET/SDH, IP, ATM, GIGABIT ETHERNET, AND ENCRYPTION.
THE WAVELENGTH TRANSMISSION SERVICE PROVIDED SHALL PASS ALL PAYLOAD, PATH & LINE
OVERHEAD BYTES TRANSPARENTLY (UNTOUCHED/UNALTERED) AND WITHOUT MONITORING SDP TO
SDP. THERE SHALL NOT BE ANY LINE TERMINATING EQUIPMENT (LTE) BETWEEN SDP AND SDP.
SINGLE MODE FIBER MUST BE TERMINATED TO THE LINE SIDE OF THE FIBER TERMINATING PATCH PANEL INSTALLED IN THE DISA IE1 PROVIDED MSPP SUITE FT JACKSON, AND THE FIBER TERMINATING
PATCH PANEL INSTALLED IN THE DISA IE1 PROVIDED ODXC SUITE INSTALLED AT FT GORDON. THE TELECOM PROVIDER MUST CONTACT DISA GOC TIER-II ENGINEERING UPON RECEIPT OF A VALID TSO TO
ESTABLISH THE COORDINATION AND ACTIVATION PROCESS. PRI POC: DISA GLOBAL CASA
INFRASTRUCTURE INTEGRATION LEASE BB TEAM PHONE: (C) 618-418-9813, (D) 418-9813
EMAIL: DISA.SCOTT.GLOBAL.MBX.CASA-INFRASTRUCTURE-INTEGRATION-LEASE-BB-T@MAIL.MIL
ALT POC: ORGANIZATIONAL NUMBER (CASA RF CIRCUIT ACTIVATIONS) PHONE: (C) 618-418-8691, (D) 418-8691 EMAIL: DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL ONCE TELECOM PROVIDER HAS COMPLETED INSIDE WIRING FROM THEIR FIBER DISTRIBUTION PANEL INSTALLED IN THEIR DWDM EQUIPMENT SUITE TO THE GOVERNMENT SERVICE DELIVERY POINT (SDP) AT EACH mailto:DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL
LOCATION, THEY MUST ENSURE THE LIGHT LEVEL READINGS (DB LOSS) ARE ADJUSTED TO READ -3 TO -9 LOSS. ADDITIONALLY, THESE LEVELS MUST BE DOCUMENTED ON THE NOTICE OF COMPLETION (NOC)
SENT TO DITCO.
THE VENDOR MUST TERMINATE SINGLE MODE FIBER AT BOTH LOCATIONS IAW UNIQUE INSTALLATION
FACTORS.
THE SINGLE MODE FIBER MUST PASS A DOCUMENTED SATISFACTORY 72 HOUR END TO END TEST IAW
ITU STANDARD M.2101 PRIOR TO TURN-UP TO THE GOVERNMENT.
CIRCUIT PARAMETERS:
1. VENDOR MUST MEET SVC DATE.
2. CIRCUIT REQUIRES THE FOLLOWING PARAMETERS:
(A) FIBER TERMINATION: SINGLE-MODE INTERFACE REQUIREMENT/INTERFACE DATA RATE: LINE CODING, FRAME FORMAT, PHYSICAL CONNECTOR, 10 GBPS, NRZ, SCRAMBLED PER ANSI T1.104-1991 (R2003). ALL OPTIONS DEFINED SC CONNECTOR, SINGLE-MODE FIBER PER ANSI T1.105.06-2002 (SR-0, SR-1, IR-1, IR-2, LR-1, LR-2, LR-3).
(B) LINE MUST REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY, SEVEN DAYS
PER WEEK, AT LEAST 99.5% OR BETTER.
(C) ONE-HOUR RESPONSE TIME TURN-AROUND MUST OCCUR TO REPAIR ONCE TROUBLE-CALL HAS
BEEN REPORTED.
(D) GFE CLOCKING: VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT.
(E) SINGLE MODE FIBER TERMINATIONS "SC" CONNECTORS.
(F) NO NETWORK INTERFACE UNIT.
(G) DEDICATED PATH.
(H) CARRIER REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.
(I) THE VENDOR MUST CONDUCT A 72 HOUR SATISFACTORY END TO END TEST ON THE 10GB WAVE SERVICE IAW ITU STANDARD M.2101. ADDITIONALLY, THE VENDOR TEST SET/SETS MUST HAVE THE ABILITY TO PRINT THE TEST RESULTS AND THOSE RESULTS MUST BE EMAILED TO THE ACCEPTING
AUTHORITY FOR REVIEW.
(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONAL CENTER.
(K) THE COMMERCIAL CIRCUIT WILL BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE DGOC:
PRI POC: DISA GLOBAL CASA INFRASTRUCTURE INTEGRATION LEASE BB TEAM
PHONE: (C) 618-418-9813, (D) 418-9813, EMAIL: DISA.SCOTT.GLOBAL.MBX.CASA-INFRASTRUCTURE-
INTEGRATION-LEASE-BB-T@MAIL.MIL
ALT POC: ORGANIZATIONAL NUMBER (CASA RF CIRCUIT ACTIVATIONS)
PHONE: (C) 618-418-8691, (D) 418-8691
EMAIL: DISA.SCOTT.GLOBAL.MBX.RF-CIRCUIT-ACTIVATIONS@MAIL.MIL
(L) THE VENDOR MUST PROVIDE THE LONG-HAUL CIRCUIT NUMBER AND THE 1-800 TROUBLE REPORT NUMBER TO THE ACCEPTING AUTHORITY PRIOR TO THE GOVERNMENT ACCEPTING SERVICE. INSIDE
WIRING MUST BE COMPLETED AND TESTED PROPERLY IAW THE ORDER PRIOR TO TURN-UP TO
THE GOVERNMENT.
3. VENDOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SINGLE MODE FIBER IAW
UNIQUE INSTALLATION FACTORS.
4. INSIDE WIRING IS AUTHORIZED IAW WITH THE UNIQUE INSTALLATION FACTORS.
5. VENDOR MUST COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING
ACCESS TO FACILITIES AT BOTH USER LOCATIONS.
6. FOR UNSATISFACTORY SERVICE OR TO REPORT EQUIPMENT AND/OR CIRCUIT PROBLEMS INVOLVING DISA PROVIDED TRANSPORT AND/OR EQUIPMENT, PLEASE CONTACT THE DISN CUSTOMER CONTACT CENTER (DCCC) SCOTT AFB, IL. TOLL FREE: 1-855-868-9500, COML: 618-418-9500, DSN: 312-418-9500.
MINIMUM TECHNICAL SPECIFICATIONS:
SPECIFIC FORMAT TO BE USED IS:
LINE RATE: 10GB.
LINE CODE: NRZ.
FRAME FORMAT: SCRAMBLED IAW ANSI T1.104-1991 (R2003).
TEST AND ACCEPTANCE: FIBER OPTIC 10GB WAVE CIRCUITS SHALL PASS A FULLY DOCUMENTED SATISFACTORY SOAK TEST BY THE GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-418-8691, (D) 418-8691.
THE WAVELENGTH TRANSMISSION SERVICE PROVIDED SHALL MEET THE FOLLOWING PERFORMANCE
REQUIREMENTS ON A MONTHLY BASIS.
PERFORMANCE REQUIREMENT/PERFORMANCE SPECIFICATION: NON-DIVERSE/NON-PROTECTED
AVAILABILITY: GREATER THAN OR EQUAL TO 99.5% OR BETTER.
MONTHLY SHORT INTERRUPTION EVENT COUNT (SEIC): LESS THAN OR EQUAL TO 9%.
ERRORED SECONDS (ES): LESS THAN OR EQUAL TO 0.005%.
SEVERELY ERRORED SECONDS (SES): LESS THAN OR EQUAL TO 0.00035.
BACKGROUND BLOCK ERROR RATIO (BBER): LESS THAN OR EQUAL TO 5X 10-6.
BIT COUNT INTEGRITY (BCI)/PATTERN SLIP (PAT SLIP): LESS THAN OR EQUAL TO 1 PER 72 HOURS.
JITTER: SEE NOTE 1 (JITTER).
BER: LESS THAN OR EQUAL TO 1X10-12.
DELAY (ONE WAY): * LESSER OF 10 MSEC OR (0.01 X D MSEC) *
WHERE "D" IS THE SDP TO SDP TRANSMISSION DISTANCE, MEASURED SHORTEST GREAT CIRCLE, IN
KILOMETERS.
ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED IN MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTOR’S
PROPOSAL, DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.