About this file
This is Addendum No. 2 issued by Lane Engineering, LLC on behalf of the Dorchester County Department of Public Works and the City of Cambridge for the Cambridge Rails to Trails project. The addendum addresses pre-bid questions and provides clarifications on project requirements including ADA compliance specifications, site conditions, materials, and construction standards. Key project details include an estimated Notice to Proceed (NTP) of February 18, 2026, with a bid submission deadline of Wednesday, February 11, 2026 at 10:30 am. Notable clarifications address pedestrian push button relocation (no relocation required), split rail fence specifications (10-foot wide sections are acceptable), lighting conduit requirements (two 1-inch PVC ducts with pull strings, no conductor cable installation required), and debris disposal procedures (contractors should verify acceptance directly with the county landfill). As-built certification may be provided by either a licensed engineer or surveyor.
The project is funded through Rural Maryland Economic Development Funds and a DNR Green Space Equity Grant. Bidders are required to provide a maintenance bond equal to 10 percent of the total project contract amount along with all other standard bonding requirements. All prospective bidders must acknowledge receipt of both Addendum No. 1 and Addendum No. 2 on the proposal page in specification section 0300-Proposal upon bid submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 240230 - RTT Site Construction Plans 2025-07-07.pdf | ||
| Proposal Sec 300 revised Add 1.pdf | ||
| Rails to Trails Single Phase RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lane Engineering, LLC Established 1986
Civil Engineering • Land Planning • Land Surveying • Environmental • Marine
15 Washington Street 117 Bay Street 354 Pennsylvania Avenue
Cambridge, Maryland 21613 P.O. Box 1767 Centreville, Maryland 21617 Tel 410-221-0818 Easton, Maryland 21601 Tel 410-758-2095 Fax 410-476-9942 Tel 410-822-8003 Fax 410-758-4422
Fax 410-822-2024 www.leinc.com general@leinc.com
January 30, 2026
Cambridge Rails To Trails - Project Bid
ADDENDUM No. 2
Prospective Bidders, This addendum is being issued to address pre-bid questions received by the Dorchester County Department of Public Works and to provide additional information for the subject project. Upon submission of your bid, please acknowledge receipt of Addendum No. 1 and this Addendum No. 2 on the Proposal page found in specification section 0300-Proposal.
1. Who is funding this project?
Rural Maryland Economic Development Funds and DNR - Green Space Equity Grant
2. When is the estimated NTP?
February 18, 2026
3. As-built certification:
Can be provided by a licensed engineer OR surveyor.
4. Currently there is a pedestrian push button station where the 10’x10’ ADA compliant concrete landing ties into Washington Street. Will this need to be relocated?
No.
5. Will the county landfill accept the brush and tree debris from the clearing operation?
J:\2024\0200\240230\Engineering (Red)\ConstructionAdmin\Pre Bid, Bid RFIs & Addendums\Addendum 02\2026-01-30-RTT- AddendumNo2.docx
It is assumed so. However, contractors are encouraged to verify direct with the landfill.
6. Split rail sections are usually 10' wide as the rails are 11' wide and they interlock 6" over every 10’ at the post. The detail is calling for 8' wide sections. Please advise.
10’ wide sections are acceptable.
7. Additional information on the lights:
Conduits between the lights shall include two 1” PVC ducts.
The contractor does NOT need to provide or install conductor cable in the conduit, however both conduits shall include pull strings.
A light pole concrete base detail is attached. The contractor shall utilize the pole base template and anchor bolts as recommended by or provided by the lighting vendor.
Junction/Pull boxes between the lights will not be required.
8. Will we be required to provide a maintenance bond for 10% of the project contract amount along with all the other bonds we have to have?
Yes
The bid due date remains Wednesday, February 11, 2026 at 10:30 am, same location as specified in the bid documents. Thank you for your interest in this project. Dorchester County and the City of Cambridge look forward to receiving your bids.
Respectfully, Lane Engineering, LLC
Tim Glass, P.E.
Principal, VP
Cc: All project bidders Advertisement platforms
Wanye Suggs, City of Cambridge Director of Public Works Stephanie Newcomb, Dorchester DPW