This is Addendum No. 1 issued by the Michigan Department of Environmental Quality (MDEQ) - Remediation and Redevelopment Division (RRD) for the Grant Mini-Mart Demolition & Source Soil Removal project at 92 S. Maple Street in Grant, MI. The addendum revises the bid due date from March 14, 2018 to March 21, 2018 at 2:00 PM EDST and extends the contract completion time to 60 calendar days from Notice-to-Proceed. The project scope includes demolition, transportation, and recycling/disposal of the Mini-Mart building, canopy, asphalt parking lot, light poles, and ancillary structures, as well as excavation, transportation and disposal of petroleum contaminated soil, backfill and compaction of excavation, gravel surface course, and site restoration.
The addendum includes several technical clarifications, including that groundwater dewatering is not required, excavation depth will terminate one foot above the static groundwater surface (estimated around 19-20 feet below grade), and a slide-rail system from Efficiency Productions is mandatory with no substitutions allowed. Drawing Figure C-3 was revised to C-3R to include additional requirements for the western side-wall excavation. All materials removed must be disposed of at licensed waste facilities, and asbestos abatement costs should be included in the demolition bid item rather than the provisionary allowance. The MDEQ strongly encourages completing work before June 11, 2018 to avoid conflicts with scheduled MDOT road construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2 17316.pdf | ||
| DTMB-0415 (Advertisement).pdf | ||
| Drawings Package.pdf | ||
| DCSpec(v082017).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date Issued: March 12, 2018 Department: MDEQ – Remediation and Redevelopment Division (RRD) Professional: Superior Environmental Corp.
Project Name: Grant Mini-Mart Demolition & Source Soil Removal 92 S. Maple Street, Grant, MI 49686 File Number: 761/17316.SAR Index Number: 44901
Original Bid Due Date: 2 pm EST, Wednesday, March 14, 2018 Revised Bid Due Date: 2 pm EDST, Wednesday, March 21, 2018
ADDENDUM NO. 1
To: Prospective Bidders
Subject: Revision and Clarification of Bidding Documents
Intent: The following Addendum items form part of the Bidding Documents and revise the original Bidding Documents dated February 14, 2018, as noted below.
Receipt of this Addendum must be acknowledged by the Bidder in space provided on the Bid Form. Failure of a Bidder to acknowledge this Addendum may cause the Bidder to be disqualified.
CHANGES TO PROJECT MANUAL
A. Revise the second sentence of item 1, Section 00010 Pre-Bid Information, with the revised bid due date of Wednesday March 21, 2018 at 2:00 PM (EDST).
B. Revise the first sentence of item 23, Section 0100 Instructions to Bidders, to change the contract completion time to sixty (60) calendar days from the date of Notice-to-Proceed.
CHANGES TO PRIOR ADDENDA
None
CHANGES TO PROJECT DRAWINGS
Figure C-3 “Excavation Plan” has been revised as Figure C-3R to include an additional note about the slide-rail system. The note adds a construction related requirement to the Western side-wall of the proposed excavation extent.
Figure C-3R shall replace Figure C-3, and is hereby a part of these Bidding Documents.
ATTACHMENTS
Revised Bid Summary sheet with updated bid due date to March 21, 2018 at 2:00 PM EDST, and updated contract completion time to Sixty (60) calendar days from the Notice-to-Proceed.
Revised drawing, Figure C-3R “Excavation Plan”.
Grant Mini-Mart Demolition & Source Soil Removal, Addendum No. 1, March 12, 2018
A copy of the Pre-Bid Sign-In sheet from the February 26, 2018 on-site pre-bid meeting.
CLARIFICATIONS
The following questions by prospective bidders were received on or before the Wednesday 2:00 pm (EST) March 7, 2018 deadline. Responses to the questions have been included following each questions, and are intended as clarification to the Bidding Documents.
Q1. Can (you) provide an assumed amount of groundwater we should plan on transporting and disposal?
R1. Groundwater dewatering (i.e. depression) is not a requirement of these Bidding Documents. As shown on the Contract Drawings, the limits of the excavation will be the natural groundwater elevation/level. It is also the intention that any precipitation events, shallow perched groundwater, or storm-water run-off that enters the excavation will become groundwater and therefore not require dewatering.
Q2. Can you clarify the design depth of the excavation? Are we going to 100% of the 25’ (maximum) digging depth?
R2. See Note #4 on Figure C-4. “Maximum depth of excavation shown. Actual depth will terminate one foot above the static groundwater surface encountered at the time work is completed.”
This means the actual digging depth won’t be determined until the excavation process is underway and the actual depth of the groundwater surface can be discovered. Based on historical observations from MDEQ records the average groundwater level was between 19 and 20 feet below grade level (BGL). The value of 25 feet reflects the lowest recorded groundwater level, not the average.
In addition, a depth of approximately 20 feet below grade level was used to generate the bid item quantities for Payment Items No. 3 and No. 6. This is to reflect the value of the average groundwater depth, which is most likely to be closer to the level at the time the work is completed. Modifications to the bid quantities by plus or minus 20% are allowed at the contract bid Unit Rate.
Q3. Will a slide-rail system be the only form of shoring accepted for this project?
R3. The specified slide-rail system from Efficiency Productions is a requirement for completion of the soil excavation portion of the work, as specified by the Contract Drawings and these Bid Documents. Substitutions for the slide-rail system are not allowed.
Q4. Are all concrete and asphalt removed from the job to be disposed (of) at a type II landfill? If not, can you clarify areas that do?
R4. All materials removed from the site for disposal must be disposed of at a licensed waste disposal facility.
For clarification on what to do with removed concrete and asphalt pavements See Section 02 61 00 “Earth Excavation”, Part III, Paragraph G, sub-paragraph 3:
“Other Non-Hazardous, Non-Contaminated Materials:
All miscellaneous debris, waste, and unsatisfactory materials resulting from this work shall be removed from the Site, unless otherwise specified or directed by Professional, and upon removal shall become property of the Contractor. All disposal/recycling of material shall conform to Federal, State, and local requirements. All removed materials shall be documented by manifests and disposal/recycling facility acceptance tickets, with copies given to the Professional within two (2) business days after removal from the site.”
See this same section and paragraph, sub-paragraph 2 for disposal requirements for excavated petroleum impacted soil.
Q5. Can you confirm the aggregate surface cover is to be a 2-inch layer of proposed aggregate?
R5. Yes, the aggregate surface course specified in the Contract Drawings, specifically, Figure C-6 is correct. The minimum thickness must be 2 inches.
Q6. Is it the expectation that the costs for all asbestos abatement will be included in the demolition of the building, or would this be handled under the provisionary allowance?
R6. Any costs by the bidder for asbestos abatement should be included in an appropriate payment item, such as Item No 2 – Selective Site Demolition. Since an asbestos survey was provided with the bidding documents, use of the provisionary allowance to address known information is not appropriate.
It is the intention of the Provisionary Allowance to cover unforeseen items and circumstances that may arise during execution of the work, or to cover approved (i.e. by the Professional and Owner) quantity modifications for Payment Items that exceed the plus/minus 20% variance.
Q7. There are two separate MDOT Contracts (PN 200549 and PN 118166) scheduled from May through September that will directly impact M-37 between 128th Street and State Road. Since the Mini-Mart project will require substantial truck traffic, would the DEQ allow the contractor the option to execute the Mini-Mart work in the October/November time frame?
R7. The MDEQ Project Manager (Nancy Johnson) spoke with MDOT about their project in Grant this summer, and they indicated that the project is scheduled start on June 11, 2018 and it would be best for truck traffic to complete the Grant Mini-Mart project prior to that time. They will have only 1 lane open during their construction.
The start of the project Time-to-Completion will remain the date of issuance of the Notice-To-Proceed. Based on correspondence with the DTMB, the Notice-To-Proceed is estimated to be issued in mid-April, 2018. The successful bidder is strongly encouraged to plan on starting work as soon as possible from the Notice-To- Proceed so that the work can be completed prior to June 11, 2018.
REFERENCES
None
ACKNOWLEDGEMENT
Acknowledge receipt of this Addendum No. 1 in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.
Sincerely, Superior Environmental Corp.
Corey Buckner Tracy Hutchinson, PE Project Manager Project Engineer
Bidding and Contract Document (R 8/17) Project Name: Grant Mini-Mart Demolition & Source Soil Removal File No. 761/17316.SAR
DTMB-0401D (R 8/17)
BID SUMMARY
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
3111 W. St. Joseph Street Lansing, Michigan 48917
Bids must be submitted electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
FILE NUMBER
761/17316.SAR
INDEX NUMBER
44901
DEPARTMENT/AGENCY
Michigan Department of Environmental Quality
CONTRACT TIME(S)
60 Calendar Days from Notice-To- Proceed
PROJECT NAME
Grant Mini-Mart Demolition & Source Soil Removal
LOCATION
92 S. Maple Street Grant, MI 49686
BID OPENING DATE
March 21st, 2018 at 2:00 pm Local Time (EDST)
FOR AN EXAMINATION OF THE SITE CONTACT:
Corey Buckner, Superior Environmental Corp.
Email: c.buckner@superiorenvironmental.com Ph: (616) 667-4000
SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.
BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS
IN CONSIDERATION OF THE BID PRICE (S) STATED BELOW.
FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS
□ Qualified Disabled Veteran
FEDERAL I.D. NUMBER
(protected information required for processing payments)
BIDDER'S SIGNATURE AND TITLE DATE
WITNESS' SIGNATURE DATE
By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.
BASE BID FROM BID SCHEDULE (Include specified Allowances):
____________________________________________________________________________Dollars $____________________ (use words) (in figures)
Builders Risk Insurance is NOT provided by the State of Michigan. (See Section 00700, No. 3, Paragraph 3.4.)
A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE
ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE.
BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.
Project Scope of Work:
Work includes, but is not limited to: demolition, transportation, and recycling/disposal of Mini-Mart building, canopy, asphalt parking lot, light poles, and ancillary structures. Excavation, transportation and disposal of petroleum contaminated soil. Backfill and compaction of excavation, gravel surface course, and site restoration.
The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.
Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: _______, No. ___ dated: ________ No. ___ dated: ________
FIRM NAME TELEPHONE NUMBER and E-MAIL ADDRESS
| Addendum No 1_Grant Mini Mart Site_030918 |
| Grant MiniMart_Bid Summary (rev1030918) |
| GR4746_C3R_Excavation Plan(revised) |
| Copy of Prebid Attendees Log (022618) |
File details come from the government source that posted it. Updated .