This addendum modifies the wetlands mitigation requirements for a construction contract to replace an Indian Bend Bridge. The contractor must make a one-time $65,061 payment to the Humboldt Watershed Cooperative Weed Management Area and construct approximately 100 linear feet of rail bank protection along the South Fork of the Humboldt River, 3 miles from the bridge site as delineated by the Contracting Officer's Representative. Payment will be through two lump sum items - the first for the wetlands mitigation payment, and the second for construction of the rail bank protection. The related federal contract opportunity is for the SFIR 3(1)_INDIAN BEND BRIDGE project through the Department of the Interior Bureau of Indian Affairs Western Region, with no further details provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140A1122B0003_Amd_0005.pdf | ||
| Sol_140A1122B0003_Amd_0004.pdf | ||
| Sol_140A1122B0003_Amd_0003.pdf | ||
| Sol_140A1122B0003_Amd_0002.pdf | ||
| Sol_140A1122B0003_Amd_0001.pdf | ||
| DRAWINGS_(Drawings_NV_Indian_Bench_Bridge_Full_100__(2018-03-06).pdf | ||
| Section_C_DESCRIPTION_SPECIFICATIONS.pdf | ||
| Sections_B_-_M_-_Full_And_Open.pdf | ||
| Sol_140A1122B0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SFIR 3(1) – 6/15/2020 1 Special Contract Requirements
ADDENDUM NO.1
The Contractor will NOT be required to obtain the 404 permit or develop a wetland mitigation plan as outlined in No. 18 of the general notes on sheet 5 of the plans.
However, the Contractor shall be responsible for satisfying the requirements of the wetland mitigation under REVISED section 628 of the special requirements (attached).
SFIR 3(1) – 6/15/2020 2 Special Contract Requirements
Delete Section 628 and replace with the following:
Section 628 Revised – WETLANDS MITIGATION AND CONSTRUCTION
628.01 General.
Contractor shall make a one-time payment to the Humboldt Watershed Cooperative Weed Management Area (HWCWMA) and construct approximately 100 LF of rail bank protection along the South Fork of the Humboldt River approximately 3 miles from the project bridge site. The rail bank protection limits will be staked in the field by the COR.
628.02 Basis of Bid:
Pay item 62801 considers as a basis of bid a one-time payment (contribution) to the HWCWMA in the amount of $65,061.00. Contractor shall provide the CO with documentation that this payment (contribution) was made to the HWCWMA.
The address for payment is:
Humboldt Watershed Cooperative Weed Management Area PO Box 8203 Spring Creek, NV 89815
Contact Person is Gary Reese at 775-299-2821.
Pay item 62802 considers as a basis of bid the construction of approximately 100 LF of rail bank protection located approximately 3 miles from the project site, just south of the Community of Lee.
628.03 Measurement.
Measurement for wetlands mitigation and construction of wetlands will be by the lump sum.
628.04 Payment.
No direct measurement will be made for the equipment, labor, materials, hauling of materials, excavation, disposal of material and grading required to construct the rail bank protection. This will be considered a subsidiary obligation under Item 62802.
Payment will be made under:
Pay Item Pay Unit
62801 Wetlands Mitigation LS
62802 Construction of Wetlands LS