Addendum 2 - 258 Lapp Road - Driveway Replacement.pdf
PDF 206 KB Posted
- Attached to
- CD21038 Lapp Road Driveway Replacement
- Solicitation number
- 2121610
- Issued by
- Saratoga County, New York
About this file
This document is an Addendum 2 issued by the New York State Office for People with Developmental Disabilities (OPWDD) for a Driveway Replacement project located at 258 Lapp Road in Clifton Park, NY. The addendum, dated May 23, 2025, indicates a revised project plan for the solicitation originally issued on 04/21/2025, with bids due on 06/04/2025. The project involves comprehensive driveway replacement, including removal of existing asphalt/gravel, site preparation, new subbase installation, repaving, and additional infrastructural improvements such as a 6-foot privacy fence, a 3.5-foot wooden split rail fence, and a 5-foot concrete walkway.
The procurement is a public works project with a required completion timeline of 45 days from award, estimated at a 120-day contract term. Bidders must be registered with the NYS Department of Labor and submit an Official Bid Form with detailed materials and labor cost breakdowns. The project is not designated as a Service-Disabled Veteran-Owned Set Aside and appears to be funded through OPWDD's Capital District DDSO. While no specific budget range is disclosed, contractors must provide comprehensive documentation, including insurance certificates and labor classifications, and comply with prevailing wage requirements. The solicitation allows for electronic bid submissions to Brooklyn.CMM.Bids@opwdd.ny.gov, with a mandatory site visit requirement for potential bidders.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KATHY HOCHUL
Governor
WILLOW BAER
Acting Commissioner
Developmental Disabilities Business Office
500 Balltown Road, Schenectady, NY 12304 │ TEL: 518-388-3648, FAX: 518-347-3451│www.opwdd.ny.gov
May 23, 2025
Addendum 2
Driveway Replacement 258 Lapp Road Clifton Park NY 12065
Solicitation Date: 04/21/2025 Bid Due Date: 06/04/2025 Date of update: 05/23/2025
Good afternoon, The revised plan for the mentioned project is attached.
Please make sure to include this information in your estimates.
Best Regards, Vashti Kowlessar Office Assistant 2
NYS OPWDD – Brooklyn DDSO
750 Vandalia Avenue
Brooklyn NY 11239
Tel: 718-264-3915 vashisti.d.kowlessar@opwdd.ny.gov http://www.opwdd.ny.gov/ mailto:vashisti.d.kowlessar@opwdd.ny.gov
File details come from the government source that posted it. Updated .