Addendum 1 to Ipswich Field House IFB 07.10.26.pdf

PDF 2 MB Posted

Attached to
Athletic Field House
Solicitation number
BD-26-1486-IPS09-IPS09-130941
Issued by
Essex County, Massachusetts

About this file

This is an Addendum #1 to an Invitation to Bid (IFB) issued by Ipswich Public Schools, Town of Ipswich, Massachusetts, for the construction of an athletic field house at Jack Welch Stadium. The addendum modifies the original IFB dated June 29, 2026, and incorporates clarifications and amendments regarding project timeline and design documents. The project completion date has been extended from October 30, 2026, to December 31, 2026, based on feedback from the Synthetic Turf Advisory Committee during the July 9, 2026 pre-bid meeting and site walk-through. Additionally, the project architect has made available supplemental design drawings to prospective bidders, including a drainage and grading plan (Document C101) and a utilities plan (Document C102), both dated December 12, 2018 and prepared by Gale Associates. These drawings are now included as Attachment 4 to the IFB and are available electronically as PDFs or as hard copies upon request from the schools' business office at 1 Lord Square, Ipswich, MA 01938.

The addendum specifies that the primary project design documents remain the Field House Project Plan prepared by Savoie Nolan Architects, LLC and Cummings Engineering, dated April 15, 2026, along with the two newly released site plans from Gale Associates. Hard copies of all design documents are available upon request. The addendum was authorized and signed by Thomas F. Markham, III, Director of Finance & Operations for Ipswich Public Schools, effective July 10, 2026. Contact information for Gale Associates, the firm that prepared the site plans, is provided as 163 Liberty Parkway, Weymouth, MA 02189, telephone 781-335-6465.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IPSWICH PUBLIC SCHOOLS

TOWN OF IPSWICH, MASSACHUSETTS

July 10, 2026

ADDENDUM #1 TO INVITATION TO BID (IFB)

FOR THE CONSTRUCTION OF AN ATHLETIC FIELD HOUSE AT JACK WELCH STADIUM

dated June 29, 2026

Under the provisions of IFB Section II.(g), allowing for questions, clarifications and addendums to be made to the IFB, the below points of information are being posted and are to be considered Addendum #1 to the IFB and incorporated as an official part of the full IFB, effective July 10, 2026.

Clarification and Amendment to Section I.(d): Project Timeline (page 2): During the pre-bid meeting and site walk through on July 9, 2026 a question was asked if the District would consider extending the expected project completion date to a later date. The currently stated project completion date is October 30, 2026. Members of the Synthetic Turf Advisory Committee (STAC) that were present took this matter under advisement in order to provide guidance to the Director of Finance/Procurement Officer in his making of this decision. It was felt that the best interest of the District would be served without any harm to the project if the project completion date were extended and STAC members advised the Director accordingly. The project completion date will be extended to December 31, 2026.

Amendment to Section I.(d): Project Timeline (page 2): The projection completion date is being changed with October 30, 2026 being deleted and replaced with December 31, 2026.

Clarification and Amendment to Section I.(f): Project Design Documents (page 2): During the pre-bid meeting and site walk-through on July 9, 2026 a question was asked if the District would make available other design drawings that it may have of the site to assist prospective bidders in their preparation. The project architect was present and agreed to make available any such drawings upon request. Two drawings, namely a drainage and grading plan and a utilities plan, were asked about and are being provided as a new Attachment 4 to this IFB.

Amendment to Section I.(f): Project Design Documents (page 2): The current language in its entirely under Section I.(f) is being deleted and replaced with the following: The following three drawings and site plans are included as a part of this IFB, available electronically as a PDF, and hard copy upon request of the schools’ business office. As Attachment 1 is the Field House Project Plan for detailing Scope of Service for the Proposed Field House, dated April 15, 2026 as prepared by Savoie Nolan Architects, LLC and Cummings Engineering. As Attachment 4 are two site plans: Document C101, Site Layout, Drainage and Grading Plan, and Document C102, Utility Plan, both dated December 12, 2018 as prepared by Gale Associates.

End of Addendum #1

/s/ Thomas F Markham, III Director of Finance & Operations Ipswich Public Schools

July 10, 2026

Attachment 4: Project Design Plan & Specifications

See accompanying two PDFs of the General Project Plans for the Proposed Field House at Ipswich Middle/High School, Jack Welch Memorial Stadium. Both dated December 12, 2018.

1. Document C101, Site Layout, Drainage and Grading Plan

2. Document C102, Utility Plan

A hard copy upon request to the schools’ business office located at 1 Lord Square, Ipswich, MA 01938

Prepared by: Gale Associates, Inc.

163 Liberty Parkway Weymouth, MA 02189 781-335-6465