Addendum 1 Summary with Questions and Answers.docx

DOCX document 23 KB Posted

Attached to
Booth Ranch NB Scale House Replacement
Solicitation number
S-73000-00008434
Issued by
Douglas County, Moro City, Oregon

About this file

This document is an Addendum 1 Summary with Questions and Answers for the Booth Ranch NB Scale House Replacement project, located in Douglas County, Oregon. The addendum includes revisions to the plan sheets, such as adding conduits, a junction box, and wall penetrations, as well as clarifications on items like traffic control, phone service, and power service coordination. The addendum also addresses questions from contractors regarding asbestos testing, electrical vaults, and HVAC requirements for the IT room.

The project involves the demolition and replacement of the northbound I-5 Booth Ranch Scale House, including site work, utilities, electrical service, retaining wall, paving, concrete slabs, fencing, and construction of the new building. A mandatory pre-bid meeting is required, and the contractor is responsible for coordinating the connection of the new power service. The contract documents provide details on the project's scope, such as wall reinforcement and header requirements, as well as references to specifications for certain components.

View the file

Other files

File Type Posted
ATT A Specifications~2.pdf PDF
Pre-bid Sign in Sheet-Booth Ranch-10-30-23.pdf PDF
Preliminary Results~53.xlsx XLSX spreadsheet
Agenda_Prebid_Booth Ranch NB Scale House.pdf PDF
35836 ITB.docx DOCX document
ATT B Plans REV1.pdf PDF
SP_REQ-DASOBO-00043883_TVW Janitorial Services_ODFW_Approved.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S-73000-00008434 Booth Ranch NB Scale House Replacement

ADDENDUM 1

Bidders shall acknowledge this addendum as addendum 1 on their bid submittal.

SUMMARY:

ADD: Mandatory Pre-bid meeting agenda.

ADD to Plan Sheets: The Ecoblock and header wall footing will need #4 bar at 18” on center each way

Replaced plan sheets with ATT B REV 1 Plans Revision 1 Recap of what was edited on the plans:

Added a conduit from under counter to attic.

Added a conduit from power pole to IT closet for fiber.

Added a Jbox to back of jersey barrier Added wall penetration on gable Added Note about 48 hour notice for inspecting conduit Added Note about link to bluesheets (for Hand hole and Jbox specs) Clarifications:

ODOT to provide Traffic Control. (Closed signs, barrel cones, wooden reflective barriers) Phone is completely removed and not being reinstalled.

ODOT will cover cost of PPL to remove and relocate power service. Contractor is to coordinate connecting new service.

Questions and Answers 11/3/2023 Contractor-Is there an asbestos survey done on the building?

Not a full survey, just a floor sample tested and results for that. – Bldg was built in 1987 and no other materials are suspect ACM Is an asbestos survey required for demo?

Douglas county solid waste stated they need a signed statement that the building and debris being dumped does not contain asbestos (see above) ODOT can provide.

There is really no reference to what appears to be an electrical vault on the northeast corner of the building. Is this by owner or will we get a vault number for this item?

The vaults at the NE corner of the building are called out on page C3 and are notes 4, 12 and 13. I believe the one in question that is up against the building would be note 12.

The Existing Junction boxes are labeled with a J.

No reinforcement is called out for the eco block footing or the infill wall between eco blocks behind the vault referenced above.

The Ecoblock and header wall footing will need #4 bar at 18” on center each way This is an addition to the plans (see above).

What is the wall header reinforcement?

The header wall reinforcement is shown in detail 7 on page A3.

What is the CFM for the fan motor for the data room.

The IT room fan is shown on page E1 (note 9) as 80 CFM