Addendum_1-_RFP_274-ESIFS-MSVS-2025.pdf
PDF 270 KB Posted
- Attached to
- Video Surveillance System Professional Services
- Solicitation number
- 274-ESIFS-MSVS-2025
- Issued by
- Wake County, North Carolina
About this file
This Addendum No. 1, issued December 3, 2025, by the City of Raleigh Engineering Services Department, modifies the Request for Qualifications 274-ESIFS-MSVS-2025 for Video Surveillance System Professional Services. The City seeks qualified contractors to provide Milestone Video Management System maintenance, support, and repair services across municipal facilities currently operating 63 Milestone Video Recorders (NVRs) and an expanding IP camera infrastructure utilizing Hanwha and Axis cameras. Proposals are due December 9, 2025, at 12:00 PM EST. The contract is a term agreement with no guaranteed minimum or maximum volume, though historical data indicates approximately 20 service calls annually, consisting primarily of IP camera repairs, Milestone VMS support, and new license procurement. Vendors must be prepared to provide 24/7 support capability, though the majority of work is expected during standard business hours (7:00 AM-6:00 PM). Service expectations include 2-hour response acknowledgement for emergency calls and 24-hour evaluation response for non-emergency requests, with quotes to be delivered within 48 hours of assessment.
Contractor qualifications require Milestone Authorized Partner status with Advanced Partner designation for a minimum of three years and employment of only Milestone Certified Integration Technicians (MCIT) for software and server work. Pricing must include fully burdened hourly rates for both standard and after-hours labor, with a "not-to-exceed" diagnostic visit cost to be established in advance. The City will not accept server equivalents; all servers will be provided and managed by City IT. Remote access to the Milestone Security Management System is permitted following successful completion of a City IT Security Assessment, with the vendor responsible for installing and maintaining software tools on a secure jump box configured by the City. As-Built drawings must be provided in PDF format and updated only when system modifications occur. The City will not sign non-disclosure agreements but will redact confidential information marked as such in public records requests. For potential contract extensions beyond the initial term, vendors should factor market volatility into pricing, with the City willing to consider mid-contract price adjustments only when clearly demonstrated to result from new tariffs. No site badging is typically required; technicians will generally be escorted by City personnel, though temporary badges may be required for specific assignments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 274-ESIFS-MSVS-2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
v.04/2022
City of Raleigh
Request for Qualifications #: 274- ESIFS-MSVS-2025
Title: Video Surveillance System Professional Services
Submittal Due Date and Time: Tuesday, December 9, 2025 no later than 12:00 pm EST
ADDENDUM NO. 1
Issue Date: 12-3-2025
Issuing Department: Engineering Services
Direct all inquiries concerning this RFQ to:
John Andrews Information Technology Supervisor Email: john.andrews @raleighnc.gov mailto:Kenneth.Waldroup@raleighnc.gov
City of Raleigh Addendum #1 to RFQ 274-ESIFS-MSVS-2025
Issue Date: 12-3-2025
To: All Proposers
This Addendum, containing the following additions, clarifications, and/or changes, is issued prior to receipt of qualification packages and does hereby become part of the original RFQ documents and supersedes the original RFQ documents in case of conflict.
Receipt of this addendum must be acknowledged by signing in the area indicated below. Please make the follow additions, clarifications, and/or changes to the RFQ as listed below and sign and return this addendum with your submittal package.
Question 1: For this RFP, would equivalents be acceptable for the servers that Milestone is loaded on?
Also, do you provide your own servers?
Response 1: No equivalents are acceptable for the servers running the Milestone application. All servers will be provided by City IT.
Sec 2.1.3 Financial Information Question 2 :If financial documentation is required, please advise whether your organization is able to execute a Non-Disclosure Agreement. We also request information on the processes and controls you have in place for the protection, storage, and handling of confidential information.
Response 2: The City will not be signing an NDA. Your firm may mark things such as their financial disclosures as “Confidential”. Any documents marked as such would be redacted for public records requests.
Volume Expectations Question 3: Since this is a term contract with no guaranteed minimum or maximum, is there any historical data or anticipated annual volume available to help vendors plan resource allocation and pricing?
Response 3: While this is a term contract with no guaranteed minimum or maximum volume, historical data indicates an average of approximately 20 service calls per year. The majority of these calls involve IP camera repairs, Milestone VMS support, and procurement of new licenses.
It is important to note that the IP camera infrastructure is continuously expanding, which may lead to an increase in service volume over time. Additionally, vendors should be prepared to provide support on a 24/7 basis.
This information is intended to assist vendors in planning appropriate resource allocation and pricing strategies, though actual service needs may vary.
Labor Category Utilization Question 4: To better inform our labor pricing, can you share a general expectation of how often work is performed during standard vs. after-hours or holiday/weekend timeframes?
Response 4: The majority of work is expected to occur during standard business hours. While after-hours, weekend, or holiday work is not typical, it is occasionally required in rare circumstances. Vendors should be prepared to respond during these timeframes if necessary, though such instances are infrequent.
This general expectation should assist in informing labor pricing models, particularly for differentiating standard and premium rate structures
Sec 4 - System Integration Scope – As Built Question 5: On what platform are as built required to be provided? Are drawings or risers expected after each repair? What is entailed by “responsible for maintaining and updating all relevant documentation, including system specifications, network diagrams, and As-Built drawings.”
Response 5: As-Built drawings are to be provided in PDF format. These files will be supplied to the contractor, who is responsible for importing them into their own drawing tool to make any necessary modifications.
Drawings or risers are not required after each repair. They are only expected when a repair or change results in a modification to the existing system layout—such instances are rare.
The requirement to be “responsible for maintaining and updating all relevant documentation, including system specifications, network diagrams, and As-Built drawings” entails the following:
• Updating documentation only when changes occur to the system (e.g., new equipment models, software upgrades, or infrastructure modifications).
• Providing updated specifications for new equipment or software by submitting manufacturer cut-sheets or equivalent documentation.
Sec 4 - Repair Process and quoting repairs Question 6: Please better define the repair process and the relationship to quoting, when a WO is created is a technician visit required then a quote needed to finish the repair? (per the non-emergency request section) If a visit is required before a quote, is there a not to exceed expectation for the labor spent on initial visit if the quote for repair not accepted?
Response 6: For non-emergency service requests, the repair process typically follows these steps:
1. Work Order (WO) Creation: A WO is initiated based on a service need.
2. Initial Technician Visit: A technician visit may be required to perform diagnostics and assess the scope of work.
3. Quote Development: Following the assessment, a quote is prepared. This quote will include:
• Parts and materials list
• Diagnostic labor
• Repair labor
• Programming labor
• Number of hours and labor rates for each category
If a technician visit is required prior to quoting, and the quote is not accepted, the labor associated with the initial diagnostic visit is still billable. However, a “not-to-exceed” (NTE) amount for this initial visit can be established to provide cost predictability. This NTE amount should be agreed upon in advance.
Service Expectations / SLAs – Emergency calls Question 7: What is the criteria/conditions for emergency after-hour service? The mentioned SLA 2-hour response time, is that onsite or acknowledgement?
Response 7: Emergency after-hours service is determined at the discretion of the City and is typically based on the severity and operational impact of the issue. Common criteria include:
• A critical site experiencing a failure or disruption in the Milestone VMS application, or
• A significant number of field devices (e.g., IP cameras or sensors) being damaged or rendered inoperable.
The stated 2-hour SLA refers to acknowledgement and initial engagement, not onsite arrival. Within this timeframe, the contractor is expected to acknowledge the issue and initiate a discussion with the designated City representative to determine the appropriate plan of action.
Sec 4 System Integration Scope - Remote System Access for Troubleshooting Question 8: Is the awarded vendor permitted to remotely access the Milestone Security Management System to assist with triage, diagnostics, or minor remote resolution? If so, are there any City of Raleigh-specific security protocols or approvals required to enable remote access?
Response 8: Yes, the awarded vendor will be permitted to remotely access the Milestone Security Management System to assist with triage, diagnostics, or minor remote resolution. However, remote access is contingent upon the successful completion of a City of Raleigh IT Security Assessment.
Upon approval, the vendor will collaborate with the City to configure a secure jump box through which all remote access to the Milestone VMS system will be conducted. The vendor is responsible for installing and maintaining all necessary software tools on the jump box to support Milestone VMS operations. The City will not provide or manage these tools.
Sec 4 Repair Process Parts Question 9: What products other than Milestone are deployed for the video system, namely are their standards for cameras, wire, termination, or other products used? Is there a City of Raleigh warehouse that a “contractor shall utilize City-provided parts and equipment”?
Response 9: Milestone is the sole Video Management System (VMS) deployed by the City’s Facility Technology Team. In support of this system, the City has established standards for video system components, including cameras, cabling, and terminations, as defined in City specifications.
The two primary camera manufacturers currently in use are Hanwha and Axis, in alignment with City Specifications. While the City may provide replacement cameras from existing attic stock, there will be instances where the contractor is expected to include cameras and other equipment in their quote when City-provided inventory is unavailable.
At this time, there is no centralized City warehouse that contractors are required to utilize for parts and equipment. Use of City-provided materials is contingent upon availability and will be coordinated on a case-by-case basis.
Sec 4 System Integration Scope - Site Badging Question 10: Will the vendor be required to have their technicians badged, or will they be escorted while conducting business for the City of Raleigh? We have technicians that are badged and work for the County of Wake are there shared building access between City of Raleigh and Wake Co?
Response 10: Vendors will not be required to have their technicians badged for general work conducted on behalf of the City of Raleigh. In most cases, technicians will be escorted by City personnel while on-site.
If the City determines that a badge is necessary for a specific assignment or location, the technician will be required to complete the process to obtain a temporary badge, which must be returned to the City upon completion of the work.
Regarding shared access between the City of Raleigh and Wake County: Technicians badged for Wake County will not automatically have access to City of Raleigh facilities and will still be subject to the City’s access protocols.
Reference: 274-ESIFS-MSVS-2025 – Pricing Questions-Price Adjustments During Optional Extension Years:
Question 11: If City of Raleigh elects to extend the contract beyond the initial term, will vendors have an opportunity to update pricing based on current market conditions?
Response 11: If your firm is concerned about potential market volatility, please factor it into your cost proposal for future years.
Question 12: Tariff-Driven Exceptions: Are there any special considerations for tariff-driven or supply chain-related cost increases that would allow for mid-contract price adjustments without risk of cancellation?
Response 12: The City would consider price adjustments mid-contract in the event that the awarded vendor can clearly demonstrate that the increases are a direct result of a new tariff.
John Andrews Information Technology Supervisor
Sign below and return this addendum with your submittal response.
Proposer Name & Company: ___________________________ Date: ____________
Signature: ______________________________ Title: _________________________
File details come from the government source that posted it. Updated .