Addendum 1.pdf
PDF 163 KB Posted
- Attached to
- Roseville Aquatics Complex Renovation Project
- Solicitation number
- 13-197
- Issued by
- Placer County, California
About this file
This is Addendum No. 1 to the Contract Documents for the Roseville Aquatics Complex Renovation Project issued by the City of Roseville, California Parks and Recreation Department on July 16, 2026. The project encompasses re-plastering of the competition pool and upgrades to locker rooms and restrooms for accessibility compliance, with additive alternates including mechanical pit wall repairs, HVAC improvements, sports lighting replacements, plumbing improvements, door closer replacements, and pool surge pit cover replacement. An optional pre-bid site visit is scheduled for Tuesday, July 21st from 8:00 to 9:00 AM for prospective bidders to observe existing conditions. The project operates on a lump sum, grand-total bid price structure, with bidders responsible for determining quantities. The target construction start date is approximately October 1st with completion targeted by May 1st, with 145 working days allocated for project completion. Bidders must acknowledge receipt of Addendum No. 1 in writing on page PROP-1 of the Proposal and submit responses through Public Purchase for questions.
Prospective bidders must demonstrate a minimum of three recreation projects of similar size and scope completed within the previous five years and complete the project qualifications/experience sheet; pre-qualification is not required. The project has no minimum self-performance requirement for prime contractors and contains no federal funding, prevailing wage, PLA, CWTA, MTPA requirements, or DBE/DVBE/small business participation requirements. CARB Clean Fleet Compliance certification or exemption is required prior to contract issuance but not at bid submission. Unit pricing for the Additions/Deletions sheet must be completed and submitted with the bid package. The City of Roseville Parks Design & Construction Standards, including all recent amendments, are incorporated by reference as contract documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Notice-Roseville Aquatics Complex Renovation Project.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(916) 774-5505 • (916) 773-5595 Fax • (916) 774-5220 TDD • parksandrec@roseville.ca.us • www.roseville.ca.us/parks
Addendum No. 1
DATE: July 16, 2026
TO: Prospective Bidders
FROM: Joel De Jong, Park Development Project Manager
RE: Roseville Aquatics Complex Renovation Project
Notice is hereby given that the following clarifications, corrections, additions, and/or deletions shall apply to the Contract Documents for the above referenced project. This addendum shall be made a part thereof, and subject to all requirements thereof, as if originally drawn or specified.
Receipt of Addendum No. 1 must be acknowledged in writing on page PROP-1 of the Proposal.
Item 1.1 An optional pre-bid site visit is scheduled for Tuesday, July 21st from 8:00 to 9:00 AM.
Potential bidders may drop in to observe existing conditions. Staff will not be available to answer questions during this time, and all questions raised during the walk shall be submitted in writing via Public Purchase.
Q&A:
Item 1.2 Responses to General Bid questions submitted. Technical, project-specific questions will be answered in a forthcoming addendum:
Question: We are requesting a pre-bid job walk to allow bidders the opportunity to review existing conditions before preparing their proposals. Please confirm availability for a site walkthrough.
Answer: Per Item 1.1 of this addendum, an optional site visit meeting has been scheduled.
Question: In the proposal form there is an itemized breakout requested. Please confirm the counts that we are to go off on. (I.e. how many SF, LF, etc.).
Answer: The itemized breakout referenced is an Additions / Deletions pricing sheet used for change order purposes. The bid itself is a lump sum, grand-total bid price. Bidders are responsible for determining quantities in compiling their grand total bid price.
Question: In the proposal form there is a project qualification/experience sheet. Please confirm if there is minimum experience that is required to bid on this job.
Answer: Per the included project experience form, bidders need to show a minimum of three recreation projects of similar size and scope. The timeframe is being expanded to
Parks and Recreation Park Development 311 Vernon Street Roseville, California 95678 include projects within the previous five years, per this addendum. Additional project experience may be included as needed.
Question: Is the CARB Certificate required to be submitted at the time of Bid or only by the awarded contractor after the bid as part of the contract documents?
Answer: CARB Clean Fleet Compliance certification or exemption is not due at bid time, but will be required prior to contract issuance.
Question: Does the project fall under PLA or CWTA or MTPA(MASTER TRADE
PARTNER AGREEMENT)?
Answer: No, it does not.
Question: Is pre-qualification required?
Answer: This project does not fall under Roseville’s 2026 Pre-Qualified Contractors projects. Potential bidders are required to fill out the project qualifications / experience sheet.
Question: What is the timeline for the construction project, and what is the expected completion date? Is there an estimated start date?
Answer: Target start date is approximately October 1st with completion by May 1st. Per the Supplemental Conditions, 145 Working days have been provided for this project.
Question: Please confirm whether there is a minimum self-performance requirement for the prime contractor. If so, what percentage of the work must be self-performed.
Answer: There is no minimum self-performance requirement.
Question: Is this project funded, in whole or in part, with federal funds?
Answer: There is no Federal Funding on this project.
Question: Are there any DBE, DVBE, Small Business, Microbusiness, or other subcontractor participation requirements applicable to this project? If so, please specify the required participation percentages and any associated documentation requirements.
Answer: There are no project requirements related to the business categories presented in the question.
Question: The cover sheet indicates "The latest edition of the City of Roseville Parks Construction Standards are incorporated by reference as a part of this Project Manual."
However, the following sections of these standards are not available online:
Preface/TOC, Section 03, and Section 04. Please provide a copy of these standards.
Answer: The web links to all sections of the City of Roseville Parks Design & Construction Standards have been restored on the webpage, excluding Section 3.
Section 3 represents the General Conditions for Buildings and Grounds that have already been incorporated into the project manual in its entirety.
Question: Can unit pricing be accepted by the City post-bid, by the apparent low bidder?
This will be difficult to fill on bid date, when many subcontractors hold their pricing to within minutes of submission.
Answer: Unit pricing for the Additions / Deletions sheet must be filled out and submitted with the bid package.
Question: There are many references in the "INT," "INS," and "GC" pages to the "Standard Specifications." Which set of standards is this referring to?
Answer: It appears this term is a carryover from a previous version of the Buildings and Grounds manual that is included within this project manual. For this purpose, it is in reference to the requirements found within this project manual, not a separate document.
Question: Please confirm that all "recent amendments" have been included in the 2026 Design and Construction Standards, available here:
https://www.roseville.ca.gov/development_services/engineering_land_development/const ruction_management_inspection/design_construction_standards.php#doc_center_0_pan el_0
It appears that they have, but I'd like to confirm. This is listed as a contract document on page SC-1.
Answer: Yes, all recent amendments are included in the published Design & Construction Standards.
End of Addendum No. 1