About this file
This Addendum No. 1 document, issued by Lynn Engineering on behalf of Goliad County, modifies the contract documents and plans for the Fannin and Berclair Drainage Improvements project. The project encompasses comprehensive drainage system improvements across multiple streets in the county, including removal and replacement of various pipe materials (RCP, CMP, HDPE, and PVC), asphalt and concrete repairs, ditch regrading, and installation of drainage structures such as junction boxes, grate inlets, and throat inlets. The bid date is August 10, 2026 at 2:00 PM, with the bid remaining open for 60 days after opening. Contractors must submit a signed agreement and contract security within 15 days of the owner's Notice of Award. The project is divided into two primary sections—Fannin Drainage and Berclair Drainage—each containing multiple street-specific work areas with detailed line items specifying quantities and units for each task.
The bid proposal requires contractors to provide unit prices for approximately 230 line items across the base bid and additive alternates, with all prices considered "complete and in place." Mobilization and demobilization costs, along with bonds and insurance, are calculated at 2.5% of each drainage section's subtotal. The additive alternates section includes optional work on Fannin Avenue, Blackburn Street (East), Hanley Street (East), West Ida Street, South Kendall, and Front Street. Contractors must acknowledge receipt of Addendum 1 on their bid proposal, and the document confirms that this addendum constitutes all changes made to date to the contract documents, plans, and technical specifications. The project engineer is Lynn Engineering, a Texas Registered Engineering Firm (F-324), and bids should be submitted to Goliad County Grant Administrator Katy Garcia at 127 N Courthouse Square, Goliad, Texas 77963.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2200 Ave. A, Bay City, TX 77414 Lynn Engineering
(361) 782-7121 Texas Registered Engineering Firm F-324 Lynn-engineering.com RPL Surveyor Firm 10116600
ADDENDUM NO. 1
Date: August 4, 2026
Bid Date: August 10, 2026 at 2:00 PM
Project: Fannin and Berclair Drainage Improvements
Owner: Goliad County
Engineer: Lynn Engineering
This document represents changes to be made to the Contract Documents and/or Plans and Technical Specifications for the above referenced Project. Receipt of this Addendum must be acknowledged on the Bid Proposal by contractors submitting bids for this Project.
BID DOCUMENTS:
DELETE: BID PROPOSAL
ADD: BID PROPOSAL – ADDENDUM 1
PLANS:
DELETE: PLANS ISSUED FOR BID
ADD: PLANS ISSUED FOR BID - ADDENDUM 1
The change described above constitutes all of the changes made to date to the Contract Documents, Plans and Technical Specifications and the changes shown herein shall become part of the official Contract Documents of the Project.
Sincerely, John D. Mercer john.mercer@lynngroup.com
BID PROPOSAL
20.100237 Bid Proposal – ADDENDUM 1 1 of 12
BID PROPOSAL
Goliad County –Drainage Improvements Project for Fannin and Berclair
Submitted To:
Goliad County Attn: Katy Garcia, Grant Administrator 127 N Courthouse Square Goliad, Texas 77963
The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an Agreement with the OWNER, in the form included in the Contract Documents. The Bidder also agrees to complete all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid in accordance with the Contract Documents and Technical Specifications.
BIDDER accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid Security. This bid will remain open for sixty (60) days after the day of Bid opening. BIDDER will sign the Agreement and submit the Contract Security and other documents required by the Contract Documents within fifteen days after the date of OWNER's Notice of Award.
In submitting this Bid, BIDDER represents that he has examined the Contract Documents including the Notice to Bidders and Instructions to Bidders and the following Addenda:
ADDENDA RECEIVED DATE
1.
2.
3.
(receipt of all of which is hereby acknowledged.)
BIDDER has examined the site and locality where the work is to be performed, the legal requirements (federal, state and local laws, ordinances, rules and regulations) and the conditions affecting cost, progress or performance of the work and has made such independent investigations as BIDDER deems necessary.
This bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other BIDDER to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for himself any advantage over any other Bidder or over OWNER.
20.100237 Bid Proposal – ADDENDUM 1 2 of 12
All prices are considered to be “complete and in place” prices. BIDDER will complete the Work for the following prices:
SCHEDULE OF ITEMS
ITEM BID ITEM DESCRIPTION QTY UNITS UNIT PRICE TOTAL PRICE
FANNIN DRAINAGE
MISCELLANEOUS
MOBILIZATION / DEMOBILIZATION (≤2.5%
OF SUBTOTAL FANNIN BID)
1 LS $ $
BONDS & INSURANCE (≤2.5% OF SUBTOTAL
FANNIN BID)
1 LS $ $
MISCELLANEOUS SUBTOTAL $
COTTON STREET (NORTH)
3 12” RCP REMOVAL 21 LF $ $
4 18” CMP REMOVAL 18 LF $ $
5 ASPHALT REPAIR 252 SF $ $
6 SAW CUT ASPHALT 96 LF $ $
7 GRAVEL REPAIR 69 SY $ $
8 DITCH REGRADE 536 LF $ $
9 INSTALL 12” HDPE 70 LF $ $
10 INSTALL 15” HDPE 120 LF $ $
COTTON STREET (NORTH) SUBTOTAL $
COTTON STREET (SOUTH)
11 15” CMP REMOVAL 42 LF $ $
12 15” RCP REMOVAL 21 LF $ $
13 18” CMP REMOVAL 78 LF $ $
14 18” RCP REMOVAL 173 LF $ $
15 24” RCP REMOVAL 21 LF $ $
16 30” CMP REMOVAL 20 LF $ $
17 ASPHALT REPAIR 374 SF $ $
18 SAW CUT ASPHALT 100 LF $ $
19 CONCRETE REPAIR 59 SF $ $
20 SAW CUT CONCRETE 20 LF $ $
21 GRAVEL REPAIR 108 SY $ $
22 DITCH REGRADE 2178 LF $ $
23 INSTALL 15” HDPE 65 LF $ $
20.100237 Bid Proposal – ADDENDUM 1 3 of 12
24 INSTALL 18” HDPE 260 LF $ $
25 INSTALL 24” HDPE 40 LF $ $
COTTON STREET (SOUTH) SUBTOTAL $
HUNTER STREET
26 15” CMP REMOVAL 48 LF $ $
27 15” RCP REMOVAL 28 LF $ $
28 18” CMP REMOVAL 17 LF $ $
29 18” RCP REMOVAL 98 LF $ $
30 24” CMP REMOVAL 30 LF $ $
31 ASPHALT REPAIR 445 SF $ $
32 SAW CUT ASPHALT 112 LF $ $
33 GRAVEL REPAIR 40 SY $ $
34 DITCH REGRADE 1621 LF $ $
35 INSTALL 15” HDPE 25 LF $ $
36 INSTALL 18” HDPE 115 LF $ $
37 INSTALL 24” HDPE 60 LF $ $
HUNTER STREET SUBTOTAL $
PERDIDO STREET
38 12” PVC REMOVAL 40 LF $ $
39 GRAVEL REPAIR 20 SY $ $
40 DITCH REGRADE 582 LF $ $
41 INSTALL 15” HDPE 40 LF $ $
PERDIDO STREET SUBTOTAL $
WARD STREET
42 10” DIP REMOVAL 41 LF $ $
43 12” CMP REMOVAL 25 LF $ $
44 15” CMP REMOVAL 30 LF $ $
45 18” CMP REMOVAL 125 LF $ $
46 18” HDPE REMOVAL 10 LF $ $
47 18” RCP REMOVAL 113 LF $ $
48 24” CMP REMOVAL 49 LF $ $
49 ASPHALT REPAIR 356 SF $ $
50 SAW CUT ASPHALT 96 LF $ $
51 GRAVEL REPAIR 147 SY $ $
20.100237 Bid Proposal – ADDENDUM 1 4 of 12
52 DITCH REGRADE 2772 LF $ $
53 INSTALL 15” HDPE 210 LF $ $
54 INSTALL 18” HDPE 195 LF $ $
WARD STREET SUBTOTAL $
HANLEY STREET
55 12” RCP REMOVAL 4 LF $ $
56 24” RCP REMOVAL 81 LF $ $
57 30” CMP REMOVAL 28 LF $ $
58 30” RCP REMOVAL 55 LF $ $
59 36” CMP REMOVAL 48 LF $ $
60 ASPHALT REPAIR 640 SF $ $
61 SAW CUT ASPHALT 77 LF $ $
62 DITCH REGRADE 716 LF $ $
63 INSTALL 30” RCP 190 LF $ $
64 CULVERT HEADWALL 4 EA $ $
HANLEY STREET SUBTOTAL $
BIFIELD STREET
65 12” RCP REMOVAL 20 LF $ $
66 18” CMP REMOVAL 48 LF $ $
67 18” RCP REMOVAL 59 LF $ $
68 CONCRETE REPAIR 44 SF $ $
69 SAW CUT CONCRETE 30 LF $ $
70 GRAVEL REPAIR 86 SY $ $
71 DITCH REGRADE 1701 LF $ $
72 INSTALL 15” HDPE 165 LF $ $
73 VALVE BOX ADJUSTMENT 4 EA $ $
BIFIELD STREET SUBTOTAL $
BLACKBURN STREET (WEST)
74 12” RCP REMOVAL 51 LF $ $
75 15” RCP REMOVAL 21 LF $ $
76 18” CMP REMOVAL 20 LF $ $
77 GRAVEL REPAIR 48 SY $ $
78 DITCH REGRADE 1275 LF $ $
79 INSTALL 15” HDPE 100 LF $ $
20.100237 Bid Proposal – ADDENDUM 1 5 of 12
80 VALVE BOX ADJUSTMENT 2 EA $ $
BLACKBURN STREET (WEST) SUBTOTAL $
WARD STREET (EAST)
81 GRAVEL REPAIR 8 SY $ $
82 DITCH REGRADE 379 LF $ $
83 INSTALL 15” HDPE 20 LF $ $
WARD STREET (EAST) SUBTOTAL $
FANNIN DRAINAGE TOTAL
BERCLAIR DRAINAGE
MISCELLANEOUS
MOBILIZATION / DEMOBILIZATION (≤2.5%
OF SUBTOTAL BERCLAIR BID)
1 LS $ $
BONDS & INSURANCE (≤2.5% OF SUBTOTAL
BERCLAIR BID)
1 LS $ $
MISCELLANEOUS SUBTOTAL $
OUTFALL
86 15” CMP REMOVAL 26 LF $ $
87 18” CMP REMOVAL 25 LF $ $
88 SAW CUT ASPHALT 388 LF $ $
89 ASPHALT REPAIR 4291 SF $ $
90 BRUSH CLEARING 0.11 AC $ $
91 REMOVE & REPLACE FENCE 239 LF $ $
92 REMOVE SET 2 EA $ $
93 INSTALL 12’ GATE 2 EA $ $
94 DITCH REGRADE 253 LF $ $
95 INSTALL OUTFALL STRUCTURE 1 EA $ $
96 INSTALL JUNCTION BOX #1 (7’X7’) 1 EA $ $
97 INSTALL JUNCTION BOX #2 (5’X5’) 1 EA $ $
98 INSTALL 24”X24” GRATE INLET 2 EA $ $
99 INSTALL THROAT INLET 1 EA $ $
100 INSTALL 36” RCP 535 LF $ $
OUTFALL SUBTOTAL $
TEMPLE STREET
101 12” CMP REMOVAL 20 LF $ $
102 15” CMP REMOVAL 123 LF $ $
20.100237 Bid Proposal – ADDENDUM 1 6 of 12
103 18” CMP REMOVAL 40 LF $ $
104 SAW CUT ASPHALT 401 LF $ $
105 ASPHALT REPAIR 1313 SF $ $
106 GRAVEL REPAIR 130 SY $ $
107 VALVE /WATERLINE ADJUSTMENT 4 EA $ $
108 DITCH REGRADE 3997 LF $ $
109 INSTALL THROAT INLET 1 EA $ $
110 INSTALL 12” HDPE 65 LF $ $
111 INSTALL 12” RCP 110 LF $ $
112 INSTALL 15” HDPE 225 LF $ $
113 INSTALL 15” RCP 101 LF $ $
TEMPLE STREET SUBTOTAL $
FRONT STREET
114 12” DIP REMOVAL 15 LF $ $
115 15” CMP REMOVAL 34 LF $ $
116 18” CMP REMOVAL 41 LF $ $
117 18” RCP REMOVAL 15 LF $ $
118 SAW CUT ASPHALT 549 LF $ $
119 ASPHALT REPAIR 1075 SF $ $
120 GRAVEL REPAIR 33 SY $ $
121 DITCH REGRADE 2494 LF $ $
122 INSTALL JUNCTION BOX #5 (5’X5’) 1 EA $ $
123 INSTALL 24”X24” GRATE INLET 1 EA $ $
124 INSTALL THROAT INLET 3 EA $ $
125 INSTALL 15” HDPE 79 LF $ $
126 INSTALL 18” RCP 45 LF $ $
127 INSTALL 36” RCP 454 LF $ $
FRONT STREET SUBTOTAL $
LOTT STREET
128 SAW CUT ASPHALT 23 LF $ $
129 ASPHALT REPAIR 73 SF $ $
130 DITCH REGRADE 567 LF $ $
131 INSTALL 15” RCP 20 LF $ $
LOTT STREET SUBTOTAL $
20.100237 Bid Proposal – ADDENDUM 1 7 of 12
NORTH SARATOGA STREET
132 12” DIP REMOVAL 22 LF $ $
133 12” HDPE REMOVAL 97 LF $ $
134 15” RCP REMOVAL 22 LF $ $
135 18” CMP REMOVAL 48 LF $ $
136 21” CMP REMOVAL 22 LF $ $
137 24” CMP REMOVAL 21 LF $ $
138 30” CMP REMOVAL 59 LF $ $
139 36” CMP REMOVAL 30 LF $ $
140 SAW CUT ASPHALT 249 LF $ $
141 ASPHALT REPAIR 935 SF $ $
142 GRAVEL REPAIR 34 SY $ $
143 DITCH REGRADE 1204 LF $ $
144 INSTALL 15” HDPE 148 LF $ $
145 INSTALL 18” HDPE 25 LF $ $
146 INSTALL 15” RCP 49 LF $ $
147 INSTALL 30” RCP 90 LF $ $
148 INSTALL 36” RCP 157 LF $ $
NORTH SARATOGA STREET SUBTOTAL $
NORTH WILSON STREET
149 12” DIP REMOVAL 58 LF $ $
150 12” RCP REMOVAL 16 LF $ $
151 15” RCP REMOVAL 54 LF $ $
152 18” CMP REMOVAL 32 LF $ $
153 18” RCP REMOVAL 50 LF $ $
154 24” CMP REMOVAL 52 LF $ $
155 36” CMP REMOVAL 24 LF $ $
156 SAW CUT ASPHALT 265 LF $ $
157 ASPHALT REPAIR 783 SF $ $
158 GRAVEL REPAIR 108 SY $ $
159 DITCH REGRADE 3344 LF $ $
160 INSTALL 15” HDPE 160 LF $ $
161 INSTALL 24” HDPE 20 LF $ $
162 INSTALL 15” RCP 183 LF $ $
20.100237 Bid Proposal – ADDENDUM 1 8 of 12
163 INSTALL 18” RCP 50 LF $ $
NORTH WILSON STREET SUBTOTAL $
NEWPORT STREET
164 SAW CUT ASPHALT 142 LF $ $
165 ASPHALT REPAIR 406 SF $ $
166 GRAVEL REPAIR 25 SY $ $
167 DITCH REGRADE 1614 LF $ $
168 INSTALL 15” HDPE 50 LF $ $
169 INSTALL 18” RCP 95 LF $ $
NEWPORT STREET SUBTOTAL $
NORTH KENDALL STREET
170 SAW CUT ASPHALT 89 LF $ $
171 ASPHALT REPAIR 220 SF $ $
172 GRAVEL REPAIR 42 SY $ $
173 DITCH REGRADE 1596 LF $ $
174 INSTALL 18”X18” GRATE INLET 2 EA $ $
175 INSTALL 12” HDPE 163 LF $ $
176 INSTALL 15” HDPE 45 LF $ $
177 INSTALL 15” RCP 30 LF $ $
NORTH KENDALL STREET SUBTOTAL $
NORTH/SOUTH REDDING STREET
178 12” RCP REMOVAL 49 LF $ $
179 15” RCP REMOVAL 52 LF $ $
180 SAW CUT ASPHALT 469 LF $ $
181 ASPHALT REPAIR 1275 SF $ $
182 GRAVEL REPAIR 17 SY $ $
183 DITCH REGRADE 2968 LF $ $
184 INSTALL 12” HDPE 50 LF $ $
185 INSTALL 15” HDPE 40 LF $ $
186 INSTALL 15” RCP 245 LF $ $
NORTH/SOUTH REDDING STREET SUBTOTAL $
NORTH BOWERS STREET
187 12” RCP REMOVAL 30 LF $ $
188 15” CMP REMOVAL 20 LF $ $
20.100237 Bid Proposal – ADDENDUM 1 9 of 12
189 15” RCP REMOVAL 42 LF $ $
190 18” CMP REMOVAL 60 LF $ $
191 SAW CUT ASPHALT 198 LF $ $
192 ASPHALT REPAIR 635 SF $ $
193 GRAVEL REPAIR 30 SY $ $
194 DITCH REGRADE 2236 LF $ $
195 INSTALL 15” HDPE 55 LF $ $
196 INSTALL 12” RCP 124 LF $ $
197 INSTALL 15” RCP 60 LF $ $
NORTH BOWERS STREET SUBTOTAL $
MISSION AVENUE
198 12” DIP REMOVAL 23 LF $ $
199 12” CMP REMOVAL 16 LF $ $
200 12” RCP REMOVAL 26 LF $ $
201 15” RCP REMOVAL 33 LF $ $
202 18”CMP REMOVAL 61 LF $ $
203 18” RCP REMOVAL 114 LF $ $
204 SAW CUT ASPHALT 450 LF $ $
205 ASPHALT REPAIR 1447 SF $ $
206 GRAVEL REPAIR 181 SY $ $
207 DITCH REGRADE 6866 LF $ $
208 INSTALL 18”X18” GRATE INLET 1 EA $ $
209 INSTALL 24”X24” GRATE INLET 1 EA $ $
210 INSTALL THROAT INLET 4 EA $ $
211 INSTALL 12” HDPE 105 LF $ $
212 INSTALL 15” HDPE 243 LF $ $
213 INSTALL 18” HDPE 70 LF $ $
214 INSTALL 24” HDPE 648 LF $ $
215 INSTALL 12” RCP 20 LF $ $
216 INSTALL 15” RCP 99 LF $ $
217 INSTALL 18” RCP 32 LF $ $
218 INSTALL 24” RCP 44 LF $ $
MISSION AVENUE SUBTOTAL $
PETTUS STREET
20.100237 Bid Proposal – ADDENDUM 1 10 of 12
219 15” CMP REMOVAL 30 LF $ $
220 18” RCP REMOVAL 24 LF $ $
221 24” CMP REMOVAL 29 LF $ $
222 SAW CUT ASPHALT 815 LF $ $
223 ASPHALT REPAIR 3286 SF $ $
224 GRAVEL REPAIR 144 SY $ $
225 VALVE/WATERLINE ADJUSTMENT 2 EA $ $
226 DITCH REGRADE 1743 LF $ $
227 INSTALL JUNCTION BOX #3 & #4 (5’X5’) 2 EA $ $
228 INSTALL 15” HDPE 184 LF $ $
229 INSTALL 18” HDPE 40 LF $ $
230 INSTALL 36” RCP 718 LF $ $
PETTUS STREET SUBTOTAL $
BERCLAIR DRAINAGE TOTAL $
FANNIN & BERCLAIR DRAINAGE BASE BID TOTAL $
ADDITIVE ALTERNATES - FANNIN
FANNIN AVENUE
AA1 15” CMP REMOVAL 65 LF $ $
AA2 18” CMP REMOVAL 20 LF $ $
AA3 18” RCP REMOVAL 49 LF $ $
AA4 SAW CUT ASPHALT 22 LF $ $
AA5 ASPHALT REPAIR 67 SF $ $
AA6 GRAVEL REPAIR 54 SY $ $
AA7 DITCH REGRADE 918 LF $ $
AA8 INSTALL 15” HDPE 110 LF $ $
AA9 INSTALL 18” HDPE 50 LF $ $
FANNIN AVENUE SUBTOTAL $
BLACKBURN STREET (EAST)
AA10 12” RCP REMOVAL 25 LF $ $
AA11 18” PVC REMOVAL 30 LF $ $
AA12 18” RCP REMOVAL 24 LF $ $
AA13 24” RCP REMOVAL 24 LF $ $
AA14 SAW CUT ASPHALT 79 LF $ $
AA15 ASPHALT REPAIR 255 SF $ $
20.100237 Bid Proposal – ADDENDUM 1 11 of 12
AA16 GRAVEL REPAIR 15 SY $ $
AA17 DITCH REGRADE 690 LF $ $
AA18 INSTALL 15” HDPE 105 LF $ $
BLACKBURN STREET (EAST) SUBTOTAL $
HANLEY STREET (EAST)
AA19 15” RCP REMOVAL 25 LF $ $
AA20 GRAVEL REPAIR 13 SY $ $
AA21 DITCH REGRADE 335 LF $ $
AA22 INSTALL 15” HDPE 25 LF $ $
HANLEY STREET (EAST) SUBTOTAL $
FANNIN ADDITIVE ALTERNATES TOTAL $
ADDITIVE ALTERNATES - BERCLAIR
WEST IDA STREET
AA23 10” DIP REMOVAL 16 LF $ $
AA24 12” CMP REMOVAL 10 LF $ $
AA25 SAW CUT ASPHALT 220 LF $ $
AA26 ASPHALT REPAIR 610 SF $ $
AA27 VALVE/WATERLINE ADJUSTMENT 3 EA $ $
AA28 DITCH REGRADE 881 LF $ $
AA29 INSTALL JUNCTION BOX #7 (3’X3’) 1 EA $
AA30 INSTALL 18”X18” GRATE INLET 8 EA $ $
AA31 INSTALL 12” HDPE 95 LF $ $
AA32 INSTALL 15” HDPE 281 LF $ $
AA33 INSTALL 15” RCP 160 LF $ $
WEST IDA STREET SUBTOTAL $
SOUTH KENDALL
AA34 12” CMP REMOVAL 10 LF $ $
AA35 SAW CUT ASPHALT 77 LF $ $
AA36 ASPHALT REPAIR 261 SF $ $
AA37 GRAVEL REPAIR 59 SY $ $
AA38 DITCH REGRADE 2565 LF $ $
AA39 INSTALL 12” HDPE 50 LF $ $
AA40 INSTALL 15” HDPE 81 LF $ $
AA41 INSTALL 15” RCP 45 LF $ $
20.100237 Bid Proposal – ADDENDUM 1 12 of 12
SOUTH KENDALL SUBTOTAL $
FRONT STREET
AA42 18” CMP REMOVAL 23 LF $ $
AA43 REMOVE INLET 1 EA $ $
AA44 SAW CUT ASPHALT 373 LF $ $
AA45 ASPHALT REPAIR 975 SF $ $
AA46 GRAVEL REPAIR 98 SY $ $
AA47 DITCH REGRADE 2342 LF $ $
AA48 INSTALL 18”X18” GRATE INLET 9 EA $ $
AA49 INSTALL JUNCTION BOX #6 (2’X2’) 1 EA $ $
AA50 INSTALL 12” HDPE 455 LF $ $
AA51 INSTALL 12” RCP 235 LF $ $
FRONT STREET SUBTOTAL $
BERCLAIR ADDITIVE ALTERNATES TOTAL $
The CONTRACTOR agrees to substantially complete the work in __________ calendar days.
Signature: Date:
Printed Name:
Title: (Seal if Bidder is a Corporation)
Company Name:
Company Address:
Company Phone:
Email:
Attest: Date:
Printed Name: