AB-133E-16-RQ-0581_Amendment_1_FBO.pdf
PDF 78 KB Posted
- Attached to
- NOAA/NESDIS Commercial Weather Data Pilot
- Solicitation number
- AB-133E-16-RQ-0581
About this file
Amendment 1 Q A and Revised Attachment 3
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code
2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
(x) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA
(Signature of person authorized to sign)
15C. DATE SIGNED
(Signature of Contracting Officer)
16C. DATE SIGNED
See Attachment Page.
1 5
A0001 AUG 08, 2016 NEEP1000-16-01024
NEEA0002
NOAA/NESDIS/OSAAP
1335 EAST WEST HWY
SSMC1, ROOM 5300
SILVER SPRING MD 20910
AJ630031
WESTERN ACQUISITION DIVISION
CONTRACTS BRANCH
7600 SAND POINT WAY NE, SOU6
SEATTLE WA 98115-6349
AB-133E-16-RQ-0581
JUL 28, 2016
See Schedule
Attachment Page
PAGE 2 OF 5 AB-133E-16-RQ-0581/A0001
1. Will NOAA consider extending the timeframe for delivery beyond April 2017?
a. No, data must be received by April 30, 2017. NOAA requires at least three months of RO data evaluation time following receipt of data and additional time to document results in the time frame set forth in NOAA’s March 2016 Commercial Weather Data Pilot Program Report to Congress.
2. In Section IV, Deliverables, NOAA states that it seeks three to six months of consecutive data from the time period October 2016 through April 2017. This is a seven month period, so should the quotes include pricing for seven months?
a. No, quotes shall provide pricing using Attachment 4: Price/Availability Matrix. Quoters can offer three, four, five, and/or six months of consecutive data from any period of time between October 2016 and April 2017 as long as it can be delivered no later than April 30, 2017. NOAA is not seeking seven months of data so quoters do not need to provide data for the entire time period.
3. Attachment 3: Technical Summary Matrix is missing March 2017 under “Neural atmospheric occulations per day”.
a. The matrix has been revised. Quotes shall use the revised matrix included in this amendment.
PAGE 3 OF 5 AB-133E-16-RQ-0581/A0001
Attachment 3 Technical Summary Matrix (Revised)
Quoters shall include a completed copy of this matrix in the Technical Volume. The matrix is excluded from the page count. Offerors are advised that the matrix will be used in evaluating the overall quality of data; any specifications not also included in the Statement of Need are not required, but may support a higher technical rating.
Specification Response (Yes/No/#)
(M)eets (E)xceeds
Requirements
Clarification (Details in Technical Volume
Narrative)
Ref pg.
Within the 1 October 2016 to 30 April 2017 timeframe?
Yes/No
Provide in monthly deliveries? Yes/No
Verify that this data will be available in the specified timeframe?
Yes/No
Provide the data in the format requested?
Yes/No
Meet IT security standards? Yes/No
Space-borne dual frequency open loop Radio Occultation (RO) data
Three or more months of consecutive data (providing data every day)
Yes/No
Includes open loop model Yes/No
50 Hz or 100Hz data rate #
Level-1a format (opnGns) Yes/No
Closed loop dual frequency Precise Orbital Determination (POD) tracking data
Three or more months of consecutive data (providing data every day)
Yes/No
Measurement interval <= 60 seconds
RINEX 2.x or 3.x format Yes/No Altitude Data measured onboard:
CHAMP, GRACE, or Bernese GNSS Software format quaternions?
Antenna phase center offset vectors and associated uncertainties
Spacecraft geometry/mass
PAGE 4 OF 5 AB-133E-16-RQ-0581/A0001
Solar array geometry
Receiver tracking details
Data latency (minimum, median, and maximum)
Open loop tracking data from space?
Y/N
Altitude range (in terms of minimum straight line tangent altitude) for which open loop data will be tracked
Neutral atmospheric occultations per day:
October 2016 #
November 2016 #
December 2016 #
January 2017 #
February 2017 #
March 2017 #
April 2017 #
Expected bending angle noise at high altitude (between 60 and 80 km)
Expected RO antenna signal to noise ratio between 40 and 80 km altitude in volts per volt in a one hertz band
Will your system track ionospheric occultations between orbit altitude and 60 km altitude?
Yes/No
Expected accuracy of absolute Total Electron Content (TEC) observations?
Provide ionospheric scintillation indices (S4, sigmaPhi) in the level-0 data stream that are computed on-orbit?
Yes/No
Spacecraft attitude control accuracy
Spacecraft attitude knowledge accuracy
On-board oscillator stability #
POD antenna gain in the zenith direction
PAGE 5 OF 5 AB-133E-16-RQ-0581/A0001
Number of dual frequency channels for POD tracking
RO sampling rates #
POD sampling rates #
GNSS signals tracked
Number of spacecraft providing data and from what orbits
Can you provide data from consecutive orbits?
Yes/No
Minimum number of GNSS satellites your instrument will track on two frequencies at any given time
Antenna phase center variations in ANTEX format
Alternative formats or changes to the first row or column will not be accepted.
However, offerors may add additional rows to the table to highlight additional specifications, if desired.
Offerors shall cross reference the relevant page(s) of their proposal in the last column of the table.