9. AL-1208-0209B ALS-U QA Survey.pdf
PDF 324 KB Posted
- Attached to
- SR BEAM EXTRACTIONTION & CROTCH (BE&C) CHAMBERS for ALS-U Federal contract opportunity
- Solicitation number
- AA-02052024
- Issued by
- Department of Energy
About this file
This document contains a quality assurance survey and a related federal contract opportunity for the manufacture of SR BEAM EXTRACTION & CROTCH (BE&C) Chambers for the Advanced Light Source Upgrade (ALS-U) project.
The quality assurance survey from Lawrence Berkeley National Laboratory requests information from potential suppliers about their quality management systems, processes for controlling purchased items, and process controls. It includes questions about certifications, personnel training, document control, supplier qualification, inspection procedures, and continuous improvement. Completed surveys are due by March 12, 2024, to be considered for the federal contract opportunity.
The related federal contract opportunity from the Department of Energy solicits proposals for the manufacture and delivery of SR BEAM EXTRACTION & CROTCH (BE&C) Chambers for the ALS-U project. The solicitation number is AA-02052024 and proposals are due on March 12, 2024. Specifications and drawings can be accessed at the provided Google Drive link.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1. RFP AA-02052024.pdf | ||
| 11. AL-1695-6711 SR - BE&C Chamber Compliance Matrix.xlsx | XLSX spreadsheet | |
| 12. Rep Cert Form.docx | DOCX document | |
| 4. AL-1636-0722B SR - BE&C Chamber ESD.pdf | ||
| 5. AL-1664-4914A SR - BE&C Chamber ACL.pdf | ||
| 6 . AL-1220-7841F UHV Chamber and Component Production Reuqirements.pdf | ||
| 10a. GP-Commercial Domestic.pdf | ||
| 2. Sample Subcontract AA-02052024.pdf | ||
| 7. AL-1695-6712B SR BE&C Chamber Material Provided.pdf | ||
| 10b. GP-Commercial Foreign.pdf | ||
| 3. AL-1636-0718A SR - BE&C Chamber SOW.pdf | ||
| 8. AL-1698-0916A SR - BE&C Chamber - Drawing list.pdf | ||
| 13. Price Proposal - Attachment A.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALS-U supplier quality evaluation survey
Release Date: Dec 13 2021 4:23:33 PM PST
Document Number: AL-1208-0209 Revision: B
Document Status: Released Document Type: QUALITY ASSURANCE
Category Code: AL7001
ALS-U - GENERAL
QA
O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: D ec em be r 1 3t h, D C
C A ut h
K ey
: U X
K 5I
0N
IX
P
Downloaded by: Maxime Pierre Jean Bergeret at November 09, 2022 10:55:19
AL-1208-0209 Rev. B Doc. Status: Released Page 2 of 8
Advanced Light Source Upgrade Project Lawrence Berkeley National Laboratory
Latest version of this document can be found in the LBNL Document Control Center.
A hardcopy of this document is for reference ONLY.
Table of Contents
1 Revision History
2 Abbreviations and Acronyms
3 Purpose
4 General Information
5 Quality management system
6 Control of purchased item
7 Process control
1 REVISION HISTORY
Rev. CM Number Description of Change A Initial release B Updated the calibration requirements
2 ABBREVIATIONS AND ACRONYMS
ALS Advanced Light Source ALS-U Advanced Light Source Upgrade LBNL Lawrence Berkeley National Laboratory
3 PURPOSE
In an effort to assist the ALS-U vendor evaluation process, this questionnaire was developed to learn about the quality systems of a potential fabricator or supplier. This questionnaire was designed to be utilized as an initial survey of a supplier’s quality systems. It is not necessarily a substitute for a formal on-site supplier evaluation. This questionnaire is to be completed and returned by the supplier.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: D ec em be r 1 3t h, D C
C A ut h
K ey
: U X
K 5I
0N
IX
AL-1208-0209 Rev. B Doc. Status: Released Page 3 of 8
4 GENERAL INFORMATION
Company Name
Company Address
Telephone Number
Production Manager
Quality Manager
How many additional employees perform QA/QC functions besides Quality Manager?
Is your facility capable of working more than one shift? YES NO
If yes, how many.
Please list any Quality Assurance registrations, certifications, or distinctive awards (examples: ISO 9000, Mil-Specs, Six Sigma process controls, etc.)
Does your calibration program meet the standard? (Examples: ISO/IEC 17025, (ANSI)/NCSL Z540-1-1994, ANSI/NCSL 540.3-2006, etc.) If yes, please provide the supporting materials ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: D ec em be r 1 3t h, D C
C A ut h
K ey
: U X
K 5I
0N
IX
AL-1208-0209 Rev. B Doc. Status: Released Page 4 of 8
5 QUALITY MANAGEMENT SYSTEM
Is there a written QA Plan or QA Program? YES NO
If yes, please attached it to the survey
Are QA processes, and inspection functions audited by your QA organization?
YES NO
If yes, please indicate frequency
Is personnel training provided? YES NO
Is there a process to ensure personnel are properly qualified? YES NO
Is there a procedure for document control and records management? YES NO
If yes, please describe the procedure briefly or provide examples
Are there any certifications under any other licensing or qualification program? (AWS-ASME Welder Qualifications, Nondestructive Test Society, etc.) If yes, please list them below
YES NO
Is there a system for disposition of nonconforming materials? YES NO ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: D ec em be r 1 3t h, D C
C A ut h
K ey
: U X
K 5I
0N
IX
AL-1208-0209 Rev. B Doc. Status: Released Page 5 of 8
6 CONTROL OF PURCHASED ITEM
Do you qualify suppliers and subcontractors? YES NO
If yes, please attach supporting documents
Do you visit the subcontractor’s plant facilities? YES NO
Are your suppliers’ test reports and records checked for acceptability? YES NO
Are incoming materials inspected? YES NO
If yes, please attach supporting documents
Is there a system for identification and labeling of materials? YES NO
Is defect material identified and segregated? YES NO
Is reworked material re-inspected? YES NO
Is space for storage and control of materials allocated? YES NO
Are records kept showing the acceptance, rejection, or disposal of material?
If yes, please attach supporting documents ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: D ec em be r 1 3t h, D C
C A ut h
K ey
: U X
K 5I
0N
IX
AL-1208-0209 Rev. B Doc. Status: Released Page 6 of 8
7 PROCESS CONTROL
Is there a process inspection role? YES NO
Do you have a system for reviewing new process specifications and inspection instructions?
YES NO
Do you have an in-process control and recording system for work activities (e.g. job travelers)?
YES NO
If yes, please attach supporting documents
Do you have capability for producing shop drawings, tooling design? YES NO
Are customer specifications interpreted into shop specifications and inspection instructions?
YES NO
Are drawing and specifications prepared for purchase orders and subcontractors?
YES NO
Are revisions reviewed for conformity to customer’s specifications? YES NO
If yes, please describe how and identify the person responsible for this function:
Are calibration records available for gages and instruments? YES NO
If yes, please attach supporting documents
Is there a final inspection step before delivery to the customer? YES NO
Does the organization have final inspection function separate from production function?
YES NO
Are written inspection instructions, product specifications, and/or drawings available?
Who reviews these and how often are they updated?
Do you regularly communicate with customer during fabrication? YES NO
If yes, how often do you communicate ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: D ec em be r 1 3t h, D C
C A ut h
K ey
: U X
K 5I
0N
IX
AL-1208-0209 Rev. B Doc. Status: Released Page 7 of 8
Do you consider corrective action or matters resulting from customer complaints
How do you respond to them
Is there a continuous improvement plan for QA program YES NO
If yes, please describe the main strategies
Prepared by Title Date ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: D ec em be r 1 3t h, D C
C A ut h
K ey
: U X
K 5I
0N
IX
AL-1208-0209 Rev. B Doc. Status: Released Page 8 of 8
PLEASE ATTACH ANY ADDITIONAL SUPPORTIVE DOCUMENTATION OR INFORMATION ABOUT YOUR
ORGANIZATION’S QUALITY PROGRAM
(Example: QA Plan, Listing of QC capabilities, travelers, tags, NCR format, etc.)
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: D ec em be r 1 3t h, D C
C A ut h
K ey
: U X
K 5I
0N
IX
File details come from the government source that posted it. Updated .