11. AL-1695-6711 SR - BE&C Chamber Compliance Matrix.xlsx

XLSX spreadsheet 72 KB Posted

Attached to
SR BEAM EXTRACTIONTION & CROTCH (BE&C) CHAMBERS for ALS-U Federal contract opportunity
Solicitation number
AA-02052024
Issued by
Department of Energy

About this file

This document is a specification for the manufacture and delivery of Storage Ring Beam Extraction and Crotch Chambers for the Advanced Light Source Upgrade at Lawrence Berkeley National Laboratory. The specification requires the contractor to manufacture 12 vacuum chambers in accordance with the detailed technical requirements provided. The contractor must submit documentation including CAD models, drawings, test plans and reports. Key milestones include a Final Design Review, production of a first article chamber, and delivery of all chambers by March 2024. The chambers must meet stringent cleanliness and outgassing specifications and some surfaces may be optionally coated with NEG material. The specification addresses material and fabrication standards, cleaning processes, leak testing and other quality control requirements to ensure the chambers are compatible with the ultra-high vacuum environment.

View the file

Other files for this federal contract opportunity

Other files attached to SR BEAM EXTRACTIONTION & CROTCH (BE&C) CHAMBERS for ALS-U, newest first.
File Type Posted
4. AL-1636-0722B SR - BE&C Chamber ESD.pdf PDF
5. AL-1664-4914A SR - BE&C Chamber ACL.pdf PDF
6 . AL-1220-7841F UHV Chamber and Component Production Reuqirements.pdf PDF
10a. GP-Commercial Domestic.pdf PDF
1. RFP AA-02052024.pdf PDF
9. AL-1208-0209B ALS-U QA Survey.pdf PDF
12. Rep Cert Form.docx DOCX document
2. Sample Subcontract AA-02052024.pdf PDF
7. AL-1695-6712B SR BE&C Chamber Material Provided.pdf PDF
10b. GP-Commercial Foreign.pdf PDF
3. AL-1636-0718A SR - BE&C Chamber SOW.pdf PDF
8. AL-1698-0916A SR - BE&C Chamber - Drawing list.pdf PDF
13. Price Proposal - Attachment A.xlsx XLSX spreadsheet
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Read me first Specification definition

Shall, will, may, and should are used to define every specification listed in this document. The definitions of these terms are as follows :

May – is used to indicate a desire or goal of a specification. This can also be interpreted ‘as nice to have’ and are not contractually binding.
Shall –is a specification that is contractually binding and must be implemented.
Should – is used to indicate a desire or goal of a specification. This can also be interpreted ‘as nice to have’ and are not contractually binding
Will – is used to inform intent or declaration of purpose. This is not a specification. Example, the author will use the word ‘shall’ to indicate that a specification is contractually binding and must be implemented.

Compliance matrix

Storage Ring BE&C Chamber Compliance Matrix
SourceSectionSub-SectionSub-Section (2x)Sub-Section (3x)Sub-Section (4x)DescriptionComplianceComments - Please provide a narrative if not compliant
SOW - AL-1636-07185Deliverables / Scope
5.1Deliverables
5.1.1Documentation
The Subcontractor shall provide the entire list of documentation
5.1.23-D CAD Models and Manufacturing Drawings
The Subcontractor shall provide the final 3D CAD model
The Subcontractor shall provide the final manufacturing drawing
5.1.3LBNL provided models and drawings
5.1.4Harware
5.1.4.1First Article
The Subcontractor shall manurfature the two first chamber defined by LBNL as First Article
5.1.4.2Production Article
The Subcontractor shall manurfature the entire production after approval of the first article by LBNL
5.2Scope of Work
5.2.1Management and Quality plan
The Subcontractor shall provide a quality plan within 7 days ARO
The Subcontractor shall provide an initial schedule within 7 days ARO
5.2.2Final Design Review Requirements
The subcontractor shall be responsible for supplying a final design of the SR - BE&C Chamber
The subcontractor shall adhere to SR - BE&C Chamber engineering specification (REF AL-1636-0722)
The subcontractor shall participate in the Final Design Review
The subcontractor shall include at least the following documentation: 1. Control Plan and Work Instruction for all Vacuum chamber configuration

2. Final manufacturing drawings

3. Final CAD model

4. Test plan and associated procedures

5. Bill of material

The subcontractor shall wait for a written approval and resolution of all related FDR action items prior to fabrication
5.2.3First article
The subcontractor shall produce the first article after approval of the FDR
The subcontractor shall produce the first article with the same testing and quality assurance as the production
5.2.4First article delivery
The subcontractor shall be responsible for the delivery of the first article to LBNL
5.2.5Complete production
The subcontractor shall wait the final approval of the first article for the commencement of fabrication of the production
The subcontractor shall include at least the following documentation prior shipment:
1. Complete SR - BE&C Chamber assemblies packed in an appropriate crate.

2. Completed FAT and associated reports

3. Final and completed CP

4. Final and completed ACL

5. Quality assurance receipts and certifications

6. Nonconformance or deviation documentation pertaining to each individual assembly

7. Final, approved shipping plan

8. Written authorization from LBNL to proceed with shipping

5.2.6Delivery
The subcontractor shall be responsible for the delivery of the production to LBNL
5.3Final documentation packages(s)
The subcontractor shall provide the final documentation package with at least the following:
1. A complete, as-built bill of materials identifying both fabricated and commercially available components

2. A complete, as built CAD model in an editable format

3. Complete, as built drawings in English, and in an editable format.

4. Other documentation as requested

6Management, reporting, documentation and reviews
6.1Schedule
The subcontractor shall comply with the proposed schedule
6.2Reporting requirements
The subcontractor shall provide progress report before the fifth of each month(may include drawings, manufacturing plans, test plans, QA plans, schedule updated or other documents on request in any state.
The subcontractor shall authorize LBNL representative to visit factory where the units are being built
The subcontractor shall provide other report or data on LBNL request
6.3Reviews
The subcontractor shall provide review drawings, documentation, and presentations 10 business days prior the scheduled FDR
6.4Hold points
The subcontractor shall comply with the hold points
7Fabrication
The subcontractor shall comply with the SR - BE&C Chamber Engineering Specification referenced as AL-1636-0722
9Packaging and Shipping Specification
The subcontractor shall submit to LBNL a shipping plan and be approved before the first shipment
9.1Container
The subcontractor shall use container or crates for the SR - BE&C Chamber shipment
The subcontractor shall use container or crates for the SR - BE&C Chamber storage
The subcontractor shall use a reusable crates with sides using standard attachments
The subcontractor shall submit design of crates to LBNL
The subcontractor shall wait for approval of crates design before fabrication
The subcontractor shall can ship multiple AR multipole vacuum chambers per crate
The subcontractor shall secure crate during shipment
9.2Marking
The subcontractor shall clearly identify tie-downs on crate
The subcontractor shall clearly identify lifting points on crate
The subcontractor shall clearly identify center of gravity on crate
The subcontractor shall labeled crate with all subcontract information including subcontract number, contact, and delivery information.
The subcontractor shall use self-adhesive shock indicators on crate
The subcontractor shall clearly indicate with clear and obvious labels indicating the presence of fragile contents
The subcontractor shall use originating native language and English on the crate
The subcontractor shall use up arrow to indicate the crate orientation
The subcontractor shall marked the serial number of each SR - BE&C Chamber contained therein.
9.3Packaging
The subcontractor shall not use desiccant
The subcontractor shall have all SR - BE&C Chamber free of any liquid prior to shipping
The subcontractor shall use foam to prevent movement or overstress during transportation
The subcontractor shall use moisture barrier in containers to prevent condensation during air shipment
9.4Handling and storage
In case of storage, the contractor shall have a temperature and moisture controlled storage facility
The contractor shall ensure that the temperature during storage is between 10 C and 40 C
10Quality assurance
The contractor shall comply with the entire QA request by LBNL. If not please describe in column I your discrepancies
ESD - 1636-07227NEG Coating (Optional)
The chamber shall be NEG Coated. The surfaces highlighted in green below show the minimum area who need to be NEG coated. The selected contractor shall try in a best effort to coat as much of the entire internal surface as possible. See section 10.2 for technical requirement on the NEG coating.
8Final Design
The final design shall incorporate features to alleviate the risk of trapped volume along the clamshell weld lips.
The mechanical deformation of any part of the chamber under atmospheric loads shall not exceed 0.2mm at any location on the chamber.
There shall be no features that cross within +/- 2mm of the beam plane of the chamber except the external walls.
The center axis through the BPM and crotch absorber section shall be fiducialised.
There shall be no change to the position of the ancillary vacuum ports.
The electron beam channel shall be void on any abrupt geometry change through the chamber.
The chamber is in very close proximity to magnets, therefore the overall footprint of the chamber shall be maintained unless otherwise approved by the ALS-U vacuum systems technical lead.
A process shall be developed using positioning pins to ensure the BPM button holes axis on the two halves of the main body is aligned to each other to within 50 microns before and after welding of the halves
9Environmental requirements
9.1Codes and Standards
The following standards shall apply for the fabrication and test of the SR - BE&C Chamber:

• EN ISO 13919-2 or EN ISO 10042

• EN ISO 17637

• ASTM E498.

• EN ISO 17640

• ASTM E2734/E2734 M − 10

9.2Cleanliness environment
The cleaning environment shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §7.2
9.3Cleaning fluids
The cleaning fluids shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §7.3
9.4Cutting fluids
The cutting fluids shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §7.4
9.5Fasteners
The fasteners of the SR - BE&C Chambers shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §7.6
9.6Flange and gaskets
The flanges and gaskets of the SR - BE&C Chambers shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §7.7
10Technical requirement
10.1Vacuum pressure
The maximum thermal outgassing rate shall be 1.00e-11 Torr.l.s-1.cm-2
Achievable final pressure shall be 5.00e-10 Torr
With the chamber baked and at room temperature, the Sum of all peaks higher than Mass 44 shall be lower than 1/1,000th of total pressure
Partial pressure of Mass 18 shall be less than Mass 2
Partial pressure of Mass 69 shall be less than 1/2,000th of total pressure
Partial pressure of Mass 14 shall be less than Mass 18
10.2NEG Coating (Option)
The thickness of the NEG coating shall be between 0.5 to 1.5 micron
The NEG material shall be 30%,30%,40% atomic weight. TiZrV +/-10%
The NEG film shall be deposited using PVD process using Krypton gas
The vacuum pressure achieved on the NEG coating station prior to NEG coating shall be better than 1e-8 Torr and a clean RGA scan
The NEG coated chamber shall be free of surface oxides and sufficiently cleaned prior to NEG coating to ensure adhesion
The NEG coating coverage on the internal surface of the chamber along the electron beam path channel shall be greater than 99%
The NEG coating shall be carried out at a chamber temperature of 100oC +40 oC /- 0oC
The coating recipe shall be maintained from the first article to the production chamber coatings
10.3Manufacturing process
10.3.1Material
All materials shall be new.
All material shall be free from surface cracks and fissures, forge and other tool marks, burns, delamination and other defects that would make it incompatible with a high vacuum environment.
Certification shall be in accordance with EN ISO 10204 3.1
Magnetic permeability for vacuum chamber base material shall be 1.01 and for welds or braze joints 1.04
The material shall be compatible with synchrotron radiation
10.3.2Fabrication
10.3.2.1Part fabrication
A water-soluble and non-halogenated cutting fluids shall be used for fabrication
All others requirements relative to the vacuum components fabrication shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §8.1, §8.2, §8.3
10.3.2.2Cleaning after manufacturing
UHV surfaces shall be protected as per best practices during handling operations.
Parts shall be stored in a clean area from the workshop (See §7.2).
Parts shall be suspended in tanks by wire, hooks or in baskets
All others requirements relative to the vacuum components cleaning shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §9
10.3.2.3Part joining
Step change in geometrical profile across weld shall be less than 0.2mm
All parts shall be cleaned prior to welding (See §9.4)
A WPS is not required
The weld quality shall be level D according to EN ISO 13919-2 or EN ISO 10042
All welds shall be free from cracks and fissures or other defects that would make it incompatible with a high vacuum environment.
100% of the vacuum boundary welded joints shall be visually inspected
The visual inspection shall comply with EN ISO 17637
100% of the vacuum boundary welded joints shall be leak tested.
The leak test of the welded joint shall comply with ASTM E498
The criteria and parameter expected for the He leak check shall comply with AL-1220-7841, §14
10.4Final cleaning
Once the final cleaning process has started, it shall not be stopped before the end.
After the final cleaning, all subsequent operations shall be performed in a cleanroom.
The cleaning agent used shall be identified and approved by LBNL prior to the Factory acceptance test.
All other requirements regarding the final cleaning and intermediate inspection shall comply with UHV Chamber and Component Production Requirements AL-1220 7841_Rev B, §11 and §12.
10.5Final assembly
All requirement with final assembly shall comply UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §13
10.6Final test
All test shall take place in a clean room
During pumping down of the part, all connection above the turbo pump shall be all-metal
The HPN2 port shall be all-metal
The HPN2 port shall be a VCR to CF16 adapter that is replaced with a CF16 blank as the last connection to the chamber prior to shipping
LBNL shall have right to visit the contractor during these tests
10.6.1CMM Measurement before bakeout
A CMM measurement shall be performed, on all SR - BE&C Chambers
The dimensions to be controlled shall be specified by the University technical representative.
10.6.2Bakeout
Bakeout shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §14.1
10.6.3Residual Gas Analysis
Residual Gas Analysis shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §14.2
10.6.4NEG coating Inspection
NEG coating coverage shall be inspected on the first article by insertion of a camera probe through the chamber
A short Aluminum ribbon sample shall be placed in the extension chamber in series with every coated chamber. The thickness of coating on the ribbon sample shall be reported in a least 3 locations around the circumference of the ribbon.
10.6.5Final He leak test
Final pressure measurement shall comply with AL-1220-7841, §14.4
10.6.6Final pressure measurement
Final He leak test shall comply with UHV Chamber and Component Production Requirements AL-1220-7841, §14.5
10.6.7HPN2 Back fill
HPN2 Back fill shall comply with AL-1220-7841, §14.6
10.6.8CMM Measurement after bakeout
A CMM measurement shall be performed, on all SR - BE&C Chambers
The dimensions to be controlled shall be specified by the University technical representative.
10.7Packing and shipping
Packing and shipping shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev B, §15

Parameter

Comply
Not comply
Partialy Comply