This is a bid proposal and contract document from the Commonwealth of Virginia Department of Transportation for a bridge replacement project in Scott County's Bristol District. The project involves the replacement of an existing bridge (Structure No. 6039) over the North Fork of the Clinch River on Route 624 (Fraleytown Road), extending from 0.70 miles on Route 638 to 0.90 miles on Route 604. The contract is identified as Order No. A76 with Contract ID C0000121138B52 and FHWA Number BROS-084-1(193). Electronic bids were submitted on July 22, 2026, at 10:00 AM through Bidx, with a project completion date of May 5, 2027. The scope of work includes clearing and grubbing, excavation, structural concrete work, reinforcing steel installation, pipe placement, riprap, guardrail and fence installation, erosion control measures, topsoil and seeding, and the complete dismantling and removal of the existing structure. Approximately 60 line items are included in the bid schedule, ranging from lump-sum items such as mobilization and construction surveying to unit-priced items including concrete, steel reinforcement, and various materials.
Bids are guaranteed by a bid bond equal to five percent of the bid amount, with awards to be made to the lowest responsive and responsible bidder within 60 days of bid opening. The contract is subject to prevailing wage requirements under the Davis-Bacon Act, with wage rates established for all classifications of laborers and mechanics. Fuel and steel price adjustment provisions are available at the contractor's option. The project is federally funded under the Surface Transportation Block Grant Program and requires compliance with FHWA Form 1273 provisions, including nondiscrimination, equal employment opportunity, and environmental protection requirements. Contractors must comply with provisions protecting nesting birds and bat species, and must secure portable changeable message signs with grade 3 or stronger locks and complex passwords. The contract incorporates the Virginia Department of Transportation Road and Bridge Specifications (2020) and supplements, the Virginia Work Area Protection Manual (version 11.0), and the Virginia MUTCD (version 11.0). Subcontractor and supplier information must be submitted with bids, including solicitation and utilization documentation and vendor surveys.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORDER NO.: A76
CONTRACT ID. NO.: C0000121138B52
Form C-6a
Rev. 3-22-05
CNSP (F) 1-9-06
COMMONWEALTH OF VIRGINIA
DEPARTMENT OF TRANSPORTATION
BID PROPOSAL AND CONTRACT
ROUTE NUMBER: 624
FHWA NUMBER: BROS-084-1(193)
PROJECT NUMBER: 0624-084-797,B652,C501
COUNTY: SCOTT
DISTRICT: BRISTOL
DESCRIPTION: SGR - BRIDGE REPLACMENT OVER N.F. CLINCH RIVER
FROM:
TO:
0.70 MI. ROUTE 638
0.90 MI. ROUTE 604
DATE BID SUBMITTED: 10:00 AM WEDNESDAY, JULY 22, 2026
Form C-118 Rev. 2-1-24
COMMONWEALTH OF VIRGINIA
NOTICE TO BIDDERS
As a matter of information, the bidder’s attention is directed to the points noted herein. Every point enumerated below is fully covered by proposal documents that describe them in detail. Bidders should check their proposal against all requirements, as strict compliance with all provisions is mandatory.
1. Bids shall be filed electronically through Bidx (https://bidx.com/site/home) at the times designated in the Notice of Advertisement for Bids. For information see (https://cabb.virginiadot.org/)
2. Unless otherwise specified or permitted in the proposal, prices shall be submitted on all items shown in the proposal.
3. Proposals conditioned by proposed alternates, other than those specified or permitted, or by reserving the right to accept or reject an award or to enter into a contract pursuant to an award will not be considered.
4. A bid total shall be shown in each space provided.
5. Bid bonds shall conform to Section 102.07. The bid bond number shall be placed in the appropriate space in your electronic bid. As an alternative you may complete the bottom line of the Form C-24. This form may be mailed or faxed but must be received prior to the opening of the bids.
6. Joint venture proposals shall show the Firm Name of each party and shall be signed by an authorized representative of each Firm. A letter shall be filed with the prequalification office describing responsibility of each firm and the amount of maximum capacity pledge by each firm of a joint venture.
https://bidx.com/site/home http://cabb.virginiadot.org/
Form C-24
Rev. 7-6-05
PROPOSAL GUARANTY
KNOW ALL MEN BY THESE PRESENTS, THAT WE _______________________________________ as principal, and ________________________________________ Surety, are held and firmly bound unto the
Commonwealth of Virginia as obligee, in the amount of FIVE PERCENT OF THE DOLLAR VALUE OF THE
BID, lawful money of the United States of America, for the payment of which, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally and firmly by these presents.
SIGNED, sealed and dated this Day of , 20
WHEREAS, the above said principal is herewith submitting its proposal for:
PROJECT NUMBER: 0624-084-797,B652,C501
NOW, THEREFORE, the condition of the above obligee is such, that if the aforesaid principal shall be awarded the contract upon said proposal and shall within the time specified in the Specifications after the notice of such award enter into a contract and give bond for the faithful performance of the contract, then this obligation shall be null and void; otherwise to remain in full force and effect and the principal and surety will pay unto the obligee the difference in money between the amount of the bid of the said principal and the amount for which the obligee may legally contract with another party to perform the said work if the latter amount be in excess of the former; but in no event shall the liability exceed the penal sum hereof.
(Principal*) (Surety Company)
By: By:
(Officer, Partner or Owner) (Seal) (Attorney-in-Fact**) (Seal)
(Principal*) (Address)
(Officer, Partner or Owner) (Seal) (Surety Company)
(Principal*) (Attorney-in-Fact**) (Seal)
(Officer, Partner or Owner) (Seal) (Address)
*Note: If the principal is a joint venture, each party thereof must be named and execution made by same hereon. If there is more than one surety to the bid bond, each surety must be named and execution shall be made by same hereon.
Electronic Bid Only: In lieu of completing the above section of the Contract Performance Bond, the Principal shall file an Electronic Bid Bond when bidding electronically. By signing below the Principal is ensuring the identified electronic bid bond has been executed and the Principal and Surety are firmly bound unto the Commonwealth of Virginia under the same conditions of the bid bond as shown above.
Electronic Bid Bond ID# Company/Bidder Name Signature and Title
**Attach copy of Power of Attorney
Form C-48 Rev. 10-03-25
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION,
AND VENDOR SURVEY FORM (ALL VENDORS)
PROJECT
NO.
0624-084-797,B652,C501
CONTRACT I.D.
NO.
C0000121138B52
FHWA NO. BROS-084-1(193)
DATE SUBMITTED
All vendors submitting a bid as a Prime Contractor shall complete and submit with their bids the following information as requested for (1) Subcontractor/Supplier Solicitation, and Utilization, and (2) for Vendor Survey.
The vendor certifies this form accurately represents its solicitation and utilization or non-utilization, as indicated, of the firms listed below for performance of work on this contract. The vendor also certifies he/she has had direct contact with the named firms regarding participation on this project.
Vendor Signature:
Vendor ID No. Title:
Vendor’s Address: ____________________________________
City: __________________
State: __________________ Zip Code: _________
SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION (ALL)
VENDOR
NUMBER
NAME OF SUBCONTRACTOR/SUPPLIER TELEPHONE
NUMBER
UTILIZED
(Y/N)
NOTE: ATTACH ADDITIONAL PAGES, IF NECESSARY.
BIDDER MUST SIGN EACH ADDITIONAL SHEET TO CERTIFY ITS CONTENT AND COMPLETION OF FORM.
FEDERAL LAW REQUIRES ALL VENDORS SUBMITTING BIDS OR OFFERS PROVIDE THE INFORMATION
REQUESTED IN THIS FORM.
Form C-48 Rev. 10-03-25
VENDOR SURVEY
WHEN SUBMITTING A BID OR OFFER AS A PRIME CONTRACTOR, THE BIDDER MUST SUBMIT A
VENDOR SURVEY FOR THEMSELVES AND A VENDOR SURVEY FOR EACH SUBCONTRACTOR
AND SUPPLIER WHO SUBMITTED A BID OR QUOTE TO THE BIDDER.
VENDOR’S FULL LEGAL NAME: ________________________________________
VENDOR ID NO.: __________________
ADDRESS: ____________________________________
CITY: ____________________________________
STATE: _______________ ZIP CODE: _________
VENDOR’S YEARS IN BUSINESS: _____________
VENDOR’S ANNUAL GROSS RECEIPTS: ____ $ 0 - 25 million ____ $ 25 - 50 million ____ $ 50 - 75 million ____ More than $75 million
THE UNDERSIGNED, ON BEHALF OF VENDOR IDENTIFIED ABOVE, ACKNOWLEDGES AND CERTIFIES THAT THIS FORM ACCURATELY STATES THE INFORMATION CONTAINED HEREIN TO THE BEST OF VENDOR’S
KNOWLEDGE.
Printed Full Legal Name of Person Signing for Vendor
Signature: ____________________________________________
Form C-7
Rev. 2-2-24
SHEET 1
TERMS OF THE PROPOSAL\CONTRACT
SUBMITTED: 10:00 AM WEDNESDAY, JULY 22, 2026
PROJECT NUMBER: 0624-084-797,B652,C501
ROUTE NUMBER: 624
FHWA NUMBER: BROS-084-1(193)
DESCRIPTION: SGR - BRIDGE REPLACMENT OVER N.F. CLINCH RIVER
FROM:
TO:
0.70 MI. ROUTE 638
0.90 MI. ROUTE 604
DISTRICT: BRISTOL COUNTY: SCOTT
I/we declare that no other person, firm or corporation is interested in this proposal; that I/we have carefully examined the plans, job specifications, current Road and Bridge specifications, and all other documents pertaining thereto and thoroughly understand the contents thereof; that I/we meet the prequalification requirements for bidding on this proposal;
that I/we understand that the plans and current Road and Bridge specifications, are a part of this proposal; that all of the quantities shown herewith are a part of this proposal; that all the quantities shown herewith are approximate only; that I/we have examined the location of the proposed work and source of supply of materials; and that I/we agree to bind myself/ourselves upon award by the Commonwealth under this proposal to a contract with necessary surety bond to start work according to project specifications, and to complete all work in accordance with the plans, job specifications and current Road and Bridge Specifications within the time limit set forth in the contract.
COMPLETION DATE: MAY 5, 2027
BID TOTAL $
Attached is a bond conforming to the requirements of the current Road and Bridge Specifications, it being understood that such bond is to be forfeited as liquidated damages if, upon acceptance of the terms of this proposal, I/we fail to execute the contract and furnish bond as provided in the current Road and Bridge Specifications.
(Names of Individual(S),Firm(S) Or Corporation)
Street Address City State Zip Code Vendor#/Fin#
Print Name Signature Title
In consideration of the commitments made as shown herein, the Commonwealth of Virginia by The Commonwealth Transportation Commissioner agrees to pay for all items of work performed and materials furnished at the unit price(s) and under the conditions set forth in this proposal, in witnessed by the affixing of the name below.
Contract Execution Date By
CHIEF ENGINEER
VIRGINIA DEPARTMENT OF TRANSPORTATION
Virginia Department of Transportation 05/19/2026Date Printed:
Schedule of Items Page: 2
Proposal ID: C0000121138B52 0624-084-797,B652,C501
Order No.: A76
Oversight/State Project No.:
Federal Project No.: BROS-084-1(193)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0010 301SD20-0001
CLEARING AND GRUBBING LUMP SUM _________._____LUMP SUM
0020 302SD20-0002
BEDDING MATL. AGGR. NO.
TON
614.000
ATTD
0030 302SD20-0037
24" PIPE LF
27.000
0040 302SD20-0047
30" PIPE LF
22.000
0050 302SD20-0204
24" END SECTION ES-1 OR 2 EA
2.000
0060 302SD20-0208
30" END SECTION ES-1 OR 2 EA
2.000
0070 303SD20-0001
REGULAR EXCAVATION CY
383.000
0080 303SD20-0007
BORROW EXCAVATION CY
824.000
0090 303SD20-0023
CHECK DAM ROCK TY. II EA
12.000
0100 303SD20-0028
DEWATERING BASIN EC-8 EA
2.000
0110 303SD20-0029
SILTATION CONTROL
EXCAVATION
CY
133.000
0120 303SD20-0034
TEMP. SILT FENCE TYPE A LF
760.000
0130 308SD20-0011
AGGR. BASE MATL. TY. I NO.
21A
TON
415.000
0140 315SD20-0001
ASPHALT CONCRETE TY. SM-
12.5A CONST
TON
15.000
Schedule of Items Page: 3
Proposal ID: C0000121138B52 0624-084-797,B652,C501
Order No.: A76
Oversight/State Project No.:
Federal Project No.: BROS-084-1(193)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0150 401SD20-0001
STRUCTURE EXCAVATION
CONST.
CY
796.000
0160 401SD20-0002
SELECT BACKFILL
ABUTMENT ZONE
TON
335.000
0170 401SD20-0004
GEOCOMPOSITE WALL
DRAIN
SY
78.000
0180 401SD20-0005
PIPE UNDERDRAIN 6" CONST. LF
42.000
0190 401SD20-0007
COFFERDAM EA
2.000
0200 404SD20-0005
CONC. CL. A4 MOD. LOW
SHRINK., SPR. STRUCT.
CONST.
CY
80.200
0210 404SD20-0009
BRIDGE DECK GROOVING
CONST.
SY
125.000
0220 404SD20-0010
COVER DEPTH SURVEY
CONST.
SY
125.000
0230 404SD20-0011
CONCRETE CLASS A3,
SUBSTRUCT. CONST.
CY
121.000
0240 404SX20-0001
CONCRETE CLASS A3 -
SUBFOOTER
CY
31.600
ATTD
0250 406SD20-0003
CR REINF. STEEL CL. I SPR.
STRUCT. CONST.
LB
18,980.000
0260 406SD20-0006
REINFORCING STEEL
SUBSTRUCT. CONST.
LB
6,590.000
Schedule of Items Page: 4
Proposal ID: C0000121138B52 0624-084-797,B652,C501
Order No.: A76
Oversight/State Project No.:
Federal Project No.: BROS-084-1(193)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0270 406SD20-0008
CR REINF. STEEL CL. I
SUBSTRUCT. CONST.
LB
3,790.000
0280 413SX20-0002
DISM.& REM. EX. STR.
STRUCTURE NUMBER 6039
LUMP SUM _________._____LUMP SUM
ATTD
0290 413SX20-0003
ENV.& WORKER PROTECT.
STRUCTURE NUMBER 6039
LUMP SUM _________._____LUMP SUM
ATTD
0300 413SX20-0004
MATERIAL DISPOSAL
STRUCTURE NUMBER 6039,
TYPE B
LUMP SUM _________._____LUMP SUM
ATTD
0310 414SD20-0057
DRY RIPRAP CL.II 38" TON
456.000
0320 505SD20-0074
GUARDRAIL, THRIE BEAM LF
188.000
0330 507SD20-0001
FENCE FE-W1 LF
296.000
0340 507SD20-0003
LINE BRACE UNIT FE-W1 OR
FE-W2
EA
3.000
0350 507SD20-0004
CORNER BRACE UNIT FE-W1
OR FE-W2
EA
4.000
0360 507SD20-0023
GATE FE-G 16' EA
1.000
0370 511SD20-0001
ALLAYING DUST HR
150.000
0380 512SD20-0012
TYPE 3 BARRICADE 4' EA
4.000
0390 512SD20-0013
TYPE 3 BARRICADE 8' EA
4.000
Schedule of Items Page: 5
Proposal ID: C0000121138B52 0624-084-797,B652,C501
Order No.: A76
Oversight/State Project No.:
Federal Project No.: BROS-084-1(193)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0400 512SD20-0014
TEMPORARY SIGN SF
382.000
0410 512SD20-0024
GROUP 2 CHANNELIZING
DEVICES
DAY
1,000.000
0420 512SD20-0029
WARNING LIGHT TY. B DAY
2,160.000
0430 513SD20-0001
MOBILIZATION LUMP SUM _________._____LUMP SUM
0440 517SD20-0001
CONSTRUCTION SURVEYING
CONSTR.
LUMP SUM _________._____LUMP SUM
0450 602SD20-0002
TOPSOIL CLASS A CY
30.000
0460 602SD20-0004
TOPSOIL CLASS B CY
30.000
0470 603SD20-0002
TEMPORARY SEED LB
300.000
0480 603SD20-0003
REGULAR SEED LB
300.000
0490 603SD20-0004
OVERSEEDING LB
12.000
0500 603SD20-0005
LEGUME SEED LB
1.000
0510 603SD20-0006
LEGUME OVERSEEDING LB
1.000
0520 603SD20-0009
HYDRAULIC EROSION
CONTROL PRODUCT TYPE 3
SY
10,104.000
0530 603SD20-0014
FERTILIZER NITROGEN - N LB
46.000
Schedule of Items Page: 6
Proposal ID: C0000121138B52 0624-084-797,B652,C501
Order No.: A76
Oversight/State Project No.:
Federal Project No.: BROS-084-1(193)
Contractor:
0001 REGULAR BID ITEMSSECTION:
Cat Alt Set ID: Cat Alt Mbr ID:
Bid AmountUnit Price Approximate Quantity and
UnitsDescription
Item ID Proposal
Line Number Dollars Cents Dollars Cents
Spec No.
0540 603SD20-0015
FERTILIZER PHOSPHOROUS
- P
LB
44.000
0550 603SD20-0016
FERTILIZER POTASSIUM - K LB
44.000
0560 603SD20-0017
LIME TON
4.240
0570 606SD20-0002
ROLLED EROSION CTRL
PRODUCT EC-2 TYPE 2
SY
141.000
0580 700SD20-0037
SIGN POST STP-1, 2 1/2", 12
GAUGE
LF
40.000
0590 700SD20-0038
CONC. FOUND. STP-1, TY. A EA
4.000
0600 701SD20-0001
SIGN PANEL SF
12.000
Section: 0001 _________._____Total:
Total Bid: _________._____
Page
Bid Items Eligible For Fuel Adjustment
C0000121138B52
A76
Contract ID:
Order No.:
Instructions: This form shall be completed in accordance with the Special Provision for Optional Adjustment for Fuel. If you choose to have Fuel Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.
FORM C-21B
Rev 12-21-05
0001 REGULAR BID ITEMSSECTION:
ltem Description Fuel Factor gal/unit Option Item
Number
_______BEDDING MATL. AGGR. NO. 57 0.400302SD20-0002
_______REGULAR EXCAVATION 0.290303SD20-0001
_______BORROW EXCAVATION 0.290303SD20-0007
_______SILTATION CONTROL EXCAVATION 0.290303SD20-0029
_______AGGR. BASE MATL. TY. I NO. 21A 0.600308SD20-0011
_______ASPHALT CONCRETE TY. SM-12.5A CONST 3.500315SD20-0001
_______STRUCTURE EXCAVATION CONST. 0.290401SD20-0001
_______CONC. CL. A4 MOD. LOW SHRINK., SPR. STRUCT. CONST. 1.892404SD20-0005
_______CONCRETE CLASS A3, SUBSTRUCT. CONST. 1.892404SD20-0011
Date:
Signature:
(Firm or Corporation)
(Vendor No.)
Bid Items Eligible For Steel Price Adjustment
C0000121138B52
A76
Contract ID:
Order No.:
Instructions: This form shall be completed in accordance with the Special Provision. If you choose to have Steel Price Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.
Rev 12-21-08
FORM C-21C
0001 REGULAR BID ITEMSSECTION:
ltem Description Option Item
Number
_______CR REINF. STEEL CL. I SPR. STRUCT. CONST.406SD20-0003
_______REINFORCING STEEL SUBSTRUCT. CONST.406SD20-0006
_______CR REINF. STEEL CL. I SUBSTRUCT. CONST.406SD20-0008
_______FENCE FE-W1507SD20-0001
_______SIGN POST STP-1, 2 1/2", 12 GAUGE700SD20-0037
Date:
Signature:
(Firm or Corporation)
(Vendor No.)
Bid Items Eligible For Asphalt Adjustment within this Project
C0000121138B52
A76
Contract ID:
Order No.:
0001 REGULAR BID ITEMSSECTION:
ltem Description Item
Number
ASPHALT CONCRETE TY. SM-12.5A CONST315SD20-0001
Determination of Major Items
1C0000121138B52Contract ID:
ltem Description Item
Number
CONCRETE CLASS A3, SUBSTRUCT. CONST.404SD20-0011
CONC. CL. A4 MOD. LOW SHRINK., SPR. STRUCT. CONST.404SD20-0005
COFFERDAM401SD20-0007
FORMS and SCHEDULE OF ITEMS PRECEDE SPCNs, SPs and SUPPLEMENTAL SPECS.
CN100-000026-09 GEN. PROJ. REQUIRE., SSS/SPS/SPCNS 12-11-25 (SPCN) 1
CN103-000100-01 SEC 103.02—AWARD OF CONTRACT 6-17-25 (SPCN) 1
CN105-000140-00 SEC 105.14—MAINTENANCE DURING CONSTRUCTION 12-20-24 (SPCN) 1
CN105-000150-00 SECURITY REQUIREMENTS FOR PCMS 1-30-26 (SPCN) 2
CN211-000100-00 POLISHING AGGREGATE IN ASPHALT CONC. R-7-12-16 (SPCN) 3
CN221-000100-00 SEC 221.02—DETAIL REQUIREMENTS 1-15-25 (SPCN) 4
CN245-000100-01 SEC 245.03—TESTING & DOCUMENTATION 1-10-24 (SPCN) 4
CN522-000300-00 PROTECT NESTING BIRDS DURING BRIDGE MAINT. 7-24-20 (SPCN) 5
*DRUG-FREE WORKPLACE 7-3-19 (SPCN) 5
CQ107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY 5-11-22 (SPCN) 6
LIMITATIONS OF OPERATIONS – CONFERENCE OPINION 7-8-25 (SPCN) 7
PROTECTION OF BAT SPECIES 1-17-18 (SPCN) 7
CONCRETE CLASS A3 - SUBFOOTER 4-21-26 (SPCN) 7
DISMANTLING AND REMOVING EXISTING STRUCTURE NO. 6039 4-21-26 (SPCN) 8
ENVIRONMENTAL AND WORKER PROTECTION 4-21-26 (SPCN) 8
DISPOSAL OF MATERIAL 4-21-26 (SPCN) 9
BEDDING MATERIAL AGGREGATE NO. 57 5-5-21 (SPCN) 9
SP0F0-000100-00 PREDETERMINED MIN. WAGE RATES R-7-12-16 10
SP0F0-000130-02 FHWA 1273—REQ. PROVISIONS, FED-AID 10-3-23 15
SP0F0-000150-01 AFFIRMATIVE ACTION / EEO NOTICE 7-17-17 42
SP102-000120-00 NON-DISCRIMIN. EMPLOY. & CONTRACT. PRACTICES (EO-61) 1-10-17 48
SP107-000110-00 C-45–SWPPP GEN. PERMIT–CONTRACTOR CERTIFICATION R-10-27-16 49
*SP107-000120-00 ELEC. SUBMISSION OF DBE AND PAYROLLS 1-21/20 50
SP107-001510-06 INTERIM DBE REQUIREMENTS 1-26-26 52
SP107-003100-00 MADE IN THE USA REQUIREMENTS 10-03-25 56
SP108-000100-01 PROG. SCHED. FOR CAT. I PROJECTS 3-21-22 63
*SP109-000100-05 ASPHALT MATERIAL PRICE ADJUSTMENT 7-8-24 78
SP109-000110-00 OPTIONAL ADJUSTMENT FOR FUEL R-7-12-16 80
SP109-000120-01* PRICE ADJUSTMENT FOR STEEL 7-2-19 82
SP109-000130-01 ELECTRONIC OR PRINTED WEIGH TICKETS 3-10-25 87
SP401-000100-01 CLEAR & GRUB BRIDGE APPROACHES 2-28-18 93
SP700-000180-03 MODIFICATIONS TO AASHTO’S SIGN STRUCT. SPEC. 9-29-20 95
SP801-000100-01 LANE CLOSE COORD (LCC)/LANE CLOSE IMPLEMENT (LCI) 9-20-17 100
SEC. 105.06—SUBCONTRACTING (FEDERAL FUNDED PROJECTS) 2-9-17_(SP) 102
SQ107-001300-00 PREVAILING WAGE RATES 10-12-2023 103
SS109-002020-01 SEC 109 — MEASUREMENT AND PAYMENT 5-1-23 107
SS211-002020-03 SEC 211 – ASPHALT CONCRETE 3-18-24 110
SS220-002020-01 SEC 220 – CONCRETE CURING MATERIALS 8-28-20 115
SS223-002020-02 SEC 223 – STEEL REINFORCEMENT 4-4-23 116
SS234-002020-01 SEC 234 – GLASS BEADS AND RETROREFLECTIVE OPTICS 5-6-22 117
SS235-002020-01 SEC 235 – RETROREFLECTORS 5-6-22 118
SS236-002020-01 SEC 236 – WOOD PRODUCTS 5-14-21 119
SS246-002020-02 SEC 246 – PAVEMENT MARKING 5-6-22 123
SS248-002020-02 SEC 248 – STONE MATRIX ASPHALT CONCRETE 3-18-24 131
SS305-002020-02 SEC 305 – SUBGRADE AND SHOULDERS 12-20-23 133
SS308-002020-01 SEC 308 - SUBBASE COURSE 7-13-21 135
SS309-002020-01 SEC 309 - AGGREGATE BASE COURSE 7-13-21 136
SS315-002020-05 SEC 315 – ASPHALT CONCRETE PLACEMENT 5-27-25 137
SS317-002020-01 SEC 317— STONE MATRIX ASPHALT CONCRETE PLACEMENT 6-21-24 156
SS318-002020-01 SEC 318 — PAVEMENT INTERLAYERS 8-2-23 158
TABLE OF CONTENTS FOR PROVISIONS
SS319-002020-02 SEC 319 – THIN HOT MIX ASPHALT CONCRETE OVERLAY 3-18-24 159
SS321-002020-02 SEC 321 – TRENCH WIDENING 5-4-23 163
SS407-002020-02 SEC 407 – STEEL & METAL STRUCT 11-01-22 165
SS411-002020-01 SEC 411 – PROT. COAT. OF METAL 11-01-22 167
SS512-002020-03 SEC 512 – MAINTAINING TRAFFIC 7-1-22 168
SS704-002020-02 SEC 704 – PAVEMENT MARKINGS AND MARKERS 5-6-22 181
TREE REMOVAL TIME OF YEAR RESTRICTION FOR ROOSTING BAT HABITAT 7-3-24 187
PROTECTION OF NESTING MIGRATORY BIRDS 10-9-25 188
PROTECTION OF MUSSELS 2-27-26 189
USFWS CONFERENCE OPINION 191
RP-11/NATIONWIDE PERMIT 3- MAINTENANCE 229
cn100-000026-09 December 11, 2025 (SPCN)
GENERAL PROJECT REQUIREMENTS, SUPPLEMENTAL SPECIFICATIONS (SSs), SPECIAL PROVISIONS (SPs) AND SPECIAL PROVISION COPIED NOTES (SPCNs)
This project shall be constructed according to: the Plans; the Virginia Department of Transportation Road and Bridge Specifications, dated 2020 and the Supplement thereto, dated 2022; the Virginia Department of Transportation Road and Bridge Standards, dated 2016, with revisions issued online as of the advertisement date for this project incorporated; the Virginia Work Area Protection Manual, version 11.0;
the Virginia MUTCD version 11.0; and the Supplemental Specifications, Special Provisions and Special Provision Copied Notes in this Contract. The status in the Contract of each of these documents will be according to Section 105.12 of the Specifications.
Special Provision Copied Notes in this Contract are designated with “(SPCN)” after the date.
The information at the top and left of each Special Provision Copied Note in this Contract is file reference information for Department use only. The information in the upper left corner above the title of each Supplemental Specification and Special Provision in this Contract is file reference information for Department use only.
cn103-000100-01 June 17, 2025 (SPCN)
SECTION 103.02—AWARD OF CONTRACT of the Specifications is replaced in its entirety with the following:
103.02 – Award of Contract
The Board, or the Commissioner as authorized under § 33.2-209 of the Code of Virginia, will award the Contract to the lowest responsive and responsible bidder without discrimination on the grounds of race, color, gender, national origin, status as a military family, or other basis prohibited by law. In the event of a tie bid, the tie will be decided by lot.
The award date will not be later than midnight on the 60th day after the opening of bids. If the Board, or the Commissioner where authorized by law, has not awarded the Contract within this period due to any circumstances not attributable to the bidder, the bidder may withdraw his bid without penalty or prejudice unless the time limit is extended by mutual consent.
After approval for the award of contracts, the Department will provide written notice of award to the successful bidder and will post the Ballots on the Department’s bidding webpage. The Ballot serves as public Notice of Award for a contract. The date of the Notice of Award is the “Approved” date appearing at the top of the Ballot that lists the Contract.
cn105-000140-00 December 20, 2024 (SPCN)
SECTION 105.14—MAINTENANCE DURING CONSTRUCTION of the Specifications is amended by the following:
Section 105.14(a)3 – Flagging Traffic is replaced with the following:
3. Flagging Traffic: Flaggers shall be able to communicate to the traveling public in English while performing the job duty as a flagger at the flagger station.
All flaggers shall possess a valid, current flagger certification card, be it a physical or electronic card, at all times while performing flagging duties.
Flaggers shall be certified by the VDOT Basic or Intermediate Work Zone Traffic Control Training course or by the ATSSA’s classroom Flagger Certification Program.
The following constitutes a valid flagger certification card:
• Cards issued by VDOT following completion of the Basic Work Zone course;
• Cards issued by VDOT following completion of the Intermediate Work Zone course;
• Cards issued by ATSSA following completion of a Flagger course;
• Cards issued by VDOT following completion of the Flagger-only course, provided the cards were issued on or before December 31, 2024, and have not yet reached the expiration date
(two years after date of issuance).
Flaggers who fail to possess a valid, current, flagger certification card, or refuse to allow inspection of same upon request, shall be removed from the flagging site, and operations requiring flagging shall be suspended by the Engineer. Suspended operations requiring flagging may resume once a certified flagger arrives on-site to perform flagging duties in accordance with applicable requirements. Flaggers improperly performing duties may be subject to flagger certification revocation at the sole discretion of the Engineer.
cn105-000150-00 January 30, 2026 (SPCN)
SECURITY REQUIREMENTS FOR PORTABLE CHANGEABLE MESSAGE SIGNS — The Contractor shall secure portable changeable message sign (PCMS) control cabinets with a grade 3 or stronger standard lock at all times unless maintenance is actively being conducted on the sign.
A password shall be required to change the PCMS message. The Contractor shall change the manufacturer's default password for ALL electronic signs. Electronic signs that support the use of complex passwords shall include at least 14 characters consisting of the following criteria:
• At least one special character
• At least one alphabetical character
• At least one numerical character
• A combination of upper-case and lower-case letters
Electronic signs that do not support the use of complex passwords shall be changed using the maximum number of characters and character types permitted by the manufacturer.
Password credentials are prohibited from being stored, displayed, or written on or within the sign. Any QR codes affixed to the sign shall be removed.
For all PCMS with remote or wireless accessibility, the Engineer will authorize remote access prior to this functionality being enabled. Prior to authorization, the Contractor shall update the PCMS to the most recent compatible software and firmware version available from the manufacturer. Following authorization and prior to use, the Contractor shall establish a remote connection to verify that access to the PCMS is password protected.
Electronic signs shall only post approved and documented messages. The Contractor shall log all messages posted with date and times for each public message.
The Contractor has the option for their signs to be connected to the Department’s Operations Technology (OT) network for management by Traffic Operations Center (TOC) staff. By using this method, messages are transmitted and posted by the TOC control room staff with all records and logging managed within the VDOT Advanced Traffic Management System (ATMS). Electronic message signs connected to the OT network shall follow the security requirements described below:
1. All electronic signs connected to the network shall be secured with a digital lock installed on the sign control cabinet.
2. Connected signs shall only be remotely accessible through secure communications that originated from the Department’s OT network.
3. Connected signs shall only be posted with messages from the Department’s ATMS systems or designated backup systems.
4. Community strings (both public and private strings) shall be changed from default settings.
5. All vendor cloud connections shall be removed from the connected sign. TOC system administration staff will configure VPN connections exclusively to the Department’s OT network.
6. All connected electronic signs shall adhere to the Cabinet Security Standards found in the
Department’s OT Cybersecurity Program Manual.
cn211-000100-00 July 12, 2016 (SPCN)
POLISHING AGGREGATE IN ASPHALT CONCRETE - Section 211—Asphalt Concrete of the Specifications is amended as follows:
Section 211.02—Materials is amended by replacing (e) with the following:
Fine or coarse aggregate that tend to polish under traffic will not be permitted in any final surface exposed to traffic except as permitted within the limits of Section 211.04(a) and (b) of the Specifications and as designated by the Engineer or as permitted elsewhere in these Specifications.
Section 211.04—Asphalt Concrete Mixtures is amended by replacing (a) and (b) with the following:
Asphalt concrete mixtures shall conform to Table II-14 and the following:
(a) Types SM-9.0A, SM-9.0D, SM-9.0E, SM-9.5A, SM-9.5D and SM-9.5E asphalt concrete shall consist of crushed stone, crushed slag, or crushed gravel and fine aggregate, slag or stone screenings or a combination thereof combined with asphalt cement.
NOTE: For all surface mixes, except where otherwise noted, no more than 5 percent of all aggregate retained on the No. 4 sieve and no more than 20 percent of the total aggregate may be polish susceptible. At the discretion of the Engineer, a SM-9.5AL may be specified and polish susceptible aggregates may be used (without percentage limits).
(b) Types SM-12.5A, SM-12.5D, SM-12.5E, IM-19.0A, IM-19.0D, and IM-19.0E asphalt concrete shall consist of crushed stone, crushed slag, or crushed gravel and fine aggregate, slag or stone screenings or a combination thereof combined with asphalt cement.
https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn211-000100-00.docx
NOTE: At the discretion of the Engineer, an intermediate mix may be designated as either a SM-19.0A or SM-19.0D. For SM-12.5 and SM-19.0 surface mixes, no more than 5 percent of the aggregate retained on the No. 4 sieve may be polish susceptible. All material passing the No. 4 sieve may be polish susceptible. No more than 35 percent of the total aggregate composition (polish and non-polish susceptible) shall be passing the No. 8 sieve. At the discretion of the Engineer, a SM-12.5AL may be specified and polish susceptible aggregates may be used (without percentage limits).
cn221-000100-00 January 15, 2025 (SPCN)
SECTION 221.02—DETAIL REQUIREMENTS of the Specifications is amended by replacing the first paragraph with the following:
Guardrail shall consist of rail or cable elements and fastenings fabricated to develop continuous beam or cable strength when installed. Guardrail materials shall conform to AASHTO M180-18 and M30 specification requirements supplied by manufacturers included on the Department’s Approved List 12.
cn245-000100-01 January 10, 2024 (SPCN)
SECTION 245.03—TESTING AND DOCUMENTATION of the Specifications is amended by the following:
Section 245.03(e) – Prefabricated Geocomposite Pavement Underdrain is replaced by the following:
Prefabricated Geocomposite Pavement Underdrain: Prefabricated geocomposite pavement underdrain shall consist of a polymeric drainage core allowing water inflow from both sides, encased in a nonwoven filter fabric envelope having sufficient flexibility to withstand bending and handling without damage.
Prefabricated geocomposite pavement underdrain shall conform to the following:
1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the pavement environment and shall have a thickness of not less than 3/4 inch. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.
Physical Properties Test Method Requirements
Compressive strength ASTM D1621, D2412, and
D6364
Min. 40 psi at 20% max.
deflection immediately after
24 hrs of specimen conditioning at 0 deg F and at
125 deg F
Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 0.1)
ASTM D4716 Min. 15 gal/min/ft width for
12-in specimen length
2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over both sides of the core. Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of Section 245.03(c) of the Specifications.
https://covgov.sharepoint.com/:w:/r/sites/TM-VDOT-SC-Specifications-External/_layouts/15/Doc.aspx?sourcedoc=%7BF1622882-4C64-446A-AE11-E07A4F78D1F2%7D&file=cn221-000100-00.docx&action=default&mobileredirect=true
Section 245.03(f) – Geocomposite Wall Drains is replaced by the following:
Geocomposite Wall Drains: Prefabricated geocomposite wall drain shall consist of a polymeric drainage core with a nonwoven filter fabric (single sided or double sided) having sufficient flexibility to withstand bending and handling without damage. Geocomposite wall drains shall conform to the following:
1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the roadway. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.
Physical Property Test Method Requirements
Compressive strength ASTM D1621, D2412, and D6364
Min. 40 psi at 20% max.
deflection immediately after 24 hrs of specimen conditioning at 0 degree F and at 125 degree F
Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 1.0)
ASTM D4716 Min. 15 gal/min/ft width (for 12-in specimen length)
2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over the core. Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of Section 245.03(c) of the Specifications.
Section 245.03(g) – Geomembrane Moisture Barrier is replaced by the following:
Geomembrane Moisture Barrier: Geomembrane moisture barrier shall be resistant to biological attack.
Geomembrane shall be constructed of PVC and shall conform to the requirements of ASTM D7176 for PVC 30 or higher grades. In addition, geomembrane shall comply with the requirements of ASTM D7408 for bond seam strength and peel strength.
cn522-000300-00 July 24, 2020 (SPCN)
PROTECTION OF NESTING BIRDS DURING BRIDGE MAINTENANCE — If bird nests are found on a bridge included in the Contract, the Contractor shall immediately notify the Engineer and suspend all work in the immediate vicinity of the nests until authorized to continue. The Contractor may proceed with other work activities that do not result in removal of nests or nest contents.
DRUG-FREE WORKPLACE– The Contractor shall:
• Provide a Drug-Free Workplace for the Contractor’s employees.
https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2020%20Standard%20Specifications/cn522-000300-00.docx
• Post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the Contractor’s workplace and specifying the actions that will be taken against employees for violations of such prohibition.
• State in all solicitations or advertisements for employees placed by or on behalf of the Contractor that the Contractor maintains a Drug-Free Workplace.
• Include the provisions of the foregoing clauses in every Subcontract or purchase order of over $10,000, so that the provisions will be binding upon each Subcontractor or vendor.
For the purposes of this provision, “Drug-Free Workplace” means a site for the performance of work done in connection with the Contract. The Contractors employees, and those of his Subcontractors, shall be prohibited from engaging in the unlawful manufacture, sale, distribution, dispensation, possession, or use of any controlled substance or marijuana during the performance of the Work.
7-3-19 (SPCN)
cq107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY
Section 107.14(a)1 – Required by §2.2-4201 and §2.2-4311 of the Code of Virginia is replaced with the following:
1. Required by §2.2-4201 and §2.2-4311 of the Code of Virginia: During the performance of this Contract, the Contractor agrees as follows:
a. The Contractor shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, or national origin, age, disability, or other basis prohibited by state law relating to discrimination in employment, except where religion, sex, or national origin is a bona fide occupational qualification reasonably necessary to the normal operation of the Contractor. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause, including the names of all contracting agencies with which the Contractor has contracts of over $10,000.
b. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that such contractor is an equal opportunity employer. However, notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this chapter.
c. If the Contractor employs more than five employees, the Contractor shall (i) provide annual training on the Contractor's sexual harassment policy to all supervisors and employees providing services in the Commonwealth, except such supervisors or employees that are required to complete sexual harassment training provided by the Department of Human Resource Management, and (ii) post the Contractor's sexual harassment policy in (a) a conspicuous public place in each building located in the Commonwealth that the Contractor owns or leases for business purposes and (b) the Contractor's employee handbook.
The Contractor shall include the provisions of subdivisions a, b, and c in every subcontract or purchase order of over $10,000, so that such provisions shall be binding upon each subcontractor or vendor.
Nothing contained in this chapter shall be deemed to empower any agency to require any contractor to grant preferential treatment to, or discriminate against, any individual or any group because of race, color, religion, sex, or national origin on account of an imbalance that may exist with respect to the total number or percentage of persons of any race, color, religion, sex, or national origin employed by such contractor in comparison with the total number or percentage of persons of such race, color, religion, sex, or national origin in any community or in the Commonwealth.
5-11-22 (SPCN)
LIMITATIONS OF OPERATIONS – Conference Opinion The Contractor shall be responsible for compliance with all terms, conditions, and conservation measures set forth in the U.S. Fish and Wildlife Service Conference Opinion dated June 20, 2025. This Conference Opinion was issued to the Federal Highway Administration in regards to the Route 624 (Fraleytown Road) over the North Fork of the Clinch River Bridge Replacement project, located in Scott County, Virginia (VDOT UPC: 121138, Project Code:
2023-0089533).
The Contractor shall review the Conference Opinion in its entirety and incorporate all relevant measures into its project planning, scheduling, and execution.
7-8-25 (SPCN) 121138
PROTECTION OF BAT SPECIES — If bats are observed roosting on a structure, the Contractor shall immediately notify the Engineer and suspend work in the immediate vicinity of the bats until authorized to continue.
1-17-18 (SPCN) 121138
CONCRETE CLASS A3 - Subfooter for pier and abutment subfooters will be measured in cubic yards in accordance with Section 404 of the Specifications and will be paid for at the Contract unit price per cubic yard. This price shall include all materials, labor, tools, equipment, disposal, and incidentals necessary to complete the work.
Payment will be made under:
Pay Item Pay Unit
Concrete Class A3 - Subfooter Cubic yard
4-21-26 (SPCN) 121138
DISMANTLING AND REMOVING EXISTING STRUCTURE NO. 6275 - This work shall consist of demollishing and removing existing bridge structure (Virginia Str. No. 6039) in accordance with Section 413 and 107 of the Specifications, the Bridge Plans, and the requirements herein.
The existing bridge (Virginia Str. No. 6039) pier and abutment footings will be dismantled and removed during construction. For additional information and details, refer to the Bridge Plans.
Contractor shall submit for approval a demolition plan prior to removing any portion of the existing structure.
The demolition plan shall be sealed by a Professional Engineer, licensed in the Commonwealth of Virginia.
The existing bridge shall be dismantled and removed in accordance with Sections 413 and 107 of the Specifications, and requirements listed below.
Dismantle and Remove Existing Structure includes the following:
• Remove both existing pier footings in their entirety.
• Remove both existing abutment footings in their entirety.
• Remove both guardrails in their entirety.
Dismantling and Removing Existing Structure No. 6039 will be paid for at the contract lump sum price.
This price shall be full compensation for all materials, labor, tools, equipment, disposal, and incidentals necessary to complete the work.
Dismantling and removing existing structure No. 6039 Lump Sum
ENVIRONMENTAL AND WORKER PROTECTION — This work shall consist of protecting the health and safety of the workers, the public, and the environment from all hazardous material and related dangers resulting from project activities in accordance with Section 413 of the Specifications and the Plans.
Environmental and worker protection will be paid for at the contract lump sum price per structure. This price shall include containment operations, regulation compliance, plan approval services, worker protection, and other related costs.
Environmental and Worker Protection structure No. 6039 Lump sum
DISPOSAL OF MATERIAL — This work shall consist of storing, transporting, and legally disposing of material in accordance with Section 413 of the Specifications and the Plans.
Disposal of Material will be paid for at the contract lump sum price per structure. This price shall include storing, transporting, and legal disposal of material. Material disposed of will only be paid for when request for payment is submitted with a manifest showing that the material has been legally disposed of.
Disposal of material structure No. 6039 Lump sum
BEDDING MATERIAL AGGREGATE NO. 57 shall conform to Section 203 of the Specifications and shall be placed in accordance with Section 302 of the Specifications, except as modified herein. Bedding material aggregate shall be placed at locations shown on the Plans or as directed by the Engineer.
Bedding material aggregate No. 57 will be measured in tons and will be paid for at the Contract ton price.
This price shall include furnishing, placing, and compacting.
Bedding material aggregate No. 57 Ton
5-5-21 (SPCN)
SP0F0-000100-00
Reissued July 12, 2016
PREDETERMINED MINIMUM WAGE RATES
"General Decision Number: VA20260190 05/18/2026
State: Virginia
Construction Types: Highway
Counties: Virginia Counties of Scott
Modification Number Publication Date
0 01/02/2026
1 05/18/2026
ELEC0080-011 06/01/2025
Rates Fringes
ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION.........$ 36.85 14.13
SUVA2016-075 07/02/2018
Rates Fringes
TRUCK DRIVER: SINGLE & MULTI AXLE...................$ 15.71 0.00
TRUCK DRIVER: HEAVY OVER 7 CY.....................$ 16.60 0.00
TRUCK DRIVER: FUEL AND LUBRICANT SERVICE...........$ 18.25 0.00
TRUCK DRIVER : HEAVY 7CY & UNDER....................$ 15.36 0.00
TRAFFIC CONTROL: FLAGGER..........................$ 11.65 0.00
PAVEMENT MARKING OPERATOR...........................$ 20.00 0.00
OPERATOR: BULLDOZER, INCLUDING UTILITY..............$ 15.98 0.00
OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR..........$ 16.51 0.00
OPERATOR: SCREED...................................$ 22.13 4.89
OPERATOR: ROLLER...................................$ 15.53 0.00
OPERATOR: PILEDRIVER...............................$ 21.83 4.08
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND
CONCRETE)...........................................$ 16.92 0.00
OPERATOR: MILLING MACHINE..........................$ 23.12 3.60
OPERATOR: MECHANIC.................................$ 20.60 0.00
OPERATOR: LOADER...................................$ 18.39 0.00
OPERATOR: HYDROSEEDER..............................$ 16.64 0.00
OPERATOR: GRADER/BLADE.............................$ 26.13 0.00
OPERATOR: GRADALL..................................$ 18.65 0.00
OPERATOR: DRILL....................................$ 24.66 0.00
OPERATOR: CRANE....................................$ 25.82 0.00
OPERATOR: BROOM/SWEEPER............................$ 14.32 0.25
OPERATOR: BOBCAT/SKID STEER/SKID LOADER............$ 19.16 4.45
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE...............$ 14.90 0.00
LABORER: POWER TOOL OPERATOR.......................$ 15.69 0.00
LABORER: PIPELAYER.................................$ 13.19 0.00
LABORER: GRADE CHECKER.............................$ 15.07 0.00
LABORER: COMMON OR GENERAL.........................$ 13.44 0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER,
SPREADER AND DISTRIBUTOR............................$ 15.40 0.00
IRONWORKER, STRUCTURAL..............................$ 27.38 0.00
IRONWORKER, REINFORCING.............................$ 22.71 0.00
INSTALLER - GUARDRAIL...............................$ 24.00 0.00
https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/SP0F0-000100-00.docx
CEMENT MASON/CONCRETE FINISHER......................$ 19.94 0.00
CARPENTER, INCLUDES FORM WORK.......................$ 17.65 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
�SU�…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .