A5 Attachment - CDRLs EC2000 Upgrade.docx

DOCX document 52 KB Posted

Attached to
EC2000 EQUIPMENT UPGRADE
Solicitation number
N6852023R0044
Issued by

About this file

This document contains four Contract Data Requirements Lists (CDRLs) and a Statement of Work for upgrading four existing EC2000 Eddy Current Inspection System machines at Fleet Readiness Center Southeast. The CDRLs require the delivery of operation manuals, maintenance manuals, calibration procedures, and a scan plan development manual within seven days of the final acceptance test completion. The delivery format is specified as PDF and editable MS Word files via email to the Contracting Officer's Representative and Technical Point of Contact. The related solicitation is identified as N6852023R0044 and seeks contractor support from United Western Technologies Corp. on a sole source basis to perform the EC2000 equipment upgrade for the Department of the Navy Naval Air Systems Command.

View the file

Other files

File Type Posted
EC2000 STATEMENT OF WORK (SOW).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Contract Data Requirements List (DD 1423s)

For the

Fleet Readiness Center Southeast (FRCSE)

EC2000 Automated Eddy Current System Upgrade

11 July 2022

CONTRACT DATA REQUIREMENTS LIST

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP
TM
X
OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

EC2000 Eddy Current Inspection System

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A001
Technical Report
Operation Manual
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MISC-80508B
SOW Technical Data, Operation Manual
MIPPE – Process Engineering
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A
N/A
7 Days After Final Acceptance Test Completion

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
See Block 16

Block 4: Electronic format requested. Contract Format Acceptable.

Block 8: A draft is NOT required. Government will have 30-days to review and provide comments.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the Contracting Officers Representative (COR) and Technical Point of Contact (TPOC). If electronic mail is not available, the contractor shall ensure the delivery of a hard copy to the TPOC via overnight mail.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
David Schuster
6 May 2020
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
1
of
2
Pages

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP
TM
X
OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

EC2000 Eddy Current Inspection System

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A002
Technical Report
Maintenance Manual
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MISC-80508B
SOW Technical Data, Maintenance Manual
F&PM
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A
N/A
7 Days After Final Acceptance Test Completion

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
See Block 16

Block 4: Electronic format requested. Contract Format Acceptable.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the Contracting Officers Representative (COR) and Technical Point of Contact (TPOC). If electronic mail is not available, the contractor shall ensure the delivery of a hard copy to the TPOC via overnight mail.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
David Schuster
6 May 2020
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
1
of
2
Pages

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP
TM
X
OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

EC2000 Eddy Current Inspection System

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A003
Technical Report
Calibration Procedure
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MISC-80508B
SOW Technical Data, Calibration Procedures
Metrology Engineering
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A
N/A
7 Days After Final Final Acceptance Test Completion

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
See Block 16

Block 4: Electronic format requested. Contract Format Acceptable.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the Contracting Officers Representative (COR) and Technical Point of Contact (TPOC). If electronic mail is not available, the contractor shall ensure the delivery of a hard copy to the TPOC via overnight mail.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
David Schuster
6 May 2020
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
1
of
2
Pages

Form Approved

(1 Data Item)

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP
TM
X
OTHER

X

D. SYSTEM|ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

EC2000 Eddy Current Inspection System

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A004
Technical Report
Scan Plan Development Manual
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MISC-80508B
SOW Technical Data, Scan Plan Development Manual
Materials Lab
7. DD 250 REQ
9. DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
A
N/A
7 Days After Final Acceptance Test Completion

b. COPIES

8. APP CODE

11. ASN/A OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE
DRAFT
FINAL

N/A

N/A
N/A
Reg
Repro
16. REMARKS
See Block 16

Block 4: Electronic format requested. Contract Format Acceptable.

Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the Contracting Officers Representative (COR) and Technical Point of Contact (TPOC). If electronic mail is not available, the contractor shall ensure the delivery of a hard copy to the TPOC via overnight mail.

15. Total

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
David Schuster
6 May 2020
DD FORM 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page
1
of
2
Pages

DISTRIBUTION STATEMENT ON TECHNICAL DOCUMENTS

The purpose of this supplement attachment is to establish procedures for marking technical documents, including production, engineering and logistics information, to denote the extent to which they are available for distribution, release, and dissemination without additional approvals or authorizations.

Distribution covers all engineering drawings, standards, specifications, technical manuals, blueprints, drawings, plans, instructions, computer software and documentation, and other technical information that can be used or be adapted for use to design, engineer, produce, manufacture, operate, repair, overhaul, or reproduce any military or space equipment or technology concerning such equipment.

The distribution statement markings shall be mandatory for all technical documents, including such informal documents as working papers, memoranda, and preliminary reports if those documents are not already in the public domain and if they are likely to be disseminated outside of the Department of Defense.

The distribution statement shall be displayed conspicuously on technical documents so as to be recognized readily by recipients.

The following shall apply for standard written or printed material:

1. The distribution statement shall appear on each front cover, title page, and DD Form 298 “Report Documentation Page”.

2. When practicable, the abstract of the document, the DD Form 1423 and bibliographic citations shall be written in such a way that the information will not be subject to distribution statement B.

If the technical information is not prepared in the form of an ordinary document and does not have a cover or title page (such as forms and charts), the applicable distribution statement shall be stamped, printed, written, or affixed by other means in a conspicuous position.

A distribution statement marking is distinct from and in addition to a security classification marking.

DISTRIBUTION STATEMENT DEFINITIONS:

1. DISTRIBUTION STATEMENT A. Approved for public release, distribution is unlimited.

2. DISTRIBUTION STATEMENT B Distribution authorized to Department of Defense (DoD) and U.S. DoD contractors only. Other requests for this document shall be referred to FRCSE Counsel via Process Engineer and the Contracting Office.

File details come from the government source that posted it. Updated .