A5 Attachment - CDRLs EC2000 Upgrade.docx
DOCX document 52 KB Posted
- Attached to
- EC2000 EQUIPMENT UPGRADE
- Solicitation number
- N6852023R0044
About this file
This document contains four Contract Data Requirements Lists (CDRLs) and a Statement of Work for upgrading four existing EC2000 Eddy Current Inspection System machines at Fleet Readiness Center Southeast. The CDRLs require the delivery of operation manuals, maintenance manuals, calibration procedures, and a scan plan development manual within seven days of the final acceptance test completion. The delivery format is specified as PDF and editable MS Word files via email to the Contracting Officer's Representative and Technical Point of Contact. The related solicitation is identified as N6852023R0044 and seeks contractor support from United Western Technologies Corp. on a sole source basis to perform the EC2000 equipment upgrade for the Department of the Navy Naval Air Systems Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EC2000 STATEMENT OF WORK (SOW).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Contract Data Requirements List (DD 1423s)
For the
Fleet Readiness Center Southeast (FRCSE)
EC2000 Automated Eddy Current System Upgrade
11 July 2022
CONTRACT DATA REQUIREMENTS LIST
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
| TM |
| X |
| OTHER |
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
EC2000 Eddy Current Inspection System
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A001 |
| Technical Report |
| Operation Manual |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80508B |
| SOW Technical Data, Operation Manual |
| MIPPE – Process Engineering |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| N/A |
| 7 Days After Final Acceptance Test Completion |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| See Block 16 |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 8: A draft is NOT required. Government will have 30-days to review and provide comments.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the Contracting Officers Representative (COR) and Technical Point of Contact (TPOC). If electronic mail is not available, the contractor shall ensure the delivery of a hard copy to the TPOC via overnight mail.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| David Schuster |
| 6 May 2020 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 2 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
| TM |
| X |
| OTHER |
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
EC2000 Eddy Current Inspection System
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A002 |
| Technical Report |
| Maintenance Manual |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80508B |
| SOW Technical Data, Maintenance Manual |
| F&PM |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| N/A |
| 7 Days After Final Acceptance Test Completion |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| See Block 16 |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the Contracting Officers Representative (COR) and Technical Point of Contact (TPOC). If electronic mail is not available, the contractor shall ensure the delivery of a hard copy to the TPOC via overnight mail.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| David Schuster |
| 6 May 2020 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 2 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
| TM |
| X |
| OTHER |
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
EC2000 Eddy Current Inspection System
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A003 |
| Technical Report |
| Calibration Procedure |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80508B |
| SOW Technical Data, Calibration Procedures |
| Metrology Engineering |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| N/A |
| 7 Days After Final Final Acceptance Test Completion |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| See Block 16 |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the Contracting Officers Representative (COR) and Technical Point of Contact (TPOC). If electronic mail is not available, the contractor shall ensure the delivery of a hard copy to the TPOC via overnight mail.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| David Schuster |
| 6 May 2020 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 2 |
| Pages |
Form Approved
(1 Data Item)
OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract|PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP |
| TM |
| X |
| OTHER |
X
| D. SYSTEM|ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
EC2000 Eddy Current Inspection System
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A004 |
| Technical Report |
| Scan Plan Development Manual |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80508B |
| SOW Technical Data, Scan Plan Development Manual |
| Materials Lab |
| 7. DD 250 REQ |
| 9. DIST STATEMENT REQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| A |
| N/A |
| 7 Days After Final Acceptance Test Completion |
b. COPIES
8. APP CODE
| 11. ASN/A OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
| a. ADDRESSEE |
| DRAFT |
| FINAL |
N/A
| N/A |
| N/A |
| Reg |
| Repro |
| 16. REMARKS |
| See Block 16 |
Block 4: Electronic format requested. Contract Format Acceptable.
Block 14: Deliveries shall be provided in PDF and a MS Word editable file format and delivered by electronic email to the Contracting Officers Representative (COR) and Technical Point of Contact (TPOC). If electronic mail is not available, the contractor shall ensure the delivery of a hard copy to the TPOC via overnight mail.
15. Total
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| David Schuster |
| 6 May 2020 |
| DD FORM 1423-1, JUN 90 (EG) |
| Previous editions are obsolete |
| Page |
| 1 |
| of |
| 2 |
| Pages |
DISTRIBUTION STATEMENT ON TECHNICAL DOCUMENTS
The purpose of this supplement attachment is to establish procedures for marking technical documents, including production, engineering and logistics information, to denote the extent to which they are available for distribution, release, and dissemination without additional approvals or authorizations.
Distribution covers all engineering drawings, standards, specifications, technical manuals, blueprints, drawings, plans, instructions, computer software and documentation, and other technical information that can be used or be adapted for use to design, engineer, produce, manufacture, operate, repair, overhaul, or reproduce any military or space equipment or technology concerning such equipment.
The distribution statement markings shall be mandatory for all technical documents, including such informal documents as working papers, memoranda, and preliminary reports if those documents are not already in the public domain and if they are likely to be disseminated outside of the Department of Defense.
The distribution statement shall be displayed conspicuously on technical documents so as to be recognized readily by recipients.
The following shall apply for standard written or printed material:
1. The distribution statement shall appear on each front cover, title page, and DD Form 298 “Report Documentation Page”.
2. When practicable, the abstract of the document, the DD Form 1423 and bibliographic citations shall be written in such a way that the information will not be subject to distribution statement B.
If the technical information is not prepared in the form of an ordinary document and does not have a cover or title page (such as forms and charts), the applicable distribution statement shall be stamped, printed, written, or affixed by other means in a conspicuous position.
A distribution statement marking is distinct from and in addition to a security classification marking.
DISTRIBUTION STATEMENT DEFINITIONS:
1. DISTRIBUTION STATEMENT A. Approved for public release, distribution is unlimited.
2. DISTRIBUTION STATEMENT B Distribution authorized to Department of Defense (DoD) and U.S. DoD contractors only. Other requests for this document shall be referred to FRCSE Counsel via Process Engineer and the Contracting Office.
File details come from the government source that posted it. Updated .