STATEMENT OF WORK

FOR

CAPE LOOKOUT NATIONAL SEASHORE

HARKERS ISLAND, NC

Project Title

LSS Boat House and Cape Water Building Roof Replacements

Prepared by

Cape Lookout National Seashore

Steve Sabol

PMIS: 294711

1.0 – BACKGROUND

The Boat house and water building require total roof replacement. The structures are combined into one scope based on the remote location of this area. This project will complete total roof replacement on each structure.

2.0 – SCOPE

-Replace roof on Water Building with standing seam metal roof.

-Replace roof on Boat House with cedar shakes.

3.0 - OBJECTIVES - GENERAL REQUIREMENTS

Contractor shall repair/replace:

A. Water Building, 1400 Sq/ft:

-remove shingles, rake boards, and fascia.

-scrape surface clean of all debris, shingles, paper, nails, and staples.

-inspect sheathing and replace as necessary, up to 10%.

-prepare sheathing and structure for standing seam metal roof.

-install a thermal underlayment/weather membrane on entire surface.

-install metal roof.

-install new composite rake and fascia boards.

-paint rake and fascia to match roof color.

B. Boat House Roof, 1600 Sq/ft:

-remove existing shingles, rake boards, and fascia.

-prepare roof surface for installation of cedar shakes

-make sheathing repairs as necessary, up to 10%

-Install 30mil ice and water membrane on 100% roof surface.

-Replace copper flashing, in-kind dimensions.

-Install Cedar shakes, perfection, Number 1, 18”. Blue Label.

-Install new KDAT pressure treated, rake, fascia, and soffit.

-Paint rake and fascia to match existing.

4.0 - TASK AND DESIGN PERFORMANCE REQUIREMENTS:

-Provide all labor, daily transportation, boat transport, ferry transport, and debris removal.

-Provide all materials, supplies, tools, lumber, substrate, and hardware.

-Complete all work within the period of performance.

-Provide full 2-year warranty on all labor and honor full manufacturer warranty on materials.

4.1 – MATERIAL SPECIFICATIONS:

WATER BUILDING:

A. Metal roof specifications:

-Aluminum: .032” thick roofing panels and matching accessories

All aluminum panels and accessories are made of 3105-H25 aluminum sheet (minimum tensile strength

26,000 psi; minimum yield strength 22,000 psi) or equivalent.

-1 7/8” standing seam.

-Mechanically fastened with Type 316 stainless steel screws and manufacturer required washers.

-All fasteners will be hidden, snap-seam method.

-All flashing, cap, transition, and accessory pieces will be color matched to roof.

-Manufacturer recommended thermal and moisture barrier required.

-Panel finished coating, PVDF (polyvinylidene fluoride resin).

-Back of panels to be coated with protective primer and clear coat.

-Color match to Sherwin Williams SW6454

B. Trim/Rake/Fascia:

-Replace all Trim, Rake, and Fascia with composite trim. In-kind dimensions and design.

-Secure all boards with Type 316 stainless steel screws.

-Material will be Hardi/Composite or equivalent in all specifications.

C. Paint:

-Paint fascia, trim, and rake to match roof color.

-Use stain blocking exterior primer on all surfaces.

-2 Coats of Sherwin Williams Duration, exterior, gloss.

D. Hardware:

-All hardware, Type 316 Stainless Steel.

BOAT HOUSE:

A. Cedar Shake Specifications:

-Shingles- Perfection, 18”, .45” thick nominal, 5.5” reveal, Blue Label, Fire Grade B or better.

-Precut manufacturer specific ridge and hip shingles will be used where required.

B. Underlayment:

-30 mil rubber, self-adhesive.

C. Trim/Rake/Fascia:

-KDAT, Prime #1.

-Pressure Treated, .80PCF Nominal.

D. Hardware:

-Roof nails, Type 316 Stainless Steel.

-Screws, Type 316 Stainless Steel.

5.0 DELIVERY:

Deliver all materials to 131 Charles Street, Harkers Island, NC, 28531.

6.0 USE OF GOVERNMENT FURNISHED PROPERTY:

A. There is no use of any government furnished property. Contractor will provide all necessary tools, equipment and materials.

7.0 REMOVAL AND RECYING OF BUILDING MATERIALS:

A. Contractor will provide a secured/lockable on-site dumpster for removal of trash and other rubbish.

B. All recyclable items such as windows frames, glass, wood or cardboard packaging will be recycled.

C. All items, debris, and recyclables will be disposed of in a manner satisfying NCDEP, EPA, and DOI.

8.0 SECURITY/ SAFETY:

Contractor will provide a site-specific safety plan to the contracting officer before the start of any on-site work. The safety plan will include job standards and requirements providing a complete analysis of job procedures and the requirement of the work activity at this specific location. A Job hazard analysis will be reviewed daily by the contractor, sub-contractors, and any other employees present.

Include in your safety plan phone numbers and directions to local emergency medical facilities including local emergency medical technicians.

All accidents must be reported immediately to the Contracting Officer.

Contractor will adhere to all OSHA standards and practices.

9.0 PLACE OF PERFORMANCE:

-Cape Water Building and LSS Boat House. located on South Core Banks at Cape Lookout National Seashore.

-Located on an island, accessible only by boat, barge, or ferry.

-Contractor responsible for all daily transportation of personnel and materials.

10.0 PERIOD OF PERFORMANCE:

1/15/2023- 3/15/2023

11.0 SUBMITTALS REQUIRED:

-Metal Roof material and manufacturer specifications.

-Cedar Shake specifications.

-Hardware cut-sheets.

12.0 LOCATION:

RED- Harkers Island HQ, 131 Charles Street, 28531 ORANGE- Cape Water Building YELLOW- LSS Boat House

END OF SECTION