A3_Portland_District_HECP.pdf
PDF 3 MB Posted
- Attached to
- Quality Assurance Representative (QAR) Services Federal contract opportunity
- Solicitation number
- W9127N23R0018
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W9127N23R0018-0001 - QAR Services.pdf | ||
| Past Performance Questionnaire (PPQ).docx | DOCX document | |
| W9127N23R0018 - QAR Services.pdf | ||
| A1_Sample_Non-disclosure_Agreement.docx | DOCX document | |
| A2_Sample_Task_Order_Regional_QAR_Services_19Jan2023.docx | DOCX document | |
| A4_Seattle_District_HECP.pdf | ||
| A6 - Wage Determination for Sample Task Order.pdf | ||
| A5_Walla_Walla_District_HECP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CENWP-OD-SAF-385-1
CENWP-OD Standing Safety Procedure 385-1
SAFETY
Portland District Supplement to USACE Hazardous Energy Control Program
Portland District
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP- OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
Table of Contents 18 January 2020
1.0 Purpose
2.0 Applicability
3.0 References
4.0 Related Procedures
5.0 Definitions
6.0 Emergencies
7.0 Responsibilities
8.0 Training
9.0 Use of Locks and Tags
10.0 Hazardous Energy Control Procedures
11.0 Lockout/Tag out Requiring a Safe Clearance
12.0 Multi-Shift Clearance
13.0 Transfer of a Clearance
14.0 Personal Lockout
15.0 Issuing Individual (II) Clearance
16.0 Interconnect Orders
17.0 Unattended or Remote Stations
18.0 Caution Orders
19.0 Contractors or Non-Project Personnel
20.0 Non-Standard Maintenance
21.0 Abnormal Release and Removal
22.0 Records and Measurements
23.0 Inspection and Program Review
24.0 Attachments / Flow Chart
Foreword
This Standing Safety Procedure (SAF), Hazardous Energy Control (HEC) Program, is supplemental to, and is authorized by ER 385-1-31, The Control of Hazardous Energy. ER 385-1-31 is the overall governing document for USACE HEC programs and it mandates that Districts will supplement its contents with specific procedures. This SAF is not intended to be the all-encompassing single source document for the HEC Program. This document strives to capture those processes which have been identified to establish consistent procedures and criteria for the safe and reliable control of hazardous energy at Portland District operated facilities. Instances not specifically identified in this document may very well require additional research into those documents identified in paragraph 3.0 of this document and possibly other industry standard publications to include manufacturer maintenance guidance.
A5-1
BACKCHECK
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP- OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
Record of Review and Changes
Ch an ge
N o.
Page / Paragraph/ Section:
Statement of Review or Change:
Date:
Approval:
This document supersedes the CENWP HECP supplement dated 19 Oct 2011. It reformats the previous document into the approved standing procedure format. ENG Forms referenced but not included have been added to this SOP. Most notable changes include the clarification to the definition of the “Affected person” and the deletion of allowing a supervisor to lock on for his/her entire crew.
Added sections covering Interconnects and Hold Orders, paragraphs 7.13 and 7.14. Added paragraph 7.16 addressing non-standard equipment maintenance.
28 May 2014
DEW
All 7.3, 7.4 8.7.6
8.9.1
9.2 11.0 14.0 16.7 16.8 16.9 18.0
Re-ordered similar to ER385-1-1 PAI Locks the Isolation point vice the DRII Added option to train APs via face to face followed by a written assessment.
Changed training interval from annual to every 12 months Personal Lock key spares shall be destroyed PAI Locks Isolation points and TPG Process Added additional requirements to Personal Lockout Interconnect Clearance Procedure for Corps Work Interconnect Clearance Procedure for BPA Work Hold Order Procedure Added section to address LOTO in areas not under the direct control of and Operator
06 May 2016
Header Table of Contents
Full review and update of SAF 385-1; minor changes are not noted below; major changes include:
Remove “Fixed Plant” Deleted Non-Hydro section
18 Jan 2020
A5-2
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP-
Record of Review and Changes
Ch an ge
N o.
Page / Paragraph/ Section:
Statement of Review or Change:
Date:
Approval:
3, cont.
3.0 5.0
7.4.12 7.6 8.6.7 10.1
10.6
11.5.6
11.6.1.11 11.6.1.13 11.8.17 11.8.18 16.0 17.0
19 (formerly section 20) 19.8.2
Attachments
Deleted reference dates to reflect the most current Modified points list, affected person definition & deleted fixed plant definition Additional PAI Testing Requirements Modified Affected Person Responsibilities Modified Training requirements New or revised AHA required when scope of work changes Added section for PAI and/or AP verification/ testing performed per AHA, incl. date & time Revised review & verification requirements for isolation of equipment Added PAI and/or AP confirmation of absence of haz. energy via signing either the Safe Clearance Order form or Safe Clearance Activity Log Added PAI documents testing on AHA Added PAI reviews isolation points with AP(s) PAI documents method of verification on AHA PAI reviews isolation with AP(s) Deleted Outside Agency steps and responsibilities Modified when the same person can serve as a II and
PAI
Revised requirements for Contractors and Non- Project Personnel Added PAI and/or AP confirmation of absence of haz energy via signing either the Safe Clearance Order form or Safe Clearance Activity Log Revisions to HECP forms Add CENWP-OD Safe Clearance Violation Guidance MFR dated 2016-08-03
18 Jan 2020
A5-3
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP-
1.0 Purpose
1.1 This document establishes procedures and operating criteria that shall be complied with throughout the Portland District. It prescribes procedures for the safety of personnel and equipment protection when working on or near any system that produces, uses, or stores hazardous energy. It establishes minimum performance requirements and standards for the control of hazardous energy at Portland District operated facilities.
2.0 Applicability
2.1 This procedure applies to all personnel assigned to the Operations Division of the Portland District, U.S. Army Corps of Engineers and those individuals conducting business at any of the assigned Operating Projects.
2.2 HEC Program has been developed to establish and maintain the greatest practical level of consistency within the Portland District relative to hazardous energy control.
3.0 References.
3.1 ER 385-1-31, Engineering Regulation, Safety and Occupational Health, The Control of Hazardous Energy, 30 December 2016.
3.2 29 CFR 1910.147, Control of Hazardous Energy (Lockout/Tag out).
3.3 29 CFR 1910.269, Electric Power Generation, Transmission, and Distribution.
3.4 29 CFR 1910.333, Selection and Use of Work Practices.
3.5 OSHA Directive #CPL 02-00-147, The Control of Hazardous Energy – Enforcement Policy and
Inspection.
3.6 ANSI C2, National Electrical Safety Code.
3.7 ANSI/ASSE A10.44, Control of Energy Sources (Lockout/Tag out) for Construction and
Demolitions Operations.
3.8 EM 385-1-1, Engineer Manual, United States Army Corps of Engineers, Safety and Health Requirements Manual.
3.9 AR 690-700, Personnel Relations and Services (General) Chapter 751.
A5-4
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP- OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
3.10 Bureau of Reclamation, Facilities Instructions, Standards, and Techniques (FIST) Manuals, Volume 1-1, Hazardous Energy Control Program.
4.0 Related Procedures
4.1 Switching procedures, CENWP-OD SAF 385-2.
4.2 ER 385-1-100 & EP 385-1-100
4.3 NFPA 70E, Standard for Electrical Safety in the workplace.
5.0 Definitions.
Activity Hazard Analysis (AHA) – A documented risk management process by which the steps (procedures) required to accomplish a work activity are outlined, the actual or potential hazards of each step are identified, and measures for the elimination or control of those hazards are developed.
Affected Person (AP) – A person whose job requires operation or use of a machine or equipment on which servicing or maintenance is being performed under lockout or tag out, or whose job results in them being in an area protected by a clearance. An area being protected by a clearance includes the vicinity where there is an immediate or imminent threat of being injured by hazardous energy. If a person is in an area where an immediate or imminent threat of being injured by hazardous energy exists, they shall be trained as an AP, sign and lock onto a safe clearance.
Authorized Individual (AI) – A qualified person, authorized and designated in writing by the RO to lockout and/or tag out machines or equipment in order to perform installation, servicing or maintenance on that machine or equipment. An Authorized Individual employee becomes a PAI if they are holding the clearance or an Affected Person if their duties include performing servicing or maintenance under that clearance or lockout/tag out procedure.
Caution Order – A procedure to direct attention to abnormal conditions or equipment or special operating instructions which are to be followed.
Caution Order Record, ENG Form 1928 (see Attachment 6) – A form on which to record information pertinent to each Caution Order issued.
Caution Order Tag, ENG Form 1924 (see Attachment 4) – The tag attached to equipment to implement the Caution Order procedure.
A5-5
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP- OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
Clearance perimeter – The established working boundary or zone of equipment declared isolated from the sources of hazardous energy specified in a clearance. A clearance perimeter may include a combination of interrelated but different forms of hazardous energy common to the equipment.
Danger - Do Not Operate Tag, ENG Form 1925 (see Attachment 5) – The tag that is to be attached to each energy isolation device on equipment or entry point to an area requiring a safe clearance. Computer generated labels/tags are authorized as long as the tag retains compliance with the requirements for tag out devices.
Designated Representative to the Issuing Individual (DRII) – An Authorized Individual identified in the Hazardous Energy Control Program and designated in writing by the RO that is permitted to perform switching and place tags on energy isolation devices.
Direct Supervision – One person is under “direct supervision” of another individual when the person providing the “supervision” is physically with and overseeing the operation being performed by the employee (i.e., a trainee may perform certain job duties when the supervisor/leader/journeyman is physically with them, overseeing the work being performed by the trainee).
(Electrically) Qualified Person – One who has skills and knowledge related to the construction and operation of the electrical equipment and installations and has received safety training to recognize and avoid the electrical hazards that might be present with respect to that equipment or work method.
The QP shall be trained to understand: the specific hazards associated with electrical energy; the relationship between electrical hazards and possible injury and the safety-related work practices and procedural requirements as necessary to provide protection from the electrical hazards associated with their respective job or task assignments. See NFPA 70E and OSHA for electrical safety training requirements.
Energy Isolation Device – A physical device that prevents the transmission or release of energy, including but not limited to manually operated circuit breakers, disconnect switches, slide gates, slip blinds, line valves, blocks, or similar devices with a position indicator capable of blocking or isolating energy. The term does not include push buttons, selector switches, and other control circuit type devices.
Full personnel protection – A condition required when a tag out device is used in place of a lockout device. Full personnel protection is provided when
The tag out device is attached at the same location as the lockout device would have been attached;
All tag out-related requirements of this regulation have been complied with;
A5-6
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP- OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
Additional means have been taken to provide a level of safety commensurate with that of a lockout device. Such additional means include the removal of an isolating circuit element, blocking of a control switch, opening and tagging an extra (separated by distance) disconnecting device, or the removal of a valve handle to reduce the likelihood of energizing.
Group Lockout and Tag out – A lockout and tag out procedure used when servicing and/or maintenance is performed by a crew, craft, department or other group and which affords each employee a level of protection equivalent to that provided by the use of a personal lockout or tag out device.
Group Lockbox (or Lockbox) – A device used during group lockout to secure keys for the lockout devices.
Hazardous Energy Control Procedure – The written procedure which clearly and specifically identifies responsibilities and procedural steps for lockout and tag out and the requirements for testing the effectiveness of energy control measures.
Hazardous Energy Control Program – The written program that includes, at a minimum, identification of roles and responsibilities, energy control procedures, energy control locks and tags, procedures for removing energy control locks and tags, employee training, procedure inspections and program review. The Hazardous Energy Control Program shall be developed at the USACE District level to insure the greatest level of consistency among facilities and areas of responsibility.
Incidental Person (IP) – Visitors and/or other employees who may be at a site where energy control procedures are being used but will have no role or activity in an area that is under a safe clearance.
Incidental Person training is required if the visitor or other employee has unescorted access to a site where energy control procedures are being used. Incidental Persons are not authorized to enter an area being protected by a clearance. IP training, at a minimum, is required for unescorted access to a Project where HEC procedures are in effect.
Isolation – An activity which physically prevents the transmission or release of energy.
Isolation Locks – Hazardous energy control locks that are placed and removed by the PAI or Authorized Individual.
Issuing Individual (II) – A person, qualified by their knowledge of the type and magnitude of the energy, the hazards involved and the methods or means to control the energy, who is authorized and designated in writing by the RO to issue safe clearances. The Issuing Individual is a person with jurisdiction over an area or project, e.g., they may be the operator in charge of a shift at a powerhouse or lock, the supervisory engineer of a project or facility, or other person having
A5-7
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP- OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx operational control of systems to be placed under hazardous energy control procedures.
Lockout – The placement of a lockout device on an energy isolation device in accordance with an established procedure ensuring that the energy isolation device and the equipment being controlled cannot be operated until the lockout device is removed.
Lockout Device – A device that utilizes a positive means such as a lock and any associated hardware needed to secure an energy isolation device in the safe or off position to prevent the energizing of machines or equipment. The device must be identifiable, durable, and require excessive force or unusual tools/techniques to be removed by someone other than the Authorized Individual that attached the device. Blank flanges and bolted slip blinds are included.
Personal Lock – Uniquely keyed safety lock issued to or available to personnel to be used only for Hazardous Energy Control procedures. The lock shall identify the person to whom it is issued.
Personal Lockout – Lockout/Tag out not requiring a Safe Clearance.
Personal Tag – A tag required to be used during Personal Lockout (different from the ENG Form 1925).
Point of Contact (POC) – A designated representative to work with non-project personnel or contractors.
Principal Authorized Individual (PAI) – An Authorized Individual who requests and is issued a clearance or who is qualified and identified as being designated to remove equipment from service using lockout/tag out procedures.
Responsible Official (RO) – The person in charge of the project or facility who designates the Issuing and Authorized Individuals and approves and directs the HEC Program. The Responsible Official at each project or facility has overall responsibility for their Project's Program (and associated HEC procedures) and shall ensure that the requirements of this regulation are properly applied and adhered to. The RO will be designated in writing by the NWP-OD Chief of Operations and be limited to the respective Operating Project Manager (OPM). If there is an unusual situation where it is appropriate for the OPM not to be the RO, that request shall be made in writing to the District Chief of Operations.
Restricted area – Any area where hazardous conditions exist or have the potential to exist, such as inside electrical vaults or tanks with potentially hazardous atmospheres.
A5-8
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP- OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
Safe Clearance - A definite operating arrangement whereby a Principal Authorized Individual, acting individually or as a representative of a group, removes designated equipment from service by lockout or tag out.
Safe Clearance Order Sheet – Documentation from the II to the PAI/AI declaring that the equipment to be worked on has been isolated from sources of hazardous energy. The clearance is the authorization to perform specified work within the perimeter of the clearance. Once the clearance is issued and hung, the order is filed in the control room.
Safe Clearance Activity Log – Documentation of any changes to the safe clearance; for example, additional tag points, temporary tag lifts, clearance transfers, and removal of tag points. The Activity Log is filed in the work permit notebook.
Safe Clearance Points List – List of isolation points included in the Work Permit. Developed by the PAI and approved by the II based, in part, on the scope of work and AHA.
Safe Clearance Request - The form on which requests for safe clearances, and all other pertinent data in connection with safe clearances is maintained. Computer generated facsimiles are authorized (see Form 2).
Safe Clearance Sign-In Sheet – A document log of each individual who is working under the Safe Clearance and locks on to the lockbox. By signing the Sign-In-Sheet, the AP acknowledges they understand and concur the isolation provided for their work is adequate.
Stored Energy – Energy (electrical, mechanical, chemical, gravitational, etc.) that might be found in a charged capacitor, a loaded spring, chemical solutions, air and liquid reservoirs and piping, or similar forms. Stored energy is often referred to as potential energy, the amount of energy an object has due to its position.
Switching/Clearing Order – The step by step procedures to isolate or restore sources of energy.
System – Machinery, equipment, and electrical, hydraulic, or pneumatic lines that are under the operational control of a plant operator or equivalent.
Tag out – The placement of a hazardous energy control tag (ENG Form 1925) on an energy isolation device, in accordance with established procedures, to indicate that the energy isolation device and the equipment being controlled may not be operated until the tag is removed.
Temporary Lift Order – A switching/clearing order allowing isolation point locks and tags to be temporarily removed to perform testing and adjustments.
A5-9
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP- OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
Temporary Protective Grounds (TPGs) – Equipment intended to provide intentional grounding of an electrical circuit. Sometimes TPGs take the form of electrical conductors spliced or otherwise joined together with connection devices for connecting to an exposed electrical conductor. A manufacturer normally provides this type of device with an established fault-duty rating. Sometimes referred to as safety grounds, grounding sets, grounding devices.
Work Permit – HEC program documentation used by the PAI/AI to manage a Safe Clearance.
The Work Permit shall include at a minimum; the Safe Clearance Points List, Safe Clearance Sign-In Sheet, AHA, copy of the Safe Clearance Order, and Safe Clearance Activity Log.
6.0 Emergencies
6.1 In an emergency, the Responsible Official or his designated representative may modify or suspend any of these requirements temporarily as considered necessary to permit proper handling of the specific emergency. However, in handling such emergencies, safety of personnel and members of the public shall be given predominant consideration.
6.2 If emergency switching/clearing is required and Designated Representatives to the Issuing
Individual are not available, any person may perform switching/clearing if deemed qualified by the Issuing Individual.
7.0 Responsibilities
7.1 Responsible Official (RO) Operations Project Manager (OPM)
7.1.1 Responsible for the development and implementation of Portland District’s HEC Program at their respective project.
7.1.2 Maintains overall responsibility for Portland District's HEC Program and associated procedures at their respective project.
7.1.3 Ensures that the requirements of this supplemental regulation are properly applied and adhered to.
7.1.4 Ensures the local HEC Program supplement complies with EM 385-1-1 and ER 385-1-31.
7.1.5 Designates in writing, the Issuing Individuals (II), Designated Representatives to the
Issuing Individual (DRII), Principal Authorized Individuals (PAIs), Authorized Individuals (AI) and any special conditions at their respective project.
A5-10
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP- OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
7.1.6 Assures that the HEC Program is reviewed and updated annually utilizing Attachment 7 Self- Inspection Checklist.
7.1.7 Assures periodic inspections of the facilities HEC procedures.
7.1.8 Assures that plant documentation is available to all persons involved in issuing and holding Safe Clearances.
7.1.9 Ensures that initial and periodic training on Portland District’s HEC Program and its procedures is provided.
7.1.10 Coordinates HEC procedures between project operating and maintenance personnel, resource personnel, and contractors or other affected off-site personnel.
7.1.11 Ensures contractors and other affected government or non-government off-site personnel understand and comply with the provisions of the HEC Program.
7.1.12 Assures that appropriate action is taken subsequent to violations of HEC procedures.
7.1.13 Designates, in writing, which equipment may be removed from service using a Personal Lockout.
7.2 Issuing Individual (II)
7.2.1 Maintains responsibility for implementing the HEC procedures for all equipment affecting equipment and systems as appropriate to their areas of responsibility.
7.2.2 Maintains all documentation associated with HEC Program, in accordance with record retention requirements.
7.2.3 Temporarily relinquishes control of equipment to PAIs for the accomplishment of service and/or maintenance work under a Safe Clearance.
7.2.4 Directs the switching/clearing and related operations needed to place and remove Safe Clearances and to perform temporary tag lift procedures.
7.2.5 Accepts and releases Safe Clearances issued to the position for the following conditions:
line terminal clearances on tie lines and supply lines to and from outside utilities/agencies to establish safe working conditions within areas of high voltage equipment energized by these authorities.
A5-11
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP-
7.2.6 In consultation with the PAI, ensures equipment is ready for service after work has been completed and the PAI has requested release of a Safe Clearance.
7.3 Designated Representative to the Issuing Individual (DRII)
7.3.1 Assures proper positioning of energy isolation devices to isolate hazardous energy sources, as well as draining and depressurizing fluids from equipment as directed by the II.
7.3.2 Places devices to allow for lock installation by the PAI
7.3.3 Places appropriate tags while verifying their integrity.
7.3.4 Shall not proceed with switching if any of the following conditions exist until resolved by the II.
7.3.4.1 The instruction is not clearly understood.
7.3.4.2 They believe the instruction is incorrect.
7.3.4.3 At any point in the operations, an unexpected condition could or does result.
7.3.4.4 A device is found in an unexpected position.
7.3.5 Reports to the II upon the start and completion of switching/clearing.
7.3.6 Performs operations as directed by the II.
7.3.7 Resolves questions that arise at any point during the switching/clearing sequence.
7.4 Principal Authorized Individual (PAI)
7.4.1 Requests and holds Safe Clearances.
7.4.2 Uses an Activity Hazard Analysis (AHA) to identify and analyze all hazardous energy sources for the scope of work to be performed.
7.4.3 Responsible for the Safe Clearance and coordinates work performed by personnel working under the Safe Clearance.
A5-12
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP-
7.4.4 Verifies each isolation point is in the correct position and properly tagged.
7.4.5 Locks the isolation point and records the lock number on the clearance tag and Safe Clearance Points List.
7.4.6 Initials each isolation tag thereby accepting each point after verifying the point is properly positioned, tagged and locked.
7.4.7 Verifies every isolation point prior to accepting the clearance.
7.4.8 Responsible for the placement and removal of all physical barriers as required.
7.4.9 Responsible for verifying all hazardous energy is relieved, bled off or otherwise released.
7.4.10 Places their personal lock on the lockbox containing isolation lock keys.
7.4.11 Inspects the work area to ensure non-essential items have been removed from the system and the system components are operationally intact.
7.4.12 Assignment as PAI requires passing a written and oral test covering the material in SAF
385-1 administered by the RO or designee (designee shall be a Corps of Engineers employee and designated in writing by the RO).
7.5 Authorized Individuals (AI)
7.5.1 Same is PAI except, requests and holds Safe Clearances and Personal Lockouts for themselves only.
7.6 Affected Person (AP)
7.6.1 A person in an area, where an immediate or imminent threat of being injured by hazardous energy exists.
7.6.2 A person who performs servicing and maintenance within the physical boundaries of a safe clearance in accordance with this regulation and local HEC Program requirements.
7.6.3 Each Affected Person working under the group clearance shall sign the Safe Clearance Sign in Sheet verifying he or she fully understands the details of their job, the AHA, energy
A5-13
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP- OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx isolation devices actuated, the locks and tags installed, and will then place their personal lock on the group lockbox.
7.6.4 Each AP shall confirm all hazardous energy has been isolated for their work activity prior to signing into the clearance.
7.6.5 No AP shall sign into the clearance prior to concurring with the isolation.
7.7 Incidental Persons (IP)
7.7.1 Individuals identified as Incidental Persons must understand the consequences of violations of the HEC Procedures.
7.8 Violations
7.8.1 All personnel shall report violations of the HEC procedures to the Responsible Official for documentation. Violators shall be subject to appropriate disciplinary action.
8.0 Training
8.1 ER 385-1-31 and HEC Program training shall be provided by the RO or a designated individual.
8.2 Employees involved with HEC procedures shall have initial training and must demonstrate adequate working knowledge of HEC policy and local programs and procedures prior to being authorized and identified to assume any of the associated roles.
8.3 Training verification, containing each employee’s name and dates of training, is required for both initial training and retraining.
8.4 Training shall be provided to ensure that the purpose and function of Portland Districts’ HEC
Program is understood by all personnel
8.5 All training documentation shall be maintained at the project for at least two years.
8.6 ROs, PAI/AIs, and II/DRIIs shall be trained in:
8.6.1 Type and magnitude of energy present in the workplace
8.6.2 Recognizing hazardous energy sources.
A5-14
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP- OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
8.6.3 Methods and means to isolate and control energy.
8.6.4 Limitation of tags
8.6.5 Requirements of the local HEC program.
8.6.6 Consequences of violations.
8.6.7 PAIs, IIs, and DRIIs shall be trained by an approved government representative and/or take the most comprehensive Vivid training module available. Additionally, they shall pass an oral exam administered by the RO or designee.
8.7 APs shall be trained in:
8.7.1 HEC procedures.
8.8.2 Recognizing HEC locks and tags.
8.7.3 Limitations of tags.
8.7.4 Understanding the prohibition against attempting to restart or re-energize a machine, circuit or any equipment that is removed from service by the implementation of an HEC procedure.
8.7.5 Consequence of violations.
8.7.6 APs shall be trained through Vivid or face to face briefings by an approved government representative, and followed by a written assessment.
8.8 Training for IPs shall include:
8.8.1 Instruction regarding HEC procedures and the prohibition against altering or removing a lockout or tag out device and attempting to restart, reenergize, or operate the machinery.
8.8.2 Consequences of violations.
8.8.3 Training for IP’s may be accomplished through Vivid or face to face briefings by an approved government representative.
8.9 Retraining shall occur:
8.9.1 At least every 12 months and followed by a written assessment.
A5-15
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP-
8.9.2 When a periodic inspection reveals deviations from procedures or inadequacies in knowledge or use of HEC procedures.
8.9.3 When an employee is in violation of HEC Procedures.
8.9.4 When there is a change in job assignment, hazards, or in the HEC Program.
9.0 Use of Locks and Tags.
9.1 Locks:
9.1.1 Are capable of withstanding the conditions to which they are exposed for the maximum time that the exposure is expected, and are substantial enough to prevent removal without the use of excessive force or unusual techniques (such as with the use of bolt cutters).
9.1.2 Are standardized within every facility and recognizable as an HEC lock.
91.3 Examples of personal locks and clearance locks are displayed in Attachment 2.2 and Attachment 3.
9.1.4 Each shall be uniquely marked for positive identification.
9.1.5 All spare keys for the isolation point locks shall be destroyed with the exception of one spare key for lock sets.
9.2 Personal Locks:
9.2.1 Shall be used by all personnel that are protected by the Safe Clearance.
9.2.2 Shall not be used for any other purpose besides individual personal protection.
9.2.3 Shall indicate the identity of the person who applied them.
9.2.4 Shall only be removed by the person who applied the lock.
9.2.5 Shall be used in conjunction with personal tags when locking/tagging out without a clearance.
9.2.6 Shall have no spare keys.
9.2.7 Lockboxes shall be kept in a secure location.
A5-16
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP-
9.3 Tags:
9.3.1 Are standardized within every facility and have content and format equivalent to the example of ENG Form 1924, Caution Order Tag and the ENG Form 1925, Danger – Do Not Operate Tag, shown in Attachment 4 and Attachment 5.
9.3.2 Are constructed and printed so that exposure to weather conditions, wet or damp locations, or corrosive environments will not cause the tag to deteriorate or the message to become illegible.
9.3.3 Shall be attached by means which are non-reusable; self-locking; substantial enough to prevent inadvertent or accidental removal; non-releasable, with a minimum unlocking strength of no less than 50 pounds; and at least equivalent to a one-piece, all-environment-tolerant nylon cable tie.
9.3.4 Identify the person to whom the Safe Clearance is issued.
9.3.5 Tags shall only be removed by the II or DRII.
9.3.6 Tags shall never be bypassed, ignored or otherwise defeated.
9.4 Personal Tags:
9.4.1 Are standardized at each facility with the words “Danger – Do Not Operate.”
9.4.2 Identify the person to whom the personal tag is issued.
9.4.3 No more than four personal tags per person are issued.
9.4.4 Are constructed and printed so that exposure to weather conditions, wet or damp locations, or corrosive environments will not cause the tag to deteriorate, or the message to become illegible.
9.4.5 Shall be attached by hand through self-locking means; substantial enough to prevent inadvertent or accidental removal; non-releasable, with a minimum unlocking strength of no less than 50 pounds; and at least equivalent to a one-piece, all-environment-tolerant nylon cable tie.
9.4.6 Examples of personal tags are displayed in Attachment 5.
A5-17
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP-
9.5 Positive Controls in Public Access Areas:
9.5.1 In areas with public access, locks and other positive controls shall be used on the energy isolation devices.
9.5.2 Tags without a lock are not permitted in public access areas.
9.5.3 Refer to plant documentation for the application of lockout and tag out devices.
10.0 Hazardous Energy Control Procedures
10.1 Require an applicable/in-scope, written AHA for the work to be performed per EM 385-1-1. The AHA shall identify, analyze and provide controls for potential hazardous energy sources and be completed prior to conducting work (shall also address potential emergency situations). Additionally, the AHA shall identify the method of confirming the adequacy of the established isolation and absence of hazardous energy at the worksite. In the event Contractor personnel are completing an AHA for a clearance request, and do not have the knowledge to identify the methods of confirming the absence of hazardous energy, the PAI must include the method of testing on the AHA Every clearance request shall be accompanied by a specific AHA prepared by the person (GOV or contractor) performing the work activity. If the scope of work changes, a new AHA shall be written or the existing AHA shall be amended.
10.2 An orderly and systematic procedure to shut down and restore equipment shall be utilized to avoid any additional or increased hazards to personnel or equipment.
10.3 Any system operated by a remotely controlled source will be completely isolated so that it cannot be operated by the remote source or any other source.
10.4 Computer software, or any other type of programming, will not be used as isolation points.
10.5 Prior to starting any work on equipment under a Safe Clearance, isolation of all hazardous energy sources must be verified.
10.6 The PAI and/or AP, by signing either the Safe Clearance Order form or Safe Clearance Activity
Log confirming the absence of hazardous energy, are acknowledging that verification/testing has been performed as described in the AHA or Activity Log and no hazardous energy was detected as of the date and time of their signature
A5-18
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP-
11.0 Lockout/Tag out Requiring a Safe Clearance
11.1 Requests for a Safe Clearance:
11.1.1 The PAI/AI identifies the scope of work to be performed, develops the isolation and makes a request with sufficient time for the II to provide a Safe Clearance. The Safe Clearance Request Form will also denote the requirement for Temporary Protective Grounds (TPGs) and Isolation Points to be added after the clearance is accepted (on Request tags).
11.1.2 CENWP-OD HECP Form, Safe Clearance Request Form, or equivalent is used to formalize and document each isolation point and or TPG.
11.1.3 Requests for a Safe Clearance should be specific and provide adequate information to complete the Safe Clearance Order Sheet.
11.1.4 The PAI/AI and II shall ensure that the equipment to be placed under a Safe Clearance will be effectively isolated for the requested scope of the work to be performed.
11.1.5 Non-routine or complex clearances should be peer reviewed when possible.
11.2 Application of the Requested Safe Clearance
11.2.1 Upon approval of a Safe Clearance Request, the II shall:
11.2.2 Verify that the requesting person is qualified and authorized in the appropriate project supplement;
11.2.3 Ensure that the Safe Clearance correctly designates the positioning of all energy isolation devices specified in the Safe Clearance Points List and provides for locking and tagging all points accordingly;
11.2.4 Ensure that the proposed devices will be applied and removed in proper sequence.
11.2.5 Make all necessary arrangements for interruption of services, including notification of customers and coordination with appropriate agencies and other entities to ensure isolation of systems to be cleared; AND
11.2.6 Prepare the Safe Clearance and the associated Safe Clearance Tags.
A5-19
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP- OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
11.2.7 If there are any questions regarding the completeness or correctness of the Safe Clearance, the questions shall be resolved before switching/clearing is started. If a question arises at any point during the switching/clearing sequence, it shall be resolved by the II or DRII and the PAI/AI before continuing with the switching/clearing.
11.3 The II or DRII performs the switching/clearing following these requirements:
11.3.1 The II authorizes the start and is notified at the completion of switching/clearing operations.
11.3.2 The equipment/system shall be isolated in accordance with the switching/clearing order.
11.3.3 Prior to the application of tags to energy isolating devices, all known potentially hazardous stored or residual energy shall be relieved, disconnected, restrained, or otherwise rendered safe.
11.3.4 Energy isolating devices needed to control energy to, or within the system shall be physically located and positioned in such a manner as to isolate energy sources and secure the isolation point in the safe position by placing a tag on the isolation devices.
11.3.5 Tags shall be affixed to each energy isolation device with a gang locking device at the same point where the lock will be attached by the PAI. The tag will clearly indicate that the operation or movement of the energy isolation devices from the position listed on the tag is prohibited.
11.3.6 Upon completion of the switching/clearing step, the DRII will initial each tag and write the time/date, and initial the Switching/Clearing Order.
11.3.7 If there is a re-accumulation of stored energy to a hazardous level, corrective measures shall be taken prior to the completion of switching/clearing.
11.3.8 The II shall provide the PAI/AI with the Safe Clearance Points List.
11.4 PAI/AI will verify and lock isolation points:
11.4.1 PAI/AI shall assure that energy isolation devices are properly positioned, and tagged.
11.4.2 The PAI/AI will lock the isolation point.
11.4.3 The PAI/AI will record the lock number on the clearance tag and Safe Clearance Points List.
A5-20
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP- OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
11.4.4 PAI/AI will initial each isolation point tag upon verification of that device is in the proper position, tagged and locked.
11.4.5 The PAI/AI will place the isolation point lock key in a lockbox.
11.4.6 When all the isolation point keys have been placed into the lockbox the PAI/AI will place their personal lock onto the lockbox.
11.4.7 PAI signs the Safe Clearance Order in person or per telecom via the II.
11.5 Issuing a Safe Clearance
11.5.1 Upon PAI/AI acceptance of the Safe Clearance, the II issues a Safe Clearance to the
PAI/AI. The following data will be entered in the station logbook: safe clearance number; purpose of the safe clearance; system to be cleared; date and military time of issue; name of the II; and name of PAI/AI receiving the Safe Clearance.
11.5.2 The preferred method of issuing Safe Clearances is in person.
11.5.3 TPGs shall be placed and documented on the Safe Clearance as appropriate.
11.5.4 The II shall remain cognizant of equipment condition and status while the Safe Clearance is in place.
11.5.5 If there is a re-accumulation of stored energy to a hazardous level, work shall stop until corrective measures have been taken.
11.5.6 Personnel being protected by the clearance shall:
11.5.6.1 Be briefed on HEC Procedures, understand the protection provided by the Safe Clearance, and be afforded the opportunity to verify proper application of locks and tags.
11.5.6.2 Obtain permission from the PAI prior to placing their personal lock on the lockbox and signing onto the Safe Clearance Sign-In Sheet.
11.5.6.3 Keep the PAI informed of any additional protection deemed necessary.
11.5.6.4 Prior to any AP starting work on equipment under a Safe Clearance, the PAI shall
A5-21
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP- OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx review with all APs signing onto the clearance, the limits of the de-energized and isolated working area, including any unusual conditions.
11.5.6.4.1 At a minimum, a review of the Safe Clearance will take place at the job site with the PAI and AP(s) and shall include: review of AHA, work to be completed, inspection of the work site for hazardous energy, and a review of the isolation point status.
11.5.6.4.2 Each Affected Person working under the group clearance shall sign the Safe Clearance Sign in Sheet verifying he or she fully understands the details of their job, the energy isolation devices actuated, the locks and tags installed, and will then place their personal lock on the group lockbox.
11.5.6.4.3 No AP shall sign into the clearance without concurring that the isolation is adequate for their work.
11.5.6.5 After reviewing the Safe Clearance, the PAI and the first AP signing onto the clearance shall inspect and test the work site to verify the adequacy of the protection provided. The first AP shall concur with the method of inspection and be qualified to perform the testing.
11.5.6.5.1 The method of testing shall be described on the specific AHA for the associated clearance. Only the first AP to sign onto the clearance is required to test for the absence of hazardous energy with the PAI. The AP and PAI who perform the verification/testing shall sign and record this on the Safe Clearance Order.
11.5.6.5.2 The PAI and/or AP, by signing either the Safe Clearance Order form or Safe Clearance Activity Log confirming the absence of hazardous energy, are acknowledging that verification/testing has been performed as described in the AHA or Activity Log and no hazardous energy was detected as of the date and time of their signature.
11.5.6.5.3 The method of testing for isolation points added after the clearance has been accepted, or re-hung after a temporary lift, will be described and documented on the Safe Clearance Activity Log.
11.5.6.5.4 No other APs shall sign onto the Safe Clearance sign-in sheet prior to confirming completion of the verification/testing documentation.
11.5.6.5.5 Other APs are required to confirm the verification/testing has
A5-22
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP- OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx been completed by observation of the first AP’s signature on the Safe Clearance order. If isolation points have been, added or temp lifted and restored, confirmation of the testing signature is recorded on the Safe Clearance Activity sheet.
11.5.6.5.6 APs other than the first APs to sign onto the clearance may test the isolation provided it poses no risk to APs already working at the job site protected by the clearance. For example, testing for voltage with a volt meter doesn’t add additional risk to APs already working on the circuit. Attempting to open a spill gate while other APs are working below it does increase the risk of danger to APs working below the spill gate.
11.5.6.5.7 Work that requires electrical energy to be isolated shall be made electrically safe via a Safe Clearance and tested as follows:
11.5.6.5.7.1 An adequately rated test instrument will be used to test each phase conductor or circuit part to verify it is de-energized.
11.5.6.5.7.2 Test each phase conductor or circuit part both
phase-to-phase and phase-to-ground.
11.5.6.5.7.3 Before and after each test, determine that the test instrument is operating satisfactorily through verification on a known voltage source.
11.5.6.6 Keep the PAI informed of equipment conditions and the status of work.
11.5.6.7 For Contractors, see section 19.7 and 19.8.
11.6 Adding/Releasing Clearance Points
11.6.1 Adding a point:
11.6.1.1 If the addition of a new point is the result of a change in scope of work for which the original clearance was written, an updated AHA is required.
11.6.1.2 The PAI/AI requests the addition of Safe Clearance isolation points from the II.
11.6.1.3 PAI shall notify all personnel that specific isolation points will be added.
A5-23
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP- OD SharePoint portal, Libraries at: https://intranet.usace.army.mil/nwd/nwp/od/pages/home.aspx
11.6.1.4 All personnel will sign off the Safe Clearance Sign-In Sheet and remove their personal locks from the lockbox.
11.6.1.5 DRII performs applicable switching/clearing procedures.
11.6.1.6 DRII tags the isolation points.
11.6.1.7 The PAI/AI shall verify and initial the additional isolation points for accuracy and assure that energy isolation devices are properly positioned, and tagged.
11.6.1.8 The PAI/AI shall record the lock number on the tag and Safe Clearance Points list.
11.6.1.9 The PAI/AI shall lock the isolation point and lock the key in the lockbox using a personal lock.
11.6.1.10 PAI/AI accepts the points from the II and documents the addition of isolation points in the Safe Clearance Activity Log.
11.6.1.11 The PAI shall document the method of testing the new isolation points on the Safe
Clearance Activity Log in lieu of the AHA for points added after the clearance has been accepted.
11.6.1.12 PAI notifies personnel signing and locking back onto the Safe Clearance of the new boundaries.
11.6.1.13 The PAI shall review and test the new isolation with the APs per 11.5.6 or 19.7 and
19.8 for contractors.
11.6.2 Releasing a Point
11.6.2.1 The PAI/AI requests the release of Safe Clearance isolation points from the II.
11.6.2.2 PAI shall notify all personnel that specific isolation points will be released.
11.6.2.3 All personnel will sign off the Safe Clearance Sign-In Sheet and remove their personal locks from the lockbox.
11.6.2.4 PAI/AI will remove their personal lock from the lockbox only long enough to allow
A5-24
Current Approved Version 18 Jan 2020). Printed copies are for “Information Only.” The controlled version resides on the CENWP-for the removal of the AP’s isolation locks.
11.6.2.5 DRII removes the tag and performs applicable switching procedures.
11.6.2.6 PAI/AI documents release of isolation points in the Safe Clearance Activity Log.
11.6.2.7 PAI notifies personnel signing and locking back onto the Safe Clearance of the new boundaries.
11.7 Temporary Protective Grounds (TPGs)
11.7.1 Protective grounds can only be placed after a clearance is in place and has been accepted by the PAI/AI.
11.7.2 The National Electrical Safety Code shall be used as a guide in grounding requirements and procedures.
11.7.3 Locks are not required on TPGs.
11.7.4 TPGs shall be tracked and administered on the Clearance Placement Order Form, Hanging Removal Record Form and the Safe Clearance Order Form for accountability and personal safety.
11.7.4.1 Safe Clearance is initially accepted and documented on the Safe Clearance…