Notes to Vendors Corrected pre-bid site tour information:
Site Tour: Meet at 10:00 on Wednesday, June 29, 2022 at the Pumphouse Campground at the Launch 2 Ramp. To access the campground, take Grand County Road 1 (Trough Road) as shown on the Title Sheet, Google earth Coordinates for campground are 39.987707, -106.510772. Site tour is only available per vendor’s request. If you plan to attend the site tour, please notify Contracting Officer by Monday, June 27, 2022 via email cnguyen@blm.gov. If no vendor is showing interest by June 27, 2022, site tour will be cancelled.
Changes to Drawing #8, L3 Concrete Staging Area Made changes to Note: 2 and added Note: 5.
2. Boulders placed between staging area and existing sidewalk shall extend ±8” above the existing sidewalk, grades as shown in “Section A-A” of drawing ”Details and Section Views”.
5. Install #5 Rebar within the proposed concrete for the Staging Area. Place rebar at ±16" o.c., each direction, with 3" edge clearance.
Changes to Drawing #9, Details and Section Views Added text to show rebar in “Section View A-A” Made changes to Note #3
3. Rebar not shown in trails sections. Rebar shall be installed in the section of the L2 Trail between STA 1+60 and STA 1+85, within the L3 Concrete Staging Area, and within the L3 Parking and Toilet Entrance. Rebar is not required in the remaining sections of the L2 and L3 Trails.