SITE DEMOLITION
Pumphouse ADA Improvements 03/22
02223 - 1
SECTION 02223
PART 1: GENERAL
1.1 SUMMARY
A. Section Includes: The removal and disposal of concrete flatwork, wood barrier posts, timber steps, and vegetation acquired from clearing and grubbing. Locations of items are as shown on the drawings.
PART 2: PRODUCTS
(No products are required in this section.)
PART 3: EXECUTION
3.1 DEMOLITION
A. Concrete Flatwork: Remove and dispose of approximately 535 square feet
(SF) of concrete flatwork as shown on the drawings.. Removal includes but is not limited to the removal and disposal of concrete walkways and toilet entry way. Concrete is estimated to be between 6” thick, with rebar.
B. Wood Barrier Posts: Remove approximately 10 each of existing wood barrier posts. Posts are approximately 10” diameter x 60” length, buried depth estimated to be 30”.
C. Timber Steps: Remove approximately 5 each, 6” x 6” x8’ treated timber or railroad tie steps. Remove all items associated with the anchoring of the steps.
3.2 DISPOSAL OF DEBRIS
A. Requirements: Items or debris removed shall become the property of the Contractor. Remove such materials from the site and dispose of in a legal manner.
3.3 BACKFILLING
A. General: Fill cavities caused by demolition and removal of items. Fill disturbed areas where concrete flatwork has been removed with material as approved by the Contracting Officer.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will be measured and paid for on a lump sum basis for the removal and disposal of the existing concrete, timber steps, wood barrier posts and materials acquired from clearing and grubbing as shown on the drawings.
Pumphouse ADA Improvements 03/22
02223 - 2
4.2 BASIS OF PAYMENT
A. Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Pay Item Pay Unit
02223(1) Site Demolition. . . . . . . . . . . . . . . . LS
END OF SECTION