A23_2026 SMART SCALE - SAFETY IMPROVEMENTS
Solicitation number
IFB-126156
Issued by
Chesterfield County, Roanoke City, Virginia

About this file

This is a project description document from the Virginia Department of Transportation (VDOT) for a SMART SCALE safety improvements project designated A23_2026. The project encompasses safety improvements on a roadway segment extending from 0.20 miles south of Route 76 on ramp to 0.52 miles north of Route 76 on ramp. Prequalification is required for all prospective contractors bidding on this opportunity. All inquiries and questions regarding the project must be submitted to VDOT through the Contractors Advertisement Bulletin Board (CABB) system. The specific scope of work, detailed project requirements, item quantities, response deadlines, site visit schedules, and bidders' conference information would be contained in the full solicitation documents associated with this contract opportunity.

Additional details regarding pricing structure, contract terms, funding sources, and other relevant bid requirements are referenced within the associated solicitation materials. As a SMART SCALE project, this initiative is part of Virginia's competitive grant program that prioritizes transportation improvements based on established selection criteria. Contractors should refer to the complete project documentation and VDOT's procurement guidelines for comprehensive information on submission requirements, evaluation criteria, and award procedures.

View the file

Other files

File Type Posted
A23B_119597_Addendum_signed.pdf PDF
A23B_119597.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF TRANSPORTATION

Stephen C. Brich, P.E. 1221 East Broad Street Commissioner Richmond, Virginia 23219

VirginiaDOT.org

WE KEEP VIRGINIA MOVING

September , 2026

Order No.: A23 Project: 0076-964-927, C501

FHWA: STP-5A27(864)

District: Richmond County: Chesterfield Route: 76 Bids: September 23, 2026

To Holders of Bid Proposals:

Please make the following changes in your copy of the bid proposal and plans for the captioned project:

BID PROPOSAL

- Item ID 315SD20-0011 ASPHALT CONCRETE TY. BM-25.0D CONSTR in the SOI has been revised to show change to item code 315SD20-0010 ASPHALT CONCRETE

BM-25.0.

- Item ID 602SD20-0003 TOPSOIL CLASS B 2" in the SOI has been revised to show change to item code 602SD20-0005 TOPSOIL CLASS B 2".

- Page 192 has been revised to show change in allowable hours for rolling road blocks.

PLANS

- Plan sheet 0076-964-927 C501_02e(01)_r1 has been revised.

- Plan sheet 0076-964-927 C501_03_r1.pdf has been revised.

- Plan sheet 0076-964-927 C501_03c_r1 has been revised.

These plans are available for viewing and downloading from ProjectWise.

Sincerely, James L. Swanson, P.E.

State Contract Engineer Construction Division Enclosures

ORDER NO.: A23

CONTRACT ID. NO.: C0000119597C01B

Form C-6a

Rev. 3-22-05

CNSP (F) 1-9-06

COMMONWEALTH OF VIRGINIA

BID PROPOSAL AND CONTRACT

ROUTE NUMBER: 76

FHWA NUMBER: STP-5A27(864)

PROJECT NUMBER: 0076-964-927, C501

COUNTY: CHESTERFIELD

DISTRICT: RICHMOND

DESCRIPTION: SMART SCALE - SAFETY IMPROVEMENTS

FROM:

TO:

0.20 MI. S. OF RTE. 76 ON RAMP

0.52 MI. N. OF RTE. 76 ON RAMP

DATE BID SUBMITTED: 10:00 AM WEDNESDAY, SEPTEMBER 23, 2026

Form C-118 Rev. 8-10-2026

COMMONWEALTH OF VIRGINIA

DEPARTMENT OF TRANSPORTATION

NOTICE TO BIDDERS

As a matter of information, the bidder’s attention is directed to the points noted herein. Every point enumerated below is fully covered by proposal documents that describe them in detail. Bidders should check their proposal against all requirements, as strict compliance with all provisions is mandatory.

1. Bids shall be filed electronically through Bidx (https://bidx.com/site/home) at the times designated in the Notice of Advertisement for Bids. For information see (https://cabb.virginiadot.org/)

2. Unless otherwise specified or permitted in the proposal, prices shall be submitted on all items shown in the proposal.

3. Proposals conditioned by proposed alternates, other than those specified or permitted, or by reserving the right to accept or reject an award or to enter into a contract pursuant to an award will not be considered.

4. A bid total shall be shown in each space provided.

5. Bid bonds shall conform to Section 102.07. The bid bond number shall be placed in the appropriate space in your electronic bid. As an alternative, you may complete the bottom line of Form C-24. The form may be emailed to the Construction Division at VDOTContracts@vdot.virginia.gov and must be received prior to the opening of bids.

6. Joint venture proposals shall show the Firm Name of each party and shall be signed by an authorized representative of each Firm. A letter shall be filed with the prequalification office describing responsibility of each firm and the amount of maximum capacity pledge by each firm of a joint venture.

https://bidx.com/site/home http://cabb.virginiadot.org/ mailto:VDOTContracts@vdot.virginia.gov

Form C-24

Rev. 7-6-05

COMMONWEALTH OF VIRGINIA

PROPOSAL GUARANTY

KNOW ALL MEN BY THESE PRESENTS, THAT WE _______________________________________ as principal, and ________________________________________ Surety, are held and firmly bound unto the

Commonwealth of Virginia as obligee, in the amount of FIVE PERCENT OF THE DOLLAR VALUE OF THE

BID, lawful money of the United States of America, for the payment of which, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally and firmly by these presents.

SIGNED, sealed and dated this Day of , 20

WHEREAS, the above said principal is herewith submitting its proposal for:

PROJECT NUMBER: 0076-964-927, C501

NOW, THEREFORE, the condition of the above obligee is such, that if the aforesaid principal shall be awarded the contract upon said proposal and shall within the time specified in the Specifications after the notice of such award enter into a contract and give bond for the faithful performance of the contract, then this obligation shall be null and void; otherwise to remain in full force and effect and the principal and surety will pay unto the obligee the difference in money between the amount of the bid of the said principal and the amount for which the obligee may legally contract with another party to perform the said work if the latter amount be in excess of the former; but in no event shall the liability exceed the penal sum hereof.

(Principal*) (Surety Company)

By: By:

(Officer, Partner or Owner) (Seal) (Attorney-in-Fact**) (Seal)

(Principal*) (Address)

(Officer, Partner or Owner) (Seal) (Surety Company)

(Principal*) (Attorney-in-Fact**) (Seal)

(Officer, Partner or Owner) (Seal) (Address)

*Note: If the principal is a joint venture, each party thereof must be named and execution made by same hereon. If there is more than one surety to the bid bond, each surety must be named and execution shall be made by same hereon.

Electronic Bid Only: In lieu of completing the above section of the Contract Performance Bond, the Principal shall file an Electronic Bid Bond when bidding electronically. By signing below the Principal is ensuring the identified electronic bid bond has been executed and the Principal and Surety are firmly bound unto the Commonwealth of Virginia under the same conditions of the bid bond as shown above.

Electronic Bid Bond ID# Company/Bidder Name Signature and Title

**Attach copy of Power of Attorney

Form C-48 Rev. 10-03-25

SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION,

AND VENDOR SURVEY FORM (ALL VENDORS)

PROJECT NO. 0076-964-927, C501 CONTRACT I.D. NO. C0000119597C01B

FHWA NO. STP-5A27(864) DATE SUBMITTED

All vendors submitting a bid as a Prime Contractor shall complete and submit with their bids the following information as requested for (1) Subcontractor/Supplier Solicitation, and Utilization, and (2) for Vendor Survey.

The vendor certifies this form accurately represents its solicitation and utilization or non-utilization, as indicated, of the firms listed below for performance of work on this contract. The vendor also certifies he/she has had direct contact with the named firms regarding participation on this project.

Vendor Signature:

Vendor ID No. Title:

Vendor’s Address: ____________________________________

City: __________________

State: __________________ Zip Code: _________

SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION (ALL)

VENDOR

NUMBER

NAME OF SUBCONTRACTOR/SUPPLIER TELEPHONE

NUMBER

UTILIZED

(Y/N)

NOTE: ATTACH ADDITIONAL PAGES, IF NECESSARY.

BIDDER MUST SIGN EACH ADDITIONAL SHEET TO CERTIFY ITS CONTENT AND COMPLETION OF FORM.

FEDERAL LAW REQUIRES ALL VENDORS SUBMITTING BIDS OR OFFERS PROVIDE THE INFORMATION

REQUESTED IN THIS FORM.

Form C-48 Rev. 10-03-25

VENDOR SURVEY

WHEN SUBMITTING A BID OR OFFER AS A PRIME CONTRACTOR, THE BIDDER MUST SUBMIT A

VENDOR SURVEY FOR THEMSELVES AND A VENDOR SURVEY FOR EACH SUBCONTRACTOR

AND SUPPLIER WHO SUBMITTED A BID OR QUOTE TO THE BIDDER.

VENDOR’S FULL LEGAL NAME: ________________________________________

VENDOR ID NO.: __________________

ADDRESS: ____________________________________

CITY: ____________________________________

STATE: _______________ ZIP CODE: _________

VENDOR’S YEARS IN BUSINESS: _____________

VENDOR’S ANNUAL GROSS RECEIPTS: ____ $ 0 - 25 million ____ $ 25 - 50 million ____ $ 50 - 75 million ____ More than $75 million

THE UNDERSIGNED, ON BEHALF OF VENDOR IDENTIFIED ABOVE, ACKNOWLEDGES AND CERTIFIES THAT THIS FORM ACCURATELY STATES THE INFORMATION CONTAINED HEREIN TO THE BEST OF VENDOR’S

KNOWLEDGE.

Printed Full Legal Name of Person Signing for Vendor

Signature: ____________________________________________

Form C-7

Rev. 2-2-24

SHEET 1

TERMS OF THE PROPOSAL\CONTRACT

SUBMITTED: 10:00 AM WEDNESDAY, SEPTEMBER 23, 2026

ROUTE NUMBER: 76

FHWA NUMBER: STP-5A27(864)

DESCRIPTION: SMART SCALE - SAFETY IMPROVEMENTS

FROM:

TO:

0.20 MI. S. OF RTE. 76 ON RAMP

0.52 MI. N. OF RTE. 76 ON RAMP

DISTRICT: RICHMOND COUNTY: CHESTERFIELD

I/we declare that no other person, firm or corporation is interested in this proposal; that I/we have carefully examined the plans, job specifications, current Road and Bridge specifications, and all other documents pertaining thereto and thoroughly understand the contents thereof; that I/we meet the prequalification requirements for bidding on this proposal;

that I/we understand that the plans and current Road and Bridge specifications, are a part of this proposal; that all of the quantities shown herewith are a part of this proposal; that all the quantities shown herewith are approximate only; that I/we have examined the location of the proposed work and source of supply of materials; and that I/we agree to bind myself/ourselves upon award by the Commonwealth under this proposal to a contract with necessary surety bond to start work according to project specifications, and to complete all work in accordance with the plans, job specifications and current Road and Bridge Specifications within the time limit set forth in the contract.

COMPLETION DATE: JULY 7, 2028

BID TOTAL $

Attached is a bond conforming to the requirements of the current Road and Bridge Specifications, it being understood that such bond is to be forfeited as liquidated damages if, upon acceptance of the terms of this proposal, I/we fail to execute the contract and furnish bond as provided in the current Road and Bridge Specifications.

(Names of Individual(S),Firm(S) Or Corporation)

Street Address City State Zip Code Vendor#/Fin#

Print Name Signature Title

In consideration of the commitments made as shown herein, the Commonwealth of Virginia by The Commonwealth Transportation Commissioner agrees to pay for all items of work performed and materials furnished at the unit price(s) and under the conditions set forth in this proposal, in witnessed by the affixing of the name below.

Contract Execution Date By

CHIEF ENGINEER

VIRGINIA DEPARTMENT OF TRANSPORTATION

Virginia Department of Transportation 08/28/2026Date Printed:

Schedule of Items Page: 2

Proposal ID: C0000119597C01B 0076-964-927, C501

Order No.: A23

Oversight/State Project No.:

Federal Project No.: STP-5A27(864)

Contractor:

0001 REGULAR BID ITEMSSECTION:

Cat Alt Set ID: Cat Alt Mbr ID:

Bid AmountUnit Price Approximate Quantity and

UnitsDescription

Item ID Proposal

Line Number Dollars Cents Dollars Cents

Spec No.

0010 301SD20-0001

CLEARING AND GRUBBING LUMP SUM _________._____LUMP SUM

0020 302SD20-0013

ENDWALL EW-12 EA

5.000

0030 302SD20-0027

15" STORM SEWER PIPE LF

104.000

0040 302SD20-0239

DROP INLET DI-2A EA

1.000

0050 302SD20-0244

DROP INLET DI-2B,L=10' EA

1.000

0060 302SD20-0245

DROP INLET DI-2B,L=12' EA

1.000

0070 302SD20-0662

MANHOLE MH-1 OR 2 LF

14.000

0080 302SD20-0663

FRAME & COVER MH-1 EA

1.000

0090 302SX20-0022

DRAINAGE (LEVEL

SPREADER 6"X6" WOOD

POST)

EA

1.000

ATTD

0100 303SD20-0001

REGULAR EXCAVATION CY

2,714.000

0110 303SD20-0007

BORROW EXCAVATION CY

1,123.000

0120 303SD20-0022

CHECK DAM ROCK TY. I EA

20.000

0130 303SD20-0023

CHECK DAM ROCK TY. II EA

13.000

0140 303SD20-0024

CHECK DAM SEDIMENT

RETENTION ROLL 18"

EA

2.000

REVISED 9/2/26

Schedule of Items Page: 3

Proposal ID: C0000119597C01B 0076-964-927, C501

Order No.: A23

Oversight/State Project No.:

Federal Project No.: STP-5A27(864)

Contractor:

0001 REGULAR BID ITEMSSECTION:

Cat Alt Set ID: Cat Alt Mbr ID:

Bid AmountUnit Price Approximate Quantity and

UnitsDescription

Item ID Proposal

Line Number Dollars Cents Dollars Cents

Spec No.

0150 303SD20-0029

SILTATION CONTROL

EXCAVATION

CY

2,953.000

0160 303SD20-0031

INLET PROTECTION TYPE B EA

12.000

0170 303SD20-0034

TEMP. SILT FENCE TYPE A LF

16,436.000

0180 308SD20-0012

AGGR. BASE MATL. TY. I NO.

21B

TON

1,297.000

0190 315SD20-0001

ASPHALT CONCRETE TY. SM-

12.5A CONST

TON

324.000

0200 315SD20-0005

ASPHALT CONCRETE TY. IM-

19.0D CONST

TON

610.000

0210 315SD20-0009

ASPHALT CONCRETE TY. SM-

9.5E CONST

TON

1,180.000

0220 315SD20-0010

ASPHALT CONCRETE BM-25.0 TON

648.000

0230 315SD20-0015

RUMBLE STRIP CYLINDRICAL

ASPHALT

LF

5,666.000

0240 315SD20-0016

LIQUID ASPHALT COATING

(RUMBLE STRIP)

SY

854.000

0250 315SD20-0018

ASPH.CONC.CURB BACKUP

MATL. CONST

TON

20.000

0260 315SD20-0104

SAW-CUT ASPHALT

CONCRETE FULL DEPTH

LF

11,464.000

Schedule of Items Page: 4

Proposal ID: C0000119597C01B 0076-964-927, C501

Order No.: A23

Oversight/State Project No.:

Federal Project No.: STP-5A27(864)

Contractor:

0001 REGULAR BID ITEMSSECTION:

Cat Alt Set ID: Cat Alt Mbr ID:

Bid AmountUnit Price Approximate Quantity and

UnitsDescription

Item ID Proposal

Line Number Dollars Cents Dollars Cents

Spec No.

0270 315SX20-0007

ASPHALT CONCRETE -

ASPHALT CONCRETE TY. BM-

25.0A CONST

TON

1,045.000

ATTD

0280 414SD20-0001

EROSION CTRL. STONE CL.

A1, EC-1

TON

2.000

0290 414SD20-0012

DRY RIPRAP CL.I 26" TON

16.100

0300 501SD20-0004

UNDERDRAIN UD-4 LF

1,520.000

0310 501SD20-0009

OUTLET PIPE LF

49.000

0320 502SD20-0020

CURB, ASPHALT MC-3B LF

481.000

0330 504SD20-0001

CONCRETE CLASS A3 MISC. CY

1.700

302, 504

0340 504SD20-0005

GEOTEXTILE DRAINAGE

FABRIC

SY

20.800

0350 505SD20-0013

GUARDRAIL GR-MGS1, 9'

POST

LF

3,393.000

0360 505SD20-0017

GUARDRAIL TERMINAL GR-

MGS2

EA

4.000

0370 505SD20-0018

GUARDRAIL END

ANCHORAGE GR-MGS3

EA

5.000

0380 505SD20-0019

GUARDRAIL HEIGHT

TRANSITION GR-MGS4

EA

7.000

Schedule of Items Page: 5

Proposal ID: C0000119597C01B 0076-964-927, C501

Order No.: A23

Oversight/State Project No.:

Federal Project No.: STP-5A27(864)

Contractor:

0001 REGULAR BID ITEMSSECTION:

Cat Alt Set ID: Cat Alt Mbr ID:

Bid AmountUnit Price Approximate Quantity and

UnitsDescription

Item ID Proposal

Line Number Dollars Cents Dollars Cents

Spec No.

0390 505SD20-0047

FIXED OBJECT ATTACH. GR-

FOA-3 TY. I

EA

3.000

0400 505SD20-0054

FIXED OBJECT ATTACH. GR-

FOA-2 TY. II

EA

2.000

0410 505SD20-0073

REMOVE EXISTING

GUARDRAIL

LF

3,152.000

0420 508SD20-0003

DEMO. OF PAVEMENT RIGID SY

528.000

0430 508SD20-0004

DEMO. OF PAVEMENT

FLEXIBLE

SY

2,641.000

0440 510SX20-0039

REMOVE EXIST. (CONDUIT) LF

592.000

0450 510SX20-0040

REMOVE EXIST. OVERHEAD

SIGN STRUCTURE TRAFFIC

EA

3.000

0460 512SD20-0007

IMPACT ATTEN.SER. TY. 1 TL-

3, >=40 MPH

EA

3.000

0470 512SD20-0013

TYPE 3 BARRICADE 8' EA

2.000

0480 512SD20-0014

TEMPORARY SIGN SF

1,950.000

0490 512SD20-0023

TRUCK MOUNTED

ATTENUATOR

HR

4,822.000

0500 512SD20-0024

GROUP 2 CHANNELIZING

DEVICES

DAY

23,824.000

Schedule of Items Page: 6

Proposal ID: C0000119597C01B 0076-964-927, C501

Order No.: A23

Oversight/State Project No.:

Federal Project No.: STP-5A27(864)

Contractor:

0001 REGULAR BID ITEMSSECTION:

Cat Alt Set ID: Cat Alt Mbr ID:

Bid AmountUnit Price Approximate Quantity and

UnitsDescription

Item ID Proposal

Line Number Dollars Cents Dollars Cents

Spec No.

0510 512SD20-0025

PORT.CHANGEABLE MESS.

SIGN

HR

10,110.000

0520 512SD20-0026

ELECTRONIC ARROW BOARD HR

4,294.000

0530 512SD20-0031

TRAFFIC BARRIER SER.

CONC. MB-7D PC

LF

2,329.000

0540 512SD20-0042

ERADICATE LINEAR PVMT

MRKG

LF

48,485.000

0550 512SD20-0044

TEMP. PAVE. MARKER 1 WAY EA

1,282.000

0560 512SD20-0046

TEMP. PVMT MRKG TY. A, 4" LF

10,205.000

0570 512SD20-0048

TEMP. PVMT MRKG TY. A, 8" LF

1,305.000

0580 512SD20-0062

TEMP. PVMT MRKG TY. D, CL.

III, 6"

LF

23,800.000

0590 512SD20-0063

TEMP. PVMT MRKG TY. D, CL.

III, 8"

LF

12,815.000

0600 512SD20-0064

TEMP. PVMT MRKG TY. D, CL.

III, 12"

LF

5,105.000

0610 512SD20-0065

TEMP. PVMT MRKG TY. D, CL.

III, 24"

LF

130.000

0620 513SD20-0001

MOBILIZATION LUMP SUM _________._____LUMP SUM

0630 514SD20-0001

FIELD OFFICE TY.I MO

17.000

Schedule of Items Page: 7

Proposal ID: C0000119597C01B 0076-964-927, C501

Order No.: A23

Oversight/State Project No.:

Federal Project No.: STP-5A27(864)

Contractor:

0001 REGULAR BID ITEMSSECTION:

Cat Alt Set ID: Cat Alt Mbr ID:

Bid AmountUnit Price Approximate Quantity and

UnitsDescription

Item ID Proposal

Line Number Dollars Cents Dollars Cents

Spec No.

0640 515SD20-0004

FLEXIBLE PAVE.PLANING 0"-

2"

SY

8,049.000

0650 517SD20-0001

CONSTRUCTION SURVEYING

CONSTR.

LUMP SUM _________._____LUMP SUM

0660 602SD20-0005

TOPSOIL CLASS B 2" ACRE

0.490

0670 603SD20-0002

TEMPORARY SEED LB

49.000

0680 603SD20-0003

REGULAR SEED LB

70.000

0690 603SD20-0004

OVERSEEDING LB

56.000

0700 603SD20-0005

LEGUME SEED LB

1.000

0710 603SD20-0006

LEGUME OVERSEEDING LB

1.000

0720 603SD20-0014

FERTILIZER NITROGEN - N LB

47.000

0730 603SD20-0015

FERTILIZER PHOSPHOROUS

- P

LB

64.000

0740 603SD20-0016

FERTILIZER POTASSIUM - K LB

32.000

0750 603SD20-0017

LIME TON

2.200

0760 606SD20-0005

ROLLED EROSION CTRL

PRODUCT EC-3 TYPE 1

SY

242.000

Schedule of Items Page: 8

Proposal ID: C0000119597C01B 0076-964-927, C501

Order No.: A23

Oversight/State Project No.:

Federal Project No.: STP-5A27(864)

Contractor:

0001 REGULAR BID ITEMSSECTION:

Cat Alt Set ID: Cat Alt Mbr ID:

Bid AmountUnit Price Approximate Quantity and

UnitsDescription

Item ID Proposal

Line Number Dollars Cents Dollars Cents

Spec No.

0770 700SD20-0003

REMOVE EXISTING 1 POST

SIGN STRUCTURE

EA

10.000

0780 700SD20-0035

SIGN POST STP-1, 2 3/16", 10

GAUGE

LF

12.000

0790 700SD20-0036

SIGN POST STP-1, 2 1/2", 10

GAUGE

LF

60.000

0800 700SD20-0037

SIGN POST STP-1, 2 1/2", 12

GAUGE

LF

15.000

0810 700SD20-0038

CONC. FOUND. STP-1, TY. A EA

1.000

0820 700SD20-0039

CONC. FOUND. STP-1, TY. B EA

4.000

0830 700SD20-0056

CONC. FOUND. O/H SIGN

STRUCTURE

CY

165.000

0840 700SD20-0174

ELECTRICAL SERVICE WORK

PAD

EA

2.000

0850 700SD20-0199

TEST BORE EA

6.000

0860 700SX20-0002

SIGN STRUCTURE,

OVERHEAD SPAN 133 FT

EA

1.000

0870 700SX20-0002

SIGN STRUCTURE,

OVERHEAD SPAN 74 FT

EA

1.000

0880 700SX20-0002

SIGN STRUCTURE,

OVERHEAD SPAN 86 FT

EA

1.000

Schedule of Items Page: 9

Proposal ID: C0000119597C01B 0076-964-927, C501

Order No.: A23

Oversight/State Project No.:

Federal Project No.: STP-5A27(864)

Contractor:

0001 REGULAR BID ITEMSSECTION:

Cat Alt Set ID: Cat Alt Mbr ID:

Bid AmountUnit Price Approximate Quantity and

UnitsDescription

Item ID Proposal

Line Number Dollars Cents Dollars Cents

Spec No.

0890 700SX20-0021

TRAFFIC SIGN SOLAR

POWERED FLASHING

BEACON WARNING SYSTEM

EA

2.000

ATTD

0900 700SX20-0021

TRAFFIC SIGN SOLAR

POWERED SEQUENTIAL

DYNAMIC CURVE WARNING

SYSTEM (CHEVRON)

EA

4.000

ATTD

0910 701SD20-0001

SIGN PANEL SF

2,000.000

0920 704SD20-0027

TYPE B CLASS VI PVMT LINE

MRKG 6"

LF

10,205.000

0930 704SD20-0029

TYPE B CLASS VI PVMT LINE

MRKG 12"

LF

1,305.000

0940 704SD20-0031

TYPE B CLASS VI CONTRAST

PVMT LINE MRKG 6"

LF

565.000

0950 704SD20-0032

INLAID PAVEMENT MARKER

ASPHALT

EA

147.000

ATTD

0960 704SX20-0001

PAVEMENT MARKING TYPE B

CLASS VI PVMT LINE MRKG

24"

LF

54.000

0970 705SX20-0002

LIGHTING #2 IN LINE SPLICES EA

12.000

ATTD

0980 705SX20-0002

LIGHTING TAPE AND LABELS EA

36.000

ATTD

Section: 0001 _________._____Total:

Total Bid: _________._____

Virginia Department of Transportation 08/10/2026Date Printed:

Page

Bid Items Eligible For Fuel Adjustment

C0000119597C01B

A23

Contract ID:

Order No.:

Instructions: This form shall be completed in accordance with the Special Provision for Optional Adjustment for Fuel. If you choose to have Fuel Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.

FORM C-21B

Rev 12-21-05

0001 REGULAR BID ITEMSSECTION:

ltem Description Fuel Factor gal/unit Option Item

Number

_______REGULAR EXCAVATION 0.290303SD20-0001

_______BORROW EXCAVATION 0.290303SD20-0007

_______SILTATION CONTROL EXCAVATION 0.290303SD20-0029

_______AGGR. BASE MATL. TY. I NO. 21B 0.600308SD20-0012

_______ASPHALT CONCRETE TY. SM-12.5A CONST 3.500315SD20-0001

_______ASPHALT CONCRETE TY. IM-19.0D CONST 3.500315SD20-0005

_______ASPHALT CONCRETE TY. SM-9.5E CONST 3.500315SD20-0009

_______ASPHALT CONCRETE TY. BM-25.0D CONST 3.500315SD20-0011

_______ASPHALT CONCRETE -ASPHALT CONCRETE TY. BM-

25.0A CONST

3.500315SX20-0007

_______EROSION CTRL. STONE CL. A1, EC-1 0.600414SD20-0001

_______DRY RIPRAP CL.I 26" 0.400414SD20-0012

_______CONCRETE CLASS A3 MISC. 1.892504SD20-0001

_______DEMO. OF PAVEMENT RIGID 0.200508SD20-0003

_______DEMO. OF PAVEMENT FLEXIBLE 0.200508SD20-0004

_______FLEXIBLE PAVE.PLANING 0"-2" 0.071515SD20-0004

Date:

Signature:

(Firm or Corporation)

(Vendor No.)

Bid Items Eligible For Steel Price Adjustment

C0000119597C01B

A23

Contract ID:

Order No.:

Instructions: This form shall be completed in accordance with the Special Provision. If you choose to have Steel Price Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.

Rev 12-21-08

FORM C-21C

0001 REGULAR BID ITEMSSECTION:

ltem Description Option Item

Number

_______GUARDRAIL GR-MGS1, 9' POST505SD20-0013

_______GUARDRAIL TERMINAL GR-MGS2505SD20-0017

_______GUARDRAIL END ANCHORAGE GR-MGS3505SD20-0018

_______GUARDRAIL HEIGHT TRANSITION GR-MGS4505SD20-0019

_______SIGN POST STP-1, 2 3/16", 10 GAUGE700SD20-0035

_______SIGN POST STP-1, 2 1/2", 10 GAUGE700SD20-0036

_______SIGN POST STP-1, 2 1/2", 12 GAUGE700SD20-0037

_______TRAFFIC SIGN SOLAR POWERED FLASHING BEACON

WARNING SYSTEM

700SX20-0021

_______TRAFFIC SIGN SOLAR POWERED SEQUENTIAL DYNAMIC

CURVE WARNING SYSTEM (CHEVRON)

700SX20-0021

Date:

Signature:

(Firm or Corporation)

(Vendor No.)

Bid Items Eligible For Asphalt Adjustment within this Project

C0000119597C01B

A23

Contract ID:

Order No.:

0001 REGULAR BID ITEMSSECTION:

ltem Description Item

Number

ASPHALT CONCRETE TY. SM-12.5A CONST315SD20-0001

ASPHALT CONCRETE TY. IM-19.0D CONST315SD20-0005

ASPHALT CONCRETE TY. SM-9.5E CONST315SD20-0009

ASPHALT CONCRETE TY. BM-25.0D CONST315SD20-0011

LIQUID ASPHALT COATING (RUMBLE STRIP)315SD20-0016

ASPH.CONC.CURB BACKUP MATL. CONST315SD20-0018

ASPHALT CONCRETE -ASPHALT CONCRETE TY. BM-25.0A CONST315SX20-0007

Determination of Major Items

1C0000119597C01BContract ID:

ltem Description Item

Number

CONC. FOUND. O/H SIGN STRUCTURE700SD20-0056

REGULAR EXCAVATION303SD20-0001

SIGN STRUCTURE, OVERHEAD SPAN 133 FT700SX20-0002

ASPHALT CONCRETE TY. SM-9.5E CONST315SD20-0009

COMMONWEALTH OF VIRGINIA

DEPARTMENT OF TRANSPORTATION

Form C-110 Rev. 07-31-24

DBE REGULAR DEALER/DISTRIBUTOR AFFIRMATION FORM

Bidder / Contractor Name:

Project No. 0076-964-927, C501

FHWA No.: STP-5A27(864)

Contract ID: C0000119597C01B

Date Submitted:

*** INSTRUCTIONS ***

Submit this DBE Regular Dealer / Distributor Affirmation Form for each DBE listed as a regular dealer or distributor, on the Bidder’s Form C-111 within 5 days after the bid opening, along with Form C-112 - Certification of Binding Agreement. In the questions below, “you and “your” refer to the DBE.

Section 26.53(c)(1) of Title 49 Code of Federal Regulations requires the Virginia Department of Transportation to make a preliminary counting determination for each DBE listed as a regular dealer or distributor to assess its eligibility for 60 or 40 percent credit, respectively, of the cost of materials and supplies based on its demonstrated capacity and intent to perform as a regular dealer or distributor, as defined in 49 CFR § 26.55(e)(2)(iv)(A),(B),(C), and (3) under the contract at issue. The preliminary determination will be based on the DBE’s written responses to relevant questions and its affirmation that its subsequent performance of a commercially useful function will be consistent with the preliminary counting of such participation.

DBE Name:

DBE Authorized Representative:

Total Amount of DBE Subcontract / Purchase Order:

NAICS Codes Applicable to Items Sold / Leased:

1. Will all items sold or leased be provided from the on-hand inventory at your establishment?

☐ YES (If "YES," you have indicated that your performance will satisfy the regular dealer requirements and may be counted at 60%. STOP here. Read and sign the affirmation below.)

☐ NO (If "NO" Continue.)

(a) Are you selling bulk items (e.g., petroleum products, steel, concrete, concrete products, sand, gravel, asphalt, etc.) or items not typically stocked due to their unique characteristics (aka specialty items)?

☐ YES (If "YES," Go to Question 2.)

☐ NO (If "NO" Continue.)

(b) Will at least 51% of the items you are selling be provided from the inventory maintained at your establishment, and will the minor quantities of items delivered from and by other sources be of the general character as those provided from your inventory?

☐ YES (If "YES," you have indicated that your performance will satisfy the regular dealer requirements and may be counted at 60%. STOP here. Read and sign the affirmation below.

☐ NO * (*If 1,1(a), and 1(b) above are "NO," your performance on the whole will not satisfy the regular dealer requirements; therefore, only the value of items to be sold or leased from inventory can be counted at 60%. Go to Question 3, below, to determine if the items delivered from and by other sources are eligible for Distributor credit.)

Form C-110 Rev. 07-31-24

2. Will you deliver all bulk or specialty items using distribution equipment you own (or under a long-term lease) and operate?

☐ YES (If "YES," you have indicated that your performance will satisfy the requirements for a regular dealer of bulk items and may be counted at 60%. STOP here. Read and sign the affirmation below.)

☐ NO (If "NO," your performance will not satisfy the requirements for a regular dealer of bulk items; the value of items to be sold or leased cannot be counted at 60%. Go to Question 3.)

3. Will the written terms of your purchase order or bill of lading from a third party transfer responsibility, including risk for loss or damage, to your company at the point of origin (e.g. a manufacture's facility)?

☐ YES ☐ NO

(a) Will you be using sources other than the manufacturer (or other seller) to deliver or arrange delivery of the items sold or leased?

☐ YES ☐NO

(If you responded "YES" to both 3 and 3(a), you have indicated that your performance will satisfy the requirements of a Distributor; therefore, the value of items sold or leased may be counted at 40%.)

(If you responded "NO" to either 3 or 3(a), your performance will not satisfy the requirements for a regular dealer and counting of your participation is limited to the reasonable cost of fees or commissions charged, including transportation charges for the delivery of materials or supplies;

the cost of materials or supplies may not be counted.)

For DBE:

I affirm that the information that I provided above is true and correct and that my company's subsequent performance of a commercially useful function will be consistent with the above responses. I further affirm that my company will independently negotiate price, order specified quantities, and pay for the items listed in the Bidder's Forms C-111 and C-112. This includes my company's responsibility for the quality of such items in terms of necessary repairs, exchanges, or processing of any warranty claims for damaged or defective materials.

Printed Name of DBE Owner/Authorized Representative Signature

For Bidder:

The Bidder acknowledges its responsibility for verifying the information provided by the DBE named above and ensuring that the counting of the DBE's participation is accurate. Any shortfall in DBE participation caused by errors in counting are the responsibility of the Bidder.

Printed Name of Bidder Owner/Authorized Representative Signature

Form C-111

MINIMUM DBE REQUIREMENTS

PROJECT NO. 0076-964-927, C501 CONTRACT ID. NO. C0000119597C01B

FHWA NO. STP-5A27(864) ORDER NO. A23

* * * I N S T R U C T I O N S * * *

LIST THE DBE(S) WHO WILL PARTICIPATE IN THE CONTRACT, INDICATE THE WORK THEY WILL PERFORM, THEIR VENDOR ID AND DBE CERTIFICATION NUMBERS, AND THE DOLLAR AMOUNT OF PARTICIPATION, REDUCED AS NEEDED FOR REGULAR DEALERS (60%), DISTRIBUTORS (40%), AND BROKERS (FEES/COMMISSIONS). COUNT 100% FOR SUBCONTRACTORS AND MANUFACTURERS, AND FOR HAULERS THAT DELIVER MATERIALS AND SUPPLIES TO THE PROJECT SITE (EXCLUDING COST

OF THE MATERIALS AND SUPPLIES.

0 % X $ = $

DBE GOAL

TOTAL CONTRACT VALUE

MINIMUM DBE PARTICIPATION

DBE SUMMARY

DBE PARTICIPATION ATTAINED TOTAL: $__________

DBE PARTICIPATION ATTAINED PERCENTAGE: ___________%

I/WE CERTIFY THAT THE LISTED DBES WILL BE USED ON THIS CONTRACT AS STATED HEREIN AND THAT IN THE PERFORMANCE OF THE CONTRACT I/WE WILL MAKE GOOD FAITH EFFORTS TO MEET OR EXCEED THE

DBE GOAL ESTABLISHED FOR THE CONTRACT.

BY:

BIDDER'S NAME

SIGNATURE

DATE

Title:

NAME OF DBE

SUBCONTRACTOR

VENDOR

ID NO.

DBE

CERTIFICATION

NO.

SUBCONTRACT

VALUE

DBE USED AS

DOLLAR AMT

DBE CREDIT

SUBCONTR. (S)

MNFR. (M)

HAULER (H)

REG. DLR. (R)

DISTR. (D)

BROKER (B)

100%

100%

100%

60%

40%

Fees/Com

Form C-111

DBE ITEMS ENTRY

Instructions: For each DBE listed in the Summary on page 1, complete a DBE Item Entry form.

NOTE: To count toward the DBE goal, DBEs must be certified in NAICS codes applicable to kind of work they perform. A DBE's Certification number and NAICS Codes are shown in the DBE's listing in the DSBD DBE Directory at: https://directory.sbsd.virginia.gov/#/executiveExport

Full DBE Name: ______________________________________________

DBE Vendor ID No.: ___________ (DBE's number can be found on VDOT's List of Prequalified Vendors)

DBE Certification. No.: ____________________

DBE NAICS Code(s): _____________________________________________________________________

DBE Used As:

_______ Subcontractor (S) Eligible for 100% of Subcontract Value

_______ Manufacturer (M) Eligible for 100% of Subcontract Value

_______ Hauler (H) Eligible for 100% of Subcontract Value Excluding Materials

________ Regular Dealer (R) Eligible for 60%of Subcontract or PO Value

________ Distributor (D) Eligible for 40% of Subcontract or PO Value

________ Broker (B) Eligible for Fees / Commissions Only

WORK ASSIGNED TO DBE

Contract Bid Items Description Of Work QTY Unit DBE's Price Applicable

Dollar Amt

DBE Credit

DBE Credit Total: $ _______________________

BY:

BIDDER'S NAME

SIGNATURE

DATE

Title:

[ATTACH ADDITIONAL SHEETS AS NECESSARY, EACH OF WHICH MUST BE SIGNED AND DATED.]

https://directory.sbsd.virginia.gov/#/executiveExport

Form C-112 Rev. 3-1-11

CERTIFICATION OF BINDING AGREEMENT WITH

DISADVANTAGED BUSINESS ENTERPRISE FIRMS

FHWA NUMBER: STP-5A27(864)

This form is to be submitted in accordance with the Department’s Special Provision for Section 107.15.

It is hereby certified by the below signed Contractors that there exists a written quote, acceptable to the parties involved preliminary to a binding subcontract agreement stating the details concerning the work to be performed and the price which will be paid for the aforementioned work. This document is not intended to, nor should it be construed to, contain the entire text of the agreement between the contracting parties.

This document does not take the place of, nor may it be substituted for, an official subcontracting agreement in those situations that may require such an agreement. A copy of the fully executed subcontract agreement shall be submitted to the Engineer within fourteen (14) working days after contract execution.

It is further certified that the aforementioned mutually acceptable quote and fully executed subcontract agreement represent the entire agreement between the two parties involved and that no conversations, verbal agreements, or other forms of non-written representations shall serve to add to, delete, or modify the terms as stated.

The prime Contractor further represents that the aforementioned mutually acceptable quote and fully executed subcontract agreement shall remain on file for a period of not less than one year following completion of the prime's contract with the Department or for such longer period as provisions of governing Federal or State law or regulations may require. For purposes of this form, the term Prime Contractor shall refer to any Contractor utilizing a DBE subcontractor, regardless of tier, in which they are claiming DBE credit toward the contract goal.

Contractors further jointly and severally represent that said binding agreement is for the performance of a "commercially useful function" as that term is employed in 49 C.F.R. Part 26.55 (c), (d).

TO BE SIGNED BY THE SUBCONTRACTOR TO THE PRIME CONTRACTOR, AND ANY LOWER TIER

SUBCONTRACTORS HAVING A CONTRACT WITH THE BELOW NAMED DBE FIRM

Prime Contractor:

By:

Signature Title

Date:

Form C-112 Rev. 3-1-11

First Tier Subcontractor If Applicable:

Second Tier

If Applicable:

Third Tier

If Applicable

DBE Contractor

FORMS and SCHEDULE OF ITEMS PRECEDE SPCNs, SPs and SUPPLEMENTAL SPECS.

CN100-000026-09 GEN. PROJ. REQUIRE., SSS/SPS/SPCNS 12-11-25 (SPCN) 1

CN103-000100-01 SEC 103.02—AWARD OF CONTRACT 6-17-25 (SPCN) 1

CN105-000140-00 SEC 105.14—MAINTENANCE DURING CONSTRUCTION 12-20-24 (SPCN) 1

CN105-000150-00 SECURITY REQUIREMENTS FOR PCMS 1-30-26 (SPCN) 2

CN221-000100-00 SEC 221.02—DETAIL REQUIREMENTS 1-15-25 (SPCN) 3

CN245-000100-01 SEC 245.03—TESTING & DOCUMENTATION 1-10-24 (SPCN) 3

CN512-000120-00 SEC 512—MAINTAINING TRAFFIC (IMPACT ATTEN. SER.) 7-13-16 (SPCN) 5

CN512-000310-00 POLICE PATROLS R-7-12-16 (SPCN) 5

CN704-000200-00 INLAID PAVE. MARKER LOC. AND SPACING 8-11-21 (SPCN) 5

CQ107-000130-00 DRUG-FREE WORKPLACE 7-3-19 (SPCN) 5

CQ107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY 5-11-22 (SPCN) 6

CQ512-000321-00 CONTRACTOR MAINT. OF TEMP. MARKINGS 6-13-17 (SPCN) 7

ASPHALT CONCRETE TY. BM-25.0A 1/11/26(SPCN) 7

LIGHTING #2 IN LINE SPLICES 1/11/26(SPCN) 7

LIGHTING TAPE AND LABELS 1/11/26(SPCN) 7

NS DRAINAGE (LEVEL SPREADER 6”X6” WOOD POST) 2/11/26(SPCN) 8

SP0F0-000100-00 PREDETERMINED MIN. WAGE RATES R-7-12-16 9

SP0F0-000130-03 FHWA 1273—CONTRACT PROVISIONS, FED-AID 7-9-26 14

SP0F0-000150-01 AFFIRMATIVE ACTION / EEO NOTICE 7-17-17 37

SP102-000120-00 NON-DISCRIMIN. EMPLOY. & CONTRACT. PRACTICES (EO-61) 1-10-17 43

SP107-000110-00 C-45–SWPPP GEN. PERMIT–CONTRACTOR CERTIFICATION R-10-27-16 44

*SP107-000120-00 ELEC. SUBMISSION OF DBE AND PAYROLLS 1-21/20 45

SP107-001510-06 INTERIM DBE REQUIREMENTS 1-26-26 47

SP107-003100-00 MADE IN THE USA REQUIREMENTS 10-03-25 51

SP108-000100-01 PROG. SCHED. FOR CAT. I PROJECTS 3-21-22 58

*SP109-000100-05 ASPHALT MATERIAL PRICE ADJUSTMENT 7-8-24 73

SP109-000110-00 OPTIONAL ADJUSTMENT FOR FUEL R-7-12-16 75

SP109-000120-01* PRICE ADJUSTMENT FOR STEEL 7-2-19 77

SP109-000130-01 ELECTRONIC OR PRINTED WEIGH TICKETS 3-10-25 82

SP515-000100-00 COLD PLANE (MILL) ASPHALT CONC. OPERATIONS 7-12-16 88

SP700-000180-03 MODIFICATIONS TO AASHTO’S SIGN STRUCT. SPEC. 9-29-20 93

*SP704-000120-00 INLAID PAVEMENT MARKERS 8-26-19 98

SP801-000100-01 LANE CLOSE COORD (LCC)/LANE CLOSE IMPLEMENT (LCI) 9-20-17 101

SQ105-000611-01 SEC 105.06 — SUBCONTRACTING (FED FUNDED PROJECTS) 2-9-17 (SP) 103

SQ107-001300-00 PREVAILING WAGE RATES 10-12-2023 104

SS109-002020-01 SEC 109 — MEASUREMENT AND PAYMENT 5-1-23 108

SS211-002020-03 SEC 211 – ASPHALT CONCRETE 3-18-24 111

SS220-002020-01 SEC 220 – CONCRETE CURING MATERIALS 8-28-20 116

SS223-002020-02 SEC 223 – STEEL REINFORCEMENT 4-4-23 117

SS234-002020-01 SEC 234 – GLASS BEADS AND RETROREFLECTIVE OPTICS 5-6-22 118

SS235-002020-01 SEC 235 – RETROREFLECTORS 5-6-22 119

SS236-002020-01 SEC 236 – WOOD PRODUCTS 5-14-21 120

SS246-002020-02 SEC 246 – PAVEMENT MARKING 5-6-22 124

SS248-002020-02 SEC 248 – STONE MATRIX ASPHALT CONCRETE 3-18-24 132

SS305-002020-02 SEC 305 – SUBGRADE AND SHOULDERS 12-20-23 134

SS308-002020-01 SEC 308 - SUBBASE COURSE 7-13-21 136

SS309-002020-01 SEC 309 - AGGREGATE BASE COURSE 7-13-21 137

SS315-002020-05 SEC 315 – ASPHALT CONCRETE PLACEMENT 5-27-25 138

SS317-002020-01 SEC 317— STONE MATRIX ASPHALT CONCRETE PLACEMENT 6-21-24 157

SS318-002020-01 SEC 318 — PAVEMENT INTERLAYERS 8-2-23 159

TABLE OF CONTENTS FOR PROVISIONS

SS319-002020-02 SEC 319 – THIN HOT MIX ASPHALT CONCRETE OVERLAY 3-18-24 160

SS321-002020-02 SEC 321 – TRENCH WIDENING 5-4-23 164

SS407-002020-02 SEC 407 – STEEL & METAL STRUCT 11-01-22 166

SS411-002020-01 SEC 411 – PROT. COAT. OF METAL 11-01-22 168

SS512-002020-03 SEC 512 – MAINTAINING TRAFFIC 7-1-22 169

SS704-002020-02 SEC 704 – PAVEMENT MARKINGS AND MARKERS 5-6-22 182

TREE REMOVAL TIME OF YEAR RESTRICTION 1/15/26 188

SECTION 108.02 LIMITATION OF OPERATIONS 12/24/25 189

SOLAR POWERED FLASHING BEACON WARNING SYSTEM 8/11/25 194

SOLAR POWERED SEQUENTIAL DYNAMIC CURVE WARNING SYSTEM 8/11/25 201

cn100-000026-09 December 11, 2025 (SPCN)

GENERAL PROJECT REQUIREMENTS, SUPPLEMENTAL SPECIFICATIONS (SSs), SPECIAL PROVISIONS (SPs) AND SPECIAL PROVISION COPIED NOTES (SPCNs)

This project shall be constructed according to: the Plans; the Virginia Department of Transportation Road and Bridge Specifications, dated 2020 and the Supplement thereto, dated 2022; the Virginia Department of Transportation Road and Bridge Standards, dated 2016, with revisions issued online as of the advertisement date for this project incorporated; the Virginia Work Area Protection Manual, version 11.0;

the Virginia MUTCD version 11.0; and the Supplemental Specifications, Special Provisions and Special Provision Copied Notes in this Contract. The status in the Contract of each of these documents will be according to Section 105.12 of the Specifications.

Special Provision Copied Notes in this Contract are designated with “(SPCN)” after the date.

The information at the top and left of each Special Provision Copied Note in this Contract is file reference information for Department use only. The information in the upper left corner above the title of each Supplemental Specification and Special Provision in this Contract is file reference information for Department use only.

cn103-000100-01 June 17, 2025 (SPCN)

SECTION 103.02—AWARD OF CONTRACT of the Specifications is replaced in its entirety with the following:

103.02 – Award of Contract

The Board, or the Commissioner as authorized under § 33.2-209 of the Code of Virginia, will award the Contract to the lowest responsive and responsible bidder without discrimination on the grounds of race, color, gender, national origin, status as a military family, or other basis prohibited by law. In the event of a tie bid, the tie will be decided by lot.

The award date will not be later than midnight on the 60th day after the opening of bids. If the Board, or the Commissioner where authorized by law, has not awarded the Contract within this period due to any circumstances not attributable to the bidder, the bidder may withdraw his bid without penalty or prejudice unless the time limit is extended by mutual consent.

After approval for the award of contracts, the Department will provide written notice of award to the successful bidder and will post the Ballots on the Department’s bidding webpage. The Ballot serves as public Notice of Award for a contract. The date of the Notice of Award is the “Approved” date appearing at the top of the Ballot that lists the Contract.

cn105-000140-00 December 20, 2024 (SPCN)

SECTION 105.14—MAINTENANCE DURING CONSTRUCTION of the Specifications is amended by the following:

Section 105.14(a)3 – Flagging Traffic is replaced with the following:

3. Flagging Traffic: Flaggers shall be able to communicate to the traveling public in English while performing the job duty as a flagger at the flagger station.

All flaggers shall possess a valid, current flagger certification card, be it a physical or electronic card, at all times while performing flagging duties.

Flaggers shall be certified by the VDOT Basic or Intermediate Work Zone Traffic Control Training course or by the ATSSA’s classroom Flagger Certification Program.

The following constitutes a valid flagger certification card:

• Cards issued by VDOT following completion of the Basic Work Zone course;

• Cards issued by VDOT following completion of the Intermediate Work Zone course;

• Cards issued by ATSSA following completion of a Flagger course;

• Cards issued by VDOT following completion of the Flagger-only course, provided the cards were issued on or before December 31, 2024, and have not yet reached the expiration date

(two years after date of issuance).

Flaggers who fail to possess a valid, current, flagger certification card, or refuse to allow inspection of same upon request, shall be removed from the flagging site, and operations requiring flagging shall be suspended by the Engineer. Suspended operations requiring flagging may resume once a certified flagger arrives on-site to perform flagging duties in accordance with applicable requirements. Flaggers improperly performing duties may be subject to flagger certification revocation at the sole discretion of the Engineer.

cn105-000150-00 January 30, 2026 (SPCN)

SECURITY REQUIREMENTS FOR PORTABLE CHANGEABLE MESSAGE SIGNS — The Contractor shall secure portable changeable message sign (PCMS) control cabinets with a grade 3 or stronger standard lock at all times unless maintenance is actively being conducted on the sign.

A password shall be required to change the PCMS message. The Contractor shall change the manufacturer's default password for ALL electronic signs. Electronic signs that support the use of complex passwords shall include at least 14 characters consisting of the following criteria:

• At least one special character

• At least one alphabetical character

• At least one numerical character

• A combination of upper-case and lower-case letters

Electronic signs that do not support the use of complex passwords shall be changed using the maximum number of characters and character types permitted by the manufacturer.

Password credentials are prohibited from being stored, displayed, or written on or within the sign. Any QR codes affixed to the sign shall be removed.

For all PCMS with remote or wireless accessibility, the Engineer will authorize remote access prior to this functionality being enabled. Prior to authorization, the Contractor shall update the PCMS to the most recent compatible software and firmware version available from the manufacturer. Following authorization and prior to use, the Contractor shall establish a remote connection to verify that access to the PCMS is password protected.

Electronic signs shall only post approved and documented messages. The Contractor shall log all messages posted with date and times for each public message.

The Contractor has the option for their signs to be connected to the Department’s Operations Technology (OT) network for management by Traffic Operations Center (TOC) staff. By using this method, messages are transmitted and posted by the TOC control room staff with all records and logging managed within the VDOT Advanced Traffic Management System (ATMS). Electronic message signs connected to the OT network shall follow the security requirements described below:

1. All electronic signs connected to the network shall be secured with a digital lock installed on the sign control cabinet.

2. Connected signs shall only be remotely accessible through secure communications that originated from the Department’s OT network.

3. Connected signs shall only be posted with messages from the Department’s ATMS systems or designated backup systems.

4. Community strings (both public and private strings) shall be changed from default settings.

5. All vendor cloud connections shall be removed from the connected sign. TOC system administration staff will configure VPN connections exclusively to the Department’s OT network.

6. All connected electronic signs shall adhere to the Cabinet Security Standards found in the

Department’s OT Cybersecurity Program Manual.

cn221-000100-00 January 15, 2025 (SPCN)

SECTION 221.02—DETAIL REQUIREMENTS of the Specifications is amended by replacing the first paragraph with the following:

Guardrail shall consist of rail or cable elements and fastenings fabricated to develop continuous beam or cable strength when installed. Guardrail materials shall conform to AASHTO M180-18 and M30 specification requirements supplied by manufacturers included on the Department’s Approved List 12.

cn245-000100-01 January 10, 2024 (SPCN)

SECTION 245.03—TESTING AND DOCUMENTATION of the Specifications is amended by the following:

Section 245.03(e) – Prefabricated Geocomposite Pavement Underdrain is replaced by the following:

Prefabricated Geocomposite Pavement Underdrain: Prefabricated geocomposite pavement underdrain shall consist of a polymeric drainage core allowing water inflow from both sides, encased in a nonwoven filter fabric envelope having sufficient flexibility to withstand bending and handling without damage.

Prefabricated geocomposite pavement underdrain shall conform to the following:

1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the pavement environment and shall have a thickness of not less than 3/4 inch. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.

Physical Properties Test Method Requirements

Compressive strength ASTM D1621, D2412, and

D6364

Min. 40 psi at 20% max.

deflection immediately after

24 hrs of specimen conditioning at 0 deg F and at

125 deg F https://covgov.sharepoint.com/:w:/r/sites/TM-VDOT-SC-Specifications-External/_layouts/15/Doc.aspx?sourcedoc=%7BF1622882-4C64-446A-AE11-E07A4F78D1F2%7D&file=cn221-000100-00.docx&action=default&mobileredirect=true

Physical Properties Test Method Requirements

Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 0.1)

ASTM D4716 Min. 15 gal/min/ft width for

12-in specimen length

2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over both sides of the core. Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of Section 245.03(c) of the Specifications.

Section 245.03(f) – Geocomposite Wall Drains is replaced by the following:

Geocomposite Wall Drains: Prefabricated geocomposite wall drain shall consist of a polymeric drainage core with a nonwoven filter fabric (single sided or double sided) having sufficient flexibility to withstand bending and handling without damage. Geocomposite wall drains shall conform to the following:

1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the roadway. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.

Physical Property Test Method Requirements

Compressive strength ASTM D1621, D2412, and D6364

Min. 40 psi at 20% max.

deflection immediately after 24 hrs of specimen conditioning at 0 degree F and at 125 degree F

Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 1.0)

ASTM D4716 Min. 15 gal/min/ft width (for 12-in specimen length)

2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over the core. Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of Section 245.03(c) of the Specifications.

Section 245.03(g) – Geomembrane Moisture Barrier is replaced by the following:

Geomembrane Moisture Barrier: Geomembrane moisture barrier shall be resistant to biological attack.

Geomembrane shall be constructed of PVC and shall conform to the requirements of ASTM D7176 for PVC 30 or higher grades. In addition, geomembrane shall comply with the requirements of ASTM D7408 for bond seam strength and peel strength.

cn512-000120-00 July 13, 2016 (SPCN)

SECTION 512—MAINTAINING TRAFFIC of the Specifications is amended as follows:

Section 512.03(i)—Impact Attenuator Service is amended to replace the second paragraph with the following:

Only Type 1 re-directive low-maintenance impact attenuators in accordance with Section 505 shall be used on highways with posted speed limits greater than 50 mph or with an ADT greater than 25,000 vehicles per day.

cn512-000310-00 July 12, 2016 (SPCN)

POLICE PATROLS — The Contractor is advised that the Department will use Police patrols in construction work zones when traffic flow problems are anticipated, to enhance the safety of both the public and construction personnel, during the life of this contract.

cn704-000200-00 August 11, 2021 (SPCN)

INLAID PAVEMENT MARKER LOCATION AND SPACING — The Contractor shall not install markers on existing bridge decks Inlaid Pavement Markers shall be installed on new bridge decks where required by the Plans. Inlaid Pavement Markers shall be placed in relation to pavement joints and cracks as follows:

• In existing Asphalt Concrete pavement, new or existing Hydraulic Cement Concrete pavement, and bridge decks, the edge of the groove shall be at least 2 inches from pavement joints and cracks, ensuring that the finished line of markers is straight in accordance with the tolerance for pavement markings specified in Section 704.03 of the Specifications. Offset from the longitudinal joint shall take precedence over straightness of the line of markers.

• In new Hydraulic Cement Concrete pavement or when installed in conjunction with new latex modified microsurfacing or slurry seal treatments, the edge of the groove shall be 2 inches minimum from the surface course pavement joint and 1 inch maximum off alignment from the corresponding pavement marking line. The finished line of markers shall be straight in accordance with the tolerance for pavement markings specified in Section 704.03 of the Specifications. Straightness of the line of markers and alignment with the corresponding pavement marking line takes precedence over offset from the surface course joint.

CQ107-000130-00 July 3, 2019 (SPCN)

DRUG-FREE WORKPLACE – The Contractor shall:

• Provide a Drug-Free Workplace for the Contractor’s employees.

• Post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the Contractor’s workplace and specifying the actions that will be taken against employees for violations of such prohibition.

https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn512-000120-00.docx https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn512-000310-00.docx https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2020_Standard_Specifications/cn704-000200-00.docx

• State in all solicitations or advertisements for employees placed by or on behalf of the Contractor that the Contractor maintains a Drug-Free Workplace.

• Include the provisions of the foregoing clauses in every Subcontract or purchase order of over…