A22 - Misc Jordan 2020 GroundsBidSheet FINALJan13.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- Grounds Maintenance Service for Piedmont Federal contract opportunity
- Solicitation number
- W912PM20T0022
About this file
This combined synopsis and solicitation document requests quotes for grounds maintenance services at two U.S. Army Corps of Engineers sites in North Carolina. The solicitation seeks maintenance of grounds at Piedmont and Jordan Lake projects and includes mowing, landscaping, mulching, herbicide application, leaf removal, playground upkeep, and snow and ice removal over a five year period from May 2020 to February 2025. Quotes are due by March 30, 2020 at 11:00 AM Eastern and must include both pricing and technical proposals submitted electronically in PDF format. The requirement is set aside for small businesses with a size standard of $8 million. The solicitation will result in a firm-fixed price contract awarded to the responsible offeror with the lowest priced technically acceptable quote.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A22- QA_Rev1_30MAR20.pdf | ||
| A21 - Q and A1.pdf | ||
| A21 - W912PM20T0022 Amendment 1.pdf | ||
| A2 - Maps GROUNDS 2020 EDIT.pdf | ||
| A21 - W912PM20T0022 Final.pdf | ||
| A22 - Misc Falls 2020 GroundsBidSheet FINALJan13.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year GROUNDS BASE YEAR - Jordan
| SERVICE | Frequency | Qty | Unit | Unit Price | Amount |
| Mowing/Weeding/Trimming/Edging | $0.00 | ||||
| Group A: VAC area inside gate | Height Specified | 6 | Months | $0.00 | $0.00 |
| Group B: Poe's Ridge, Dam, Tailrace, Entrance Road Outside Gate | Height Specified | 6 | Months | $0.00 | $0.00 |
| Group C: Downstream & Dam Terminus Slopes, OM Boat Ramp Rd | Height Specified | 6 | Months | $0.00 | $0.00 |
| Group E: Saddle Dikes | Twice per year | 2 | ea | $0.00 | $0.00 |
| Leaf Removal | $0.00 | ||||
| VAC/access road shoulders/walkways | Once per Year in January | 1 | ea | $0.00 | $0.00 |
| Mulch | $0.00 | ||||
| Landscaped Areas as Specified | Once per year | 1 | ea | $0.00 | $0.00 |
| Playground Areas as Specified | Once per Year | 1 | ea | $0.00 | $0.00 |
| Playground mulch turning | Four times per year | 4 | ea | $0.00 | $0.00 |
| Herbicide | $0.00 | ||||
| Recreation Area Spraying | Twice per year | 2 | ea | $0.00 | $0.00 |
| Upstream Slope of Dam | Once per year | 1 | ea | $0.00 | $0.00 |
| Downstream Slope of Dam | Once per year | 1 | ea | $0.00 | $0.00 |
| Rip Rap Along River Channel | Once per year | 1 | ea | $0.00 | $0.00 |
| Rip Rap Along OM Boat Ramp | Once per year | 1 | ea | $0.00 | $0.00 |
| Rip Rap Along Poe's Ridge Boat Ramp | Once per year | 1 | ea | $0.00 | $0.00 |
| Snow and Ice Removal | $0.00 | ||||
| Snow and Ice Removal | Per event | 4 | ea | $0.00 | $0.00 |
| $0.00 |
OY1
GROUNDS OY1 - Jordan
| SERVICE | Frequency | Qty | Unit | Unit Price | Amount |
| Mowing/Weeding/Trimming/Edging | $0.00 | ||||
| Group A: VAC area inside gate | Height Specified | 8 | Months | $0.00 | $0.00 |
| Group B: Poe's Ridge, Dam, Tailrace, Entrance Road Outside Gate | Height Specified | 8 | Months | $0.00 | $0.00 |
| Group C: Downstream & Dam Terminus Slopes, OM Boat Ramp Rd | Height Specified | 8 | Months | $0.00 | $0.00 |
| Group E: Saddle Dikes | Twice per year | 2 | ea | $0.00 | $0.00 |
| Leaf Removal | $0.00 | ||||
| VAC/access road shoulders/walkways | Once per Year in January | 1 | ea | $0.00 | $0.00 |
| Mulch | $0.00 | ||||
| Landscaped Areas as Specified | Once per year | 1 | ea | $0.00 | $0.00 |
| Playground Areas as Specified | Once per Year | 1 | ea | $0.00 | $0.00 |
| Playground mulch turning | Four times per year | 4 | ea | $0.00 | $0.00 |
| Herbicide | $0.00 | ||||
| Recreation Area Spraying | Twice per year | 2 | ea | $0.00 | $0.00 |
| Upstream Slope of Dam | Once per year | 1 | ea | $0.00 | $0.00 |
| Downstream Slope of Dam | Once per year | 1 | ea | $0.00 | $0.00 |
| Rip Rap Along River Channel | Once per year | 1 | ea | $0.00 | $0.00 |
| Rip Rap Along OM Boat Ramp | Once per year | 1 | ea | $0.00 | $0.00 |
| Rip Rap Along Poe's Ridge Boat Ramp | Once per year | 1 | ea | $0.00 | $0.00 |
| Snow and Ice Removal | $0.00 | ||||
| Snow and Ice Removal | Per event | 4 | ea | $0.00 | $0.00 |
| $0.00 |
OY2
GROUNDS OY2 - Jordan
| SERVICE | Frequency | Qty | Unit | Unit Price | Amount |
| Mowing/Weeding/Trimming/Edging | $0.00 | ||||
| Group A: VAC area inside gate | Height Specified | 8 | Months | $0.00 | $0.00 |
| Group B: Poe's Ridge, Dam, Tailrace, Entrance Road Outside Gate | Height Specified | 8 | Months | $0.00 | $0.00 |
| Group C: Downstream & Dam Terminus Slopes, OM Boat Ramp Rd | Height Specified | 8 | Months | $0.00 | $0.00 |
| Group E: Saddle Dikes | Twice per year | 2 | ea | $0.00 | $0.00 |
| Leaf Removal | $0.00 | ||||
| VAC/access road shoulders/walkways | Once per Year in January | 1 | ea | $0.00 | $0.00 |
| Mulch | $0.00 | ||||
| Landscaped Areas as Specified | Once per year | 1 | ea | $0.00 | $0.00 |
| Playground Areas as Specified | Once per Year | 1 | ea | $0.00 | $0.00 |
| Playground mulch turning | Four times per year | 4 | ea | $0.00 | $0.00 |
| Herbicide | $0.00 | ||||
| Recreation Area Spraying | Twice per year | 2 | ea | $0.00 | $0.00 |
| Upstream Slope of Dam | Once per year | 1 | ea | $0.00 | $0.00 |
| Downstream Slope of Dam | Once per year | 1 | ea | $0.00 | $0.00 |
| Rip Rap Along River Channel | Once per year | 1 | ea | $0.00 | $0.00 |
| Rip Rap Along OM Boat Ramp | Once per year | 1 | ea | $0.00 | $0.00 |
| Rip Rap Along Poe's Ridge Boat Ramp | Once per year | 1 | ea | $0.00 | $0.00 |
| Snow and Ice Removal | $0.00 | ||||
| Snow and Ice Removal | Per event | 4 | ea | $0.00 | $0.00 |
| $0.00 |
OY3
GROUNDS OY3 - Jordan
| SERVICE | Frequency | Qty | Unit | Unit Price | Amount |
| Mowing/Weeding/Trimming/Edging | $0.00 | ||||
| Group A: VAC area inside gate | Height Specified | 8 | Months | $0.00 | $0.00 |
| Group B: Poe's Ridge, Dam, Tailrace, Entrance Road Outside Gate | Height Specified | 8 | Months | $0.00 | $0.00 |
| Group C: Downstream & Dam Terminus Slopes, OM Boat Ramp Rd | Height Specified | 8 | Months | $0.00 | $0.00 |
| Group E: Saddle Dikes | Twice per year | 2 | ea | $0.00 | $0.00 |
| Leaf Removal | $0.00 | ||||
| VAC/access road shoulders/walkways | Once per Year in January | 1 | ea | $0.00 | $0.00 |
| Mulch | $0.00 | ||||
| Landscaped Areas as Specified | Once per year | 1 | ea | $0.00 | $0.00 |
| Playground Areas as Specified | Once per Year | 1 | ea | $0.00 | $0.00 |
| Playground mulch turning | Four times per year | 4 | ea | $0.00 | $0.00 |
| Herbicide | $0.00 | ||||
| Recreation Area Spraying | Twice per year | 2 | ea | $0.00 | $0.00 |
| Upstream Slope of Dam | Once per year | 1 | ea | $0.00 | $0.00 |
| Downstream Slope of Dam | Once per year | 1 | ea | $0.00 | $0.00 |
| Rip Rap Along River Channel | Once per year | 1 | ea | $0.00 | $0.00 |
| Rip Rap Along OM Boat Ramp | Once per year | 1 | ea | $0.00 | $0.00 |
| Rip Rap Along Poe's Ridge Boat Ramp | Once per year | 1 | ea | $0.00 | $0.00 |
| Snow and Ice Removal | $0.00 | ||||
| Snow and Ice Removal | Per event | 4 | ea | $0.00 | $0.00 |
| $0.00 |
OY4
GROUNDS OY4 - Jordan
| SERVICE | Frequency | Qty | Unit | Unit Price | Amount |
| Mowing/Weeding/Trimming/Edging | $0.00 | ||||
| Group A: VAC area inside gate | Height Specified | 8 | Months | $0.00 | $0.00 |
| Group B: Poe's Ridge, Dam, Tailrace, Entrance Road Outside Gate | Height Specified | 8 | Months | $0.00 | $0.00 |
| Group C: Downstream & Dam Terminus Slopes, OM Boat Ramp Rd | Height Specified | 8 | Months | $0.00 | $0.00 |
| Group E: Saddle Dikes | Twice per year | 2 | ea | $0.00 | $0.00 |
| Leaf Removal | $0.00 | ||||
| VAC/access road shoulders/walkways | Once per Year in January | 1 | ea | $0.00 | $0.00 |
| Mulch | $0.00 | ||||
| Landscaped Areas as Specified | Once per year | 1 | ea | $0.00 | $0.00 |
| Playground Areas as Specified | Once per Year | 1 | ea | $0.00 | $0.00 |
| Playground mulch turning | Four times per year | 4 | ea | $0.00 | $0.00 |
| Herbicide | $0.00 | ||||
| Recreation Area Spraying | Twice per year | 2 | ea | $0.00 | $0.00 |
| Upstream Slope of Dam | Once per year | 1 | ea | $0.00 | $0.00 |
| Downstream Slope of Dam | Once per year | 1 | ea | $0.00 | $0.00 |
| Rip Rap Along River Channel | Once per year | 1 | ea | $0.00 | $0.00 |
| Rip Rap Along OM Boat Ramp | Once per year | 1 | ea | $0.00 | $0.00 |
| Rip Rap Along Poe's Ridge Boat Ramp | Once per year | 1 | ea | $0.00 | $0.00 |
| Snow and Ice Removal | $0.00 | ||||
| Snow and Ice Removal | Per event | 4 | ea | $0.00 | $0.00 |
| $0.00 |
File details come from the government source that posted it. Updated .