This document is a detailed site plan and technical drawing for a septic system replacement project at CCC Cabin 321 located in Buxton, NC. The plan includes an aerial photo, existing septic system layout, and proposed septic system design for a National Park Service project. Key technical specifications include demolishing the existing 750-gallon septic tank, disconnecting the existing drain line, and installing a new 1000-gallon septic tank with a distribution box. The proposed system will feature two 30-foot trenches with infiltrator chambers, positioned 9 feet on center, and maintained with a minimum 5-foot separation from the slope's edge. Installation notes emphasize proper drainline slope, no horizontal pipe fitting connections, and careful excavation to avoid damaging existing utilities.
The design covers a total new disturbance area of 0 square feet within a 1,430 square foot location, with specific attention to preserving existing infrastructure like the HVAC heat pump and wood shed. The project is part of a federal solicitation (140P5325Q0014) for the National Park Service Cape Hatteras National Seashore, set as a 100% small business procurement with an estimated value between $25,000-$50,000. The period of performance is scheduled from 5/1/2025 to 7/31/2025, with a site visit planned for March 28, 2025, and quotes due by April 10, 2025 at 1 PM EST.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5325Q0014_Amd_0002.pdf | ||
| Sol_140P5325Q0014_Amd_0001.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| sign_in_3-28-25_0001.pdf | ||
| B08_2025_Construction_Clauses_4-1-2025_0001.pdf | ||
| Sol_140P5325Q0014.pdf | ||
| A1_-_REV_1_CAHA_326598A_SOW_Q321_Q323_Septic.doc | DOC document | |
| Construction_Contract_Administration.docx | DOCX document | |
| DOL_Wage_Determination.pdf | ||
| A3_-_CAHA_326598A_SOW_Attch_2_CCC_Cabin_Septic.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
w w w w w w w w w w w w
TC
TC
TC
TC
TC
E
E
E
E
E
E
E
E
E E E
E E
E E
E E
E E
E E
E E
E E
E E
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
S w w w
LOCLOCLOCLOCLOC
LO
C
LO
C
LOC LOC LOC LOC
LOC
S S
S
S S S S S S S S
S S S S S S S S S
S
TC
TC
TC
TC
TC
E
E
E
E
E
E
E
E
E E E
E E
E E
E E
E E
E E
E E
E E
E E
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
OHE
S w w w
LOCLOCLOCLOCLOC
LO
C
LO
C
LOC LOC LOC LOC
LOC
S S
S w w w w w
TC
TC
TC
TC
TC
E
E
E
E
E
E
E
E E E
E E
E E
E E
E E
E E
E E
E E
E
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
OHE
OHE
OHE
OHE
S w w w
LOCLOCLOCLOCLOC
LO
C
LO
C
LOC LOC LOC LOC
LOC
S S
S
DISCONNECT EXISTING
SEPTIC DRAIN LINE
APPROX 7 FT FROM
HOUSE
APPROX TOP OF SLOPE
SCALE:
EXISTING CCC CABIN 321 SEPTIC SYSTEM2 1:100
SCALE:
PROPOSED CCC CABIN 321 SEPTIC SYSTEM3 1:100
SCALE:
AERIAL PHOTO CCC CABINS 321 AND 3231 1:400
EXISTING TREELINE
Q321
DEMO EXISTING
750 GAL SEPTIC
TANK
WOOD SHED TO
REMAIN
EXISTING HVAC
HEAT PUMP TO
REMAIN
12" Ø OAK TO REMAIN. CUT ROOTS
BELOW GROUND WHICH EXTEND
INTO THE NEW DRAINFIELD
PROVIDE 1000 GAL
SEPTIC TANK AND
DISTRIBUTION BOX
CONNECT EX
DRAINLINE TO NEW
SEPTIC TANK
0 10 20 40 60 100
GRAPHIC SCALE
CONC PAD TO
REMAIN
Q321
TELECOMM
PEDESTAL
DEMO EXISTING
DRAINFIELD
3'-0"
30'-0"
PROVIDE TWO 30 FT TRENCHES
AND INFILTRATOR CHAMBERS 3
FT WIDE, 9 FT ON CENTER
DEMOLITION NOTES:
1. PRIOR TO DIGGING, LOCATE EXISTING
UTILITIES IN THE PROJECT AREA.
2. DIG UP AND TURN SOIL IN THE NEW
DRAINFIELD AREAS, REMOVING ALL ROOTS
OR UNSUITABLE SOIL.
3. CAREFULLY EXCAVATE SOIL OR HAND DIG
TO AVOID DAMAGE TO THE EXISTING
ELECTRIC, WATER, SEPTIC, AND
COMMUNICATIONS LINES.
4. DO NOT TRAVERSE OVER UTILITY LINES
WITH HEAVY MACHINERY OR OTHER
VEHICLES WHICH WOULD DAMAGE
EXISTING UTILITY LINES WITHOUT
SPREADER PLATES.
INSTALLATION NOTES:
1. INSTALL NEW SEPTIC DRAINLINES WITH POSITIVE SLOPE
(MINIMUM 18 INCH PER FOOT) TO THE TANK, DISTRIBUTION BOX,
AND DRAINFIELD TRENCHES. DO NOT INSTALL DRAINLINES AT 0
PERCENT OR UPHILL SLOPE. SET TANK, DISTRIBUTION BOX, AND
TRENCHES AT ELEVATION TO ENSURE DOWNHILL SLOPE OF ALL
DRAINLINES.
2. SANITARY TEE CONNECTIONS SHALL NOT BE PERMITTED FOR
HORIZONTAL TO HORIZONTAL PIPE FITTING CONNECTIONS.
3. BACKFILL, RAKE SMOOTH, AND GRADE RUTS, EXCAVATIONS,
AND DISTURBANCE PRIOR TO SEEDING.
TOTAL NEW DISTURBANCE: 0 SF
TOTAL AREA WITHIN LOC: 1,430 SF
10" Ø OAK TO REMAIN. CUT ROOTS
BELOW GROUND WHICH EXTEND INTO
THE NEW DRAINFIELD
UNDERGROUND
ELECTRICAL
OVERHEAD
ELECTRIC
POWER POLE
CUT 36 FT SECTION FROM
EXISTING WALKWAY AND
SET TO THE SIDE
9'-0"
5'-0"
MAINTAIN 5 FT MINIMUM
SEPARATION FROM TOPE OF
SLOPE TO EDGE OF TRENCH
Q323
Q323
GENERATOR SHED
RESET WALKWAY IN PLCE
AFTER DRAINFIELD
INSTALLATION
36'-0"
AutoCAD SHX Text Sheet
AutoCAD SHX Text Scale
AutoCAD SHX Text Project
AutoCAD SHX Text Date
AutoCAD SHX Text Revision/Issue
AutoCAD SHX Text Project Name and Address
AutoCAD SHX Text Firm Name and Address
AutoCAD SHX Text No.
AutoCAD SHX Text Date
AutoCAD SHX Text General Notes
AutoCAD SHX Text
REPLACE SEPTIC SYSTEM
AutoCAD SHX Text
AT CCC CABIN 321
AutoCAD SHX Text
46020 CABIN RD
AutoCAD SHX Text
BUXTON, NC 27920
AutoCAD SHX Text
PMIS 326598
AutoCAD SHX Text 12/03/2024
AutoCAD SHX Text As Noted
AutoCAD SHX Text C1
| Sheets and Views |
| CCC Cabin 321 323_recover-CCC CABIN 321 |
File details come from the government source that posted it. Updated .